Surety bonding in the U.S.: The perspective of the small general contractorJanuary 2014 (has links)
0 / SPK / specialcollections@tulane.edu
|
2 |
Smlouva o dílo ve výstavbě / Contract for work in constructionŠťásková, Kamila January 2017 (has links)
The main aim of this diploma thesis is to analyze the legal regulation of contract of work in construction industry, especially the regulation contained in the Act No. 89/2012 Coll., the Civil Code. I also focused on main changes connected with passing the new Civil Code and I clarified the essence of some new legal institutions. This thesis is divided into 9 chapters; some of them are further divided into minor sections. Besides that the thesis includes Content, Index of Abbreviations and Bibliography. First chapter focuses on setting the aim of this thesis and then the historical context of contract of work, its development from the antiquity to concurrence. Contemporary regulation of contract for work is being compared to the contract of purchase and I describe the essentials of contract for work, in particular contracting parties, their rights and duties and the subject of work. In the fourth chapter I focus on the finalization and disposition of the work, according to the Civil Code the work is finished only if it is proven that it can be used for its purpose. Next I analyze the price of the work and options that can be agreed by the contract parties in terms of the price and the payments. Regarding the price I also describe retentive price, penalties and the institute of price cut in the next...
|
3 |
An investigation into a distributed virtual reality environment for real-time collaborative 4D construction planning and simulationZhou, Wei January 2009 (has links)
The use and application of 4 Dimensional Computer Aided Design (4D CAD) is growing within the construction industry. 4D approaches have been the focus of many research efforts within the last decade and several commercial tools now exist for the creation of construction simulations using 4D approaches. However, there are several key limitations to the current approaches. For example, 4D models are normally developed after the initial planning of a project has taken place using more traditional techniques such as Critical Path Method (CPM). Furthermore, mainstream methodologies for planning are based on individual facets of the construction process developed by discrete contractors or sub-contractors. Any 4D models generated from these data are often used to verify work flows and identify problems that may arise, either in terms of work methods or sequencing issues. Subsequently, it is perceived that current 4D CAD approaches provide a planning review mechanism rather than a platform for a novel integrated approach to construction planning. The work undertaken in this study seeks to address these issues through the application of a distributed virtual reality (VR) environment for collaborative 4D based construction planning. The key advances lie in catering for geographically dispersed planning by discrete construction teams. By leveraging networked 4D-VR based technologies, multidisciplinary planners, in different places, can be connected to collaboratively perform planning and create an integrated and robust construction schedule leading to a complete 4D CAD simulation. Establishing such a complex environment faces both technological and social challenges. Technological challenges arise from the integration of traditional and recent 4D approaches for construction planning with an ad hoc application platform of VR linked through networked computing. Social challenges arise from social dynamics and human behaviours when utilizing VR-based applications for collaborative work. An appropriate 4D-based planning method in a networked VR based environment is the key to gaining a technical advancement and this approach to distributed collaborative planning tends to promote computer-supported collaborative work (CSCW). Subsequently, probing suitable CSCW design and user interface/interaction (UI) design are imperative for solutions to achieve successful applicability. Based on the foregoing, this study developed a novel robust 4D planning approach for networked construction planning. The new method of interactive definition was devised through theoretical analysis of human-computer interaction (HCI) studies, a comparison of existing 4D CAD creation, and 3D model based construction planning. It was created to support not only individual planners’ work but multidisciplinary planners’ collaboration, and lead to interactive and dynamic development of a 4D simulation. From a social perspective, the method clarified and highlighted relevant CSCW design to enhance collaboration. Applying this rationale, the study specified and implemented a distributed groupware solution for collaborative 4D construction planning. Based on a developed system architecture, application mode and dataflow, as well as a real-time data exchange protocol, a prototype system entitled ‘4DX’ was implemented which provides a platform for distributed multidisciplinary planners to perform real-time collaborative 4D construction planning. The implemented toolkit targeted a semi-immersive VR platform for enhanced usability with compatibility of desktop VR. For the purpose of obtaining optimal UI design of this kind of VR solution, the research implemented a new user-centred design (UCD) framework of Taguchi-Compliant User-Centred Design (TC-UCD) by adapting and adopting the Taguchi philosophy and current UCD framework. As a result, a series of UIs of the VR-based solution for multifactor usability evaluation and optimization were developed leading to a VR-based solution with optimal UIs. The final distributed VR solution was validated in a truly geographically dispersed condition. Findings from the verification testing, the validation, and the feedback from construction professionals proved positive in addition to providing constructive suggestions to further reinforce the applicability of the approach in the future.
|
4 |
Zhodnocení účinnosti managementu BOZP ve stavebnictví v ČR / Effectiveness evaluation of occupational safety and health management in civil engineering in the Czech RepublicKratina, Zdeněk January 2015 (has links)
Thesis deals with the development of risk management in the construction industry in Czech republic in time of the economic crisis since 2007. There is in detail described the present and paste state of the construction industry in this thesis, thanks to construction output index, the volume of construction output, etc. There is overview of accidents and deaths in costuction industry, history of risk management in the construction industry and the main reasones of injuries and deaths in the construction industry described in this thesis. The aim of this thesis is to inform about development and efectiveness of risk management and evaluate work injuries in construction industry with the assumption further development.
|
5 |
Rechtsschutz bei der Vergabe von Bauleistungen unterhalb der Schwellenwerte, unter besonderer Berücksichtigung der Praxis in SachsenPfau, Tilo 09 February 2011 (has links)
Die Dissertation befasst sich mit dem vergaberechtlichen Primärrechtsschutz unterhalb der EU-Schwellenwerte, welcher in der Praxis als nicht vorhanden bzw. als unterentwickelt bezeichnet werden muss. Dabei werden insbesondere die vom Freistaat Sachsen entwickelten Regelungen des § 9 SächsVergabeDVO untersucht, die in der Literatur vereinzelt als „Rechtsschutz light“ bekannt sind. Es werden Regelungslücken aufgezeigt sowie Verbesserungsmöglichkeiten für die sächsischen Regelungen vorgeschlagen. Für einen vollwertigen Rechtsschutz wäre aber eine Umsetzung auf Bundesebene notwendig und wünschenswert.
|
6 |
Obchodní centrum Mohelnice - stavebně technologický projekt / Department store Mohelnice - construction technological projectSovová, Romana January 2015 (has links)
The diploma thesis deals with construction technological project of department store in Mohelnice town – hypermarket Kaufland. It compiles in detail the most optimal proposal of technological construction process, working machinery, traffic proposal for transport, construction site equipment, schedule of work, inspection and test plan, safety of work, environment, and finally costing including bill of quantities etc. The thesis deals specifically main building object SO04, object of hypermarket, which is consisted of prefabricated reinforced concrete skeleton of single-storey building. I focus primarily on realization of gross building.
|
7 |
Skladová hala v Šakvicích - stavebně technologický projekt / Warehouse in Šakvice - construction technological projectKnotek, Vít January 2016 (has links)
Main goal of this thesis is effective design and comprehensible description of the assembly of reinforced concrete skeleton warehouse in Šakvice. In several chapters of this thesis is for preparing of this investor´s plan solved supplies prefabricated components. As well as their assembly into construction, equipment of construction site, used technologies, quality control and safety of performed works. There is great emphasis on the construction budget and its chronology. The aim was to use the rapid progress of construction of the supporting skeleton, taking into account the financial coast of the proposed technology.
|
8 |
Vybrané části stavebně technologického projektu pro Přestupní uzel Miroslav / Miroslav Bus Interchange - Selected parts of the construction planGrmela, Jan January 2017 (has links)
The diploma thesis contains selected parts of the building - technological project for the construction of the Miroslav bus interchange. This is a new building, which will improve the transport infrastructure and the safety of people at the site. Part of the diploma thesis is the technical report to the building and technological project, the time and financial plan, a study of the technological stages, budget and a detailed timetable, the organization of the building site, the technological regulation for the asphalt paving and the inspection and test plan, a plan concerning safety and dangers on a building.
|
9 |
Modelování vývoje hodnoty středního stavebního závodu v reálné konkurenci ČR / The Modelling of The Development of The Middle-Size Building Enterprise Value in The Real Competition of The Czech RepublicKřížovská, Eliška January 2020 (has links)
The dissertation thesis is elaborated to the theme “The Modelling of The Development of The Middle-Size Building Enterprise Value in The Real Competition of The Czech Republic“. In the introduction of the dissertation thesis, a relation of the chosen theme to the branch of Forensic Engineering is defined and a survey about a contemporary state of the solved problems is elaborated. Further on, the objectives of the dissertation thesis are stated there namely including a formulation of a problem. The dissertation thesis contains the basic data about the examined middle-size building enterprise of a regional significance and its competitive building enterprises. At all enterprises, a property evaluation by an assessment of a substantial value and a returns’ evaluation by a method DCF Entity are carried out. The component of the dissertation thesis is a proposal of a simple expert standard containing methodical recommendations at an assessment of a value of a building enterprise of a regional significance. This is the essential contribution of the dissertation thesis for the branch Forensic Engineering whose starting ascertainments are practical pieces of knowledge and experience with the behaviours of the middle-size building enterprises in a period of a financial crisis.
|