Return to search

Intern materialhantering på Isaberg-Rapid

<p>Isaberg-Rapid has problems with their internal material handling. The goal with this report is to create a layout for a pilot group in the production. Furthermore will appropriate carriers be suggested and the way of communicate between the stock keeping unit through coating to the assembly group will be analyzed.</p><p>The focal point is on a pilot group where the assembly of staple guns occurs. We have reviewed the material handling in the pilot group. By doing a spaghetti diagram the assemblers’ movements in the group is being analyzed and from that a new layout is proposed that will facilitate the handling of material in the assembly group.</p><p>Besides the spaghetti diagram the report is based on observations, interviews, a process flow schedule, a layout flow schedule and calculations.</p><p>To make the material flow to the assembly group more effective a proposal with a supermarket has been developed. The reason for using a supermarket is also to minimize tied up capital after coating. The transportation of material is handled by a dedicated material handler to minimize the interruptions in work for the assemblers.</p><p>The carriers that are used in the assembly group has been reviewed and to easily handle these a proposal with FIFO lines has been developed to make it easier for the assemblers.</p>

Identiferoai:union.ndltd.org:UPSALLA/oai:DiVA.org:hj-9671
Date January 2009
CreatorsPersson, Johannes, Bohlin, Fredrik
PublisherJönköping University, JTH, Industrial Engineering and Management, Jönköping University, JTH, Industrial Engineering and Management
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, text

Page generated in 0.0036 seconds