The energy retrofit of existing buildings has always been a challenging task to accomplish. The example of the Swecohuset building, proves how an integrated approach design between architectural and energetic aspects as well as the use of well-known and efficient technologies are key aspects to achieve the energy-saving goal. This work, in the first part describes the Swecohuset retrofit process, along with the reasons behind the choices which have led to the current result of a reduction by 2/3 of the energy need for space conditioning purposes. Then, in the second part, after a brief focus on the passive aspects which characterize the current energy performance of the building, it is carried out a feasibility analysis of an EWIS (external wall insulation system) by studying its interaction with a complex system as an optimization problem, with the main purpose of understanding the basis of the BPO and explore further building potentialities. / SIRen
Identifer | oai:union.ndltd.org:UPSALLA1/oai:DiVA.org:kth-190992 |
Date | January 2016 |
Creators | Lapioli, Simone |
Publisher | KTH, Installations- och energisystem |
Source Sets | DiVA Archive at Upsalla University |
Language | English |
Detected Language | English |
Type | Student thesis, info:eu-repo/semantics/bachelorThesis, text |
Format | application/pdf |
Rights | info:eu-repo/semantics/openAccess |
Relation | TRITA-IES ; 2016:02 |
Page generated in 0.0022 seconds