Return to search

Centrala logistiska faktorer i en förädlingskedja för massproduktion av träpellets : Fallstudie på Kopparfors Pelletsfabrik

This examination work aims to describe how a supply chain around the biggest pellets factory in Sweden will be configured in a logistic perspective. The plant and associated infrastructure are in the building phase and will have production start on the 2 November 2009. The key question that is set in this examination work is to recognize the logistic processes which are essential for an effective flow of materials and information that link the source of supply with the ultimate customer. In order to get the answer, a flowcharting of these supply chain processes is required for understanding the pipeline activities such as input and storage of raw material, the production system and the output of pellets to the customers. The basis for this supply chain map is a model-based representation of these logistic processes and activities that are involved around the pellets factory. This model was configured according to scientific theories and the supply chain's fundamental concept. In these maps, the model will highlight the network of inter-linked activities in the system and finally show the opportunities for recommendations and improvements in productivity through reengineering those logistic processes.

Identiferoai:union.ndltd.org:UPSALLA1/oai:DiVA.org:hig-4958
Date January 2009
CreatorsWeinberger, Gottfried
PublisherHögskolan i Gävle, Ämnesavdelningen för industriell ekonomi
Source SetsDiVA Archive at Upsalla University
LanguageSwedish
Detected LanguageEnglish
TypeStudent thesis, info:eu-repo/semantics/bachelorThesis, text
Formatapplication/pdf
Rightsinfo:eu-repo/semantics/openAccess

Page generated in 0.003 seconds