Return to search

Energy retrofit of an office building in Stockholm: feasibility analysis of an EWIS / Energieffektivisering av en kontorsbyggnad i Stockholm genom tilläggsisolering – en fallstudie

The energy retrofit of existing buildings has always been a challenging task to accomplish. The example of the Swecohuset building, proves how an integrated approach design between architectural and energetic aspects as well as the use of well-known and efficient technologies are key aspects to achieve the energy-saving goal. This work, in the first part describes the Swecohuset retrofit process, along with the reasons behind the choices which have led to the current result of a reduction by 2/3 of the energy need for space conditioning purposes. Then, in the second part, after a brief focus on the passive aspects which characterize the current energy performance of the building, it is carried out a feasibility analysis of an EWIS (external wall insulation system) by studying its interaction with a complex system as an optimization problem, with the main purpose of understanding the basis of the BPO and explore further building potentialities. / SIRen

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kth-190992
Date January 2016
CreatorsLapioli, Simone
PublisherKTH, Installations- och energisystem
Source SetsDiVA Archive at Upsalla University
LanguageEnglish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess
RelationTRITA-IES ; 2016:02

Page generated in 0.0026 seconds