• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 71
  • 10
  • 8
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • Tagged with
  • 105
  • 105
  • 49
  • 17
  • 16
  • 16
  • 16
  • 15
  • 15
  • 13
  • 12
  • 11
  • 10
  • 10
  • 9
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Drivkrafter för byggnadsarbetare i Halmstad : Med fokus på Maslows behovstrappa

Jelec, Nino January 2015 (has links)
Sammanfattning Titel - Drivkrafter för byggnadsarbetare- Med fokus på Maslows behovstrappa Kurs - Examensarbete 15hp Utgivningsår - 2015 Författare - Nino Jelec Handledare - Kristian Widén Nyckelord - Motivation, Produktivitet, Maslows Behovstrappa,byggnadsarbetare Syfte - Syftet med mitt arbete är att undersöka vad sommotiverar byggnadsarbetare och om man kananvända sig av Maslows behovstrappa på enbyggarbetsplats. Metod - Jag har använt mig av en kvantitativ metod i formav enkätundersökningar som jag har delat ut till byggnadsarbetare. Teori - Min teori kommer från Abraham Maslow somsammanställde en behovstrappa för att se vad som motiverade människor. Empiri - Min empiriska data var sammanställd genom attdela ut undersökningsenkäter till byggnadsarbetare i Halmstad. Slutsats - Min undersökning visade att Maslows behovstrappagår att användas fram till steg 3 men att arbetarna sedan inte fann steg 4 som är behovet av uppskattning särskilt viktigt för deras motivation och att de istället ansåg det sista steget i behovstrappan vara av vikt som är behovet av självförverkligande / Abstract Title - Incentives of construction workers – With focus onMaslow’s hierarchy of needs Course - Master’s dissertation 15hp Year of publication - 2015 Author - Nino Jelec Advisor - Kristian Widén Keywords - Motivation, Productivity, Maslow’s hierarchy ofneeds, Construction workers Purpose - The purpose of this work is to investigate whatmotivates construction workers and if Maslow’shierarchy of needs can be of any use at aconstruction site. Methodology - I had a quantitative approach and I have been usinga questionnaire survey on the construction workers. Theory - My theory comes from Abraham Maslows hierarchyof needs. Empirics - My empirical data was collected from questionnairesurveys done on construction workers in a citycalled Halmstad. Conclusions - My investigation shows that Maslows hierarchy ofneeds can be used up to level 3. The constructionworkers in my research didnot find level 4 to be of any big importance but theyfound level 5 to be of importance.
42

Managing immigrant construction workers in peninsular Malaysia : the economic perspective

Mustapa, Fara D. January 2014 (has links)
The function of the construction industry in an economy has proven to be beneficial, especially during the economic downturn. The nature of the products of the construction industry makes it possible for the government to utilise the industry as a means to accelerate and multiply the economy by utilising the fiscal budget to build infrastructures. By so doing, the economy will be multiplied as the construction industry is an industry that produces investment goods. However, due to the nature of the Malaysian construction sector, the expenses required to stimulate the economy could not be made to the maximum extent, as the industry relies heavily on immigrant construction workers to address its labour supply problem. Immigrant construction workers are known for their high tendency to remit their salary to their country of their origin. This scenario disturbs the economic cycle within the Malaysian economy and, hence, dampens the function of the construction industry as the multiplier-accelerator provider. This research was undertaken to better manage the cash flow economic cycle leakage by adopting some economic measures coupled with improvised management of immigrant construction workers exercised through legislation. The adopted research methodology used transformative mixed-methods to balance the limitations of a single research approach. A literature review of the economic models and tools were conducted in a search for the most suitable measures, while attempting to understand the nature of construction industry by highlighting the structure and the problems associated with the industry. Special attention was also given to investigate the motivation behind the human migration to justify and support the research. Other than issues involving the use of immigrant workers, special attention was given to issues of remittances and its impacts on the global economy. The findings underpinned by literature and the research findings were used to develop the conceptual framework to manage the economic cycle leakage that is entrenched in the construction industry s economic cycle. The integrated framework consists of economic, management and legislation and was developed to address the issues highlighted. The use of economic tools can only be materialised through better management and the execution of legislation. The framework was encapsulated in a combination of process protocol and a maturity framework to allow time for the policy makers to implement it. Considerations have been made to develop the framework to ensure the smooth transition its implementation. The framework was self-validated through formative evaluations where data were attained from several parties to reduce any bias perspective. In addition, most of the measures suggested were derived from interviews conducted among the respondents. Several benefits of the framework were identified. It is concluded that the impact of immigrant construction workers employment can be managed by considering the appropriate tools in the form of economic, managerial and legislation measures. This research has developed an integrated process protocol maturity framework that addresses the three aforementioned aspects. The framework is simple and easily understandable with detailed activity zones that entail specific tasks that must implemented by different parties. The developed framework is expected to aid the authorities in managing immigrant construction in Malaysia and to effectively manage these workers. The framework also allows time for its implementation through the maturity stages suggested.
43

Investigation into the lives of professional women in the construction industry

Ramedupe, Rachel 12 1900 (has links)
Thesis (MBA)--Stellenbosch University, 2014. / ENGLISH ABSTRACT: The purpose of this study is to make industry employers, teachers and career guides aware of the barriers that continue to hold back women from pursuing careers in the construction industry. This research study focused on females working in the construction industry and investigated the experiences of women who chose to study construction-related degrees. The goal was to communicate what influenced their choice to study degrees in the construction industry, and what factors are currently influencing their career development. This was done with the purpose of finding solutions to re-engineer and transform the industry and make a form of transformation. A quantitative research methodology was used as a means of collecting and analysing data. This comprised of questionnaires which were designed and distributed, using targeted sampling, to 82 women studying construction-related degrees and 54 women actively employed in professional positions in the South African construction industry. Respondents’ experiences were captured with quantitative data on education, course preference, family involvement, mentors, self-efficacy, women involvement, cultural influence, image of industry, reason for entering industry, motivator/influencer, traditional beliefs, social and cultural beliefs, government involvement, time, slow career progression, inclusive environment, queen bee syndrome, site conditions, discrimination and harassment. The data was analysed by using quantitative methods. Questionnaires were developed and ranked on a scale of one to five, namely strongly agree to strongly disagree and interpreted by means of counting the frequency of occurrence of answers to each ranked question. Percentages were then calculated and responses weighted according to average means. The findings and conclusions indicate the choices women make, what motivates women in South Africa to choose careers in the construction industry and the barriers encountered by them. The results from this study highlight the need for a shift in the industry; and the findings give employers, teachers and career guiders insight into what draws women into the industry and what underlying issues women face once in the industry. This provides as a guide for strategic change within educational environments and within the industry to encourage more women not only to draw themselves to find careers in the construction industry, but also retain them.
44

Hälsokontroller och beteendeförändring hos byggarbetare : en intervjustudie / Health surveillance and behavior change among construction workers : an interview study

Boutzas, Anna January 2016 (has links)
Förekomsten av ohälsa är mer vanligt i byggarbetabranschen än i andra branscher, p.g.a. arbetsolyckor och övriga förhållanden i arbetet. En av de viktiga resurserna till att förebygga skada och upprätthålla hälsa i arbetslivet, är företagshälsovård. Syftet med denna kvalitativa intervjustudie var att beskriva byggarbetares upplevelser om deras arbetshälsa/arbetsmiljö och om vad företagshälsovårdens hälsokontroller har haft för betydelse för deras beteendeförändring.   Fem byggarbetare som genomgått en hälsokontroll via företagshälsovård och åstadkommit en potentiell beteendeförändring som förbättrat hälsan, intervjuades. Den tematiska analysen av intervjuerna resulterade i fyra huvudteman: ”möjliggörande faktorer till en god arbetshälsa i byggarbetarens yrke”, ”begränsade faktorer till god arbetshälsa i byggarbetarens yrke”, ”konkreta resultat av företagshälsovårdens hälsokontroller” och ”fördelarna med företagshälsovårdens hälsofrämjande arbete”. Studiens resultat visar att byggarbetare upplevde sin arbetshälsa/arbetsmiljö som både positivt och negativt. Det positiva med arbetet var den sociala kontakten med kollegor och arbetsgivare och det negativt var arbetsmiljön som bidragit till sämre hälsa p.g.a. av muskuloskeletala skador och stress. Hälsokontroller bidrog till beteendeförändring som kan förebygga sjukdomar bland byggarbetarna.   Hälsokontrollen upplevdes som meningsfull då ett gott bemötande möjliggjorde en beteendeförändring samtidigt som en ökad insikt av att förbättra sin egen hälsa skett, efter negativa provsvar. Vidare forskning behövs om hur byggarbetares arbetshälsa kan förbättras genom företagshälsovårdens insatser. / The incidence of illness among construction workers is higher than average in other industries, because of accidents and other conditions at work. One of the most important resources to prevent injury and maintain health in the workplace, is the occupational health care. The aim of this qualitative study was to describe the construction workers experiences of their occupational health and work environment and about whether occupational health check-ups have had any significance for their behavior change. Five male construction workers who had underwent a health check and after that performed a behavior change, was recruited via an occupational care center. Data was collected by face to face and telefon interviews, that were subsequently transcribed and analysed by thematic analyse. The tematic analyse resulted in four main themes: "enabling factors for good health of the construction workers professional”, ”restricted factors to the good health of the construction worker's occupation", "benefits of occupational health promotion" and "concrete results of occupational health check-ups".   The construction workers experienced their occupational health and work environment as both positive and negative. The positive about work was the social contact with colleagues and employers, the negative was that the work environment contributed to poor health due musculoskeletal of injury and stress. Health check-ups contributed to behavior change and pontential prevention of diseases among construction workers.   The health check-ups was considered as being meaningful and enabled a change in behavior after understanding that they must change their lifestyle to avoid disease. Further research is needed on how to improve construction workers occupational health through occupational health services.
45

The relationship between organisational culture and employee job satisfaction within the Botswana construction industry

Mufanebadza, Justice Mufson January 2017 (has links)
This research report was submitted in partial fulfillment of the requirements for the degree of Master of Science (Building) in Project Management to the Faculty of Engineering and the Built Environment, School of Construction Economics and Management at the University of the Witwatersrand , 2017 / Problem Statement: Organisational culture determines employee remuneration, opportunities for promotion, interaction between employees and their job in general. It has a potential to affect the degree to which employees are satisfied with their jobs. If the impact is negative, this will create a problem of low employee morale, reduced performance, and hence low production levels. If this effect is positive, this may boost the morale of employees and increase performance and production. It is, therefore, important to understand the relationship between organisational culture and employee job satisfaction to maximize the benefits and reduce the negative impact. Purpose: The aim of this research was to find out if the prevailing organisational culture has an influence on employee job satisfaction with specific reference to the Botswana construction industry. The objectives of the research were to establish the prevailing and preferred organisational cultures, establish employee job satisfaction, and determine the relationship between organisational culture and employee job satisfaction. Methodology: Focusing on the Botswana construction industry and using a cross sectional study, two concurrent surveys were conducted to collect quantitative data for organisational culture and employee job satisfaction from three construction organisations selected to represent small, medium, and large organisations. Findings: The prevailing organisational culture in all the three organisations was found to be the market culture. The clan culture was found to be the preferred organisational culture in two of the organisations (the medium and large). The hierarchy culture was found to be the preferred organisational culture in the small organisation. Despite employees preferring different cultures (clan and hierarchy) to the prevailing culture (market), employees were generally satisfied with their current jobs, suggesting that there might be no relationship between organisational culture and employee job satisfaction and pointing to the possible existence of a third variable. Implications: The market culture which was found to be prevailing in all the three organisations is characterised by aggressive competition and a focus on winning a share of the market. This indicated that the construction industry was reacting to the current harsh economic conditions by adopting an aggressive survival strategy. By rejecting the prevailing market culture, employees might have felt neglected since the market culture does not focus on employees. Employees remained satisfied with their current jobs despite rejecting the prevailing organisational culture and this might be an indication that jobs are not available leaving employees with no option but to like the only jobs which they have. / MT2018
46

An evaluation of the Sekhukhuneland Development Programme 1998-2002 :|bthe lessons and recommendations from a labour-intensive construction-training programme in Sekhukhuneland, South Africa

Van Zandvoort, Hubert Evert 24 November 2008 (has links)
This MSc (Eng) Investigational Project Report entails the evaluation of the Sekhukhuneland Development Programme (SDP). The SDP is a joint initiative of the Donaldson Trust and the Research Centre for Employment Creation in Construction (WORK). Its objective is: to increase the use of labour-intensive methods in the rehabilitation and maintenance of rural roads and other infrastructure in order to contribute to employment generation, skills development, provision of infrastructure and poverty alleviation. In order to achieve this objective an “Association not for gain” called LITE (Labour Intensive Training and Engineering) was formed; the Donaldson Trust provided the finance, and the expertise was provided by The Research Centre (WORK) but with additional support by Employment Intensive Engineering Consultants (EIEC). As the contracting organisation evolved from nothing into the training and engineering company LITE, the number of employees rose from none to fourteen. The University of the Witwatersrand provided a number of students to the project site at Mohlaletse in Sekhukhuneland where they provided voluntary assistance as part of their studies. Many of these students were from the University of Twente in the Netherlands, and it was largely due to their commitment that the project enjoyed such healthy growth. Considering the meagre resources this growth was a remarkable achievement, and it was made possible, not only through the efforts of the students, but also through the acceptance and support of the community. This support included providing accommodation for both students and site management. With a minimum of resources local community members were trained and employed by the SDP over a prolonged period of three years. The SDP evolved into a new programme, the Mohlaletse Youth Service Programme (MYSP), funded by the Umsobomvu Youth Fund. Of the R1.700.000 donated to the SDP, R1.690.000 was used during the evaluated period. Of this sum approximately 50% was spent directly within the Mohlaletse and Monametse community. The SDP consisted out of three main phases. The organisation evolved during the first two phases from no organisation into LITE Section 21, an organisation that could deal with training and engineering based on a strong labour-intensive focus. During the Pilot Phase the programme focused on establishing contact with the community and proving that labouriii intensive construction method could work. The next phase was the Training Phase where the necessary team leaders were trained to perform a variety of construction techniques. These techniques range from drainage structure to roads and buildings. The last phase is the Construction Phase during which the construction went ahead as planned using fully trained team leaders from the local community. The total setting of the SDP was as follows: SDP Phases SDP Periods Organisation SDP Projects - Pilot Phase: Period 1999H None Period Projects Period 2000A Point-of-Fact (Pty) Ltd Period Projects - Training Phase: Period 2001A Period Projects Mohlaletse Money-Cant-Buy Section 21 Period Projects Monametse Period 2001H Period Projects Mohlaletse LITE - Section 21 Period Projects Monametse Period Project Compound - Construction Phase: Period 2002H Period Projects Mohlaletse Period Projects Monametse Period Project LITE-House and LITE-School The main reason for the success has been the substantial involvement of the local Mohlaletse community and the acceptance of the Site Management within the Community. Within the constraints of the programme definition and objectives, the SDP has been a success to its sponsors and beneficiaries. Major problems were encountered within the fields of Labour-Intensive Construction Methods and the Project Management Areas of Knowledge. These should be taken into consideration when a new Constructing-Training Programme is started in future.
47

The relationship between project performance of emerging contractors in government infrastructure projects and their experience and technical qualifications: an analysis of 30 projects conducted in the Mpumalanga Province over the 2011-2013 period

Mohlala, Fate Tharullo January 2016 (has links)
A research report submitted to the Faculty of Engineering and the Built Environment, University of the Witwatersrand, Johannesburg, in partial fulfilment of the requirements for the Degree of Master of Science in Engineering, 11 August 2015 / This research set out to investigate two relationships; the relationship between technical qualifications and emerging contractor project performance, and the relationship between experience and emerging contractor project performance. The focus was on emerging contractors in the public sector. This study was motivated by the notion that emerging contractors generally fail and have poor project performance. The objective of the report was to determine the general factors that affect emerging contractor performance and demonstrate the relationship between competence and project performance. Information pertaining to progress and performance for thirty projects from a government institution in Mpumalanga Province was collected. This information included contact details of the contractors who conducted the 30 government infrastructure projects. The contact details were used to collect contractors’ curriculum vitaes and company profiles in order to extract information on qualifications and experience. Literature has shown that the most prevalent issues facing emerging contractors in South Africa can be attributed to the contractors’ competencies. These competencies include skills, experience, qualifications and project management knowledge. Other factors that affect emerging contractor performance include project delays caused by late payments by clients, shortage of labour and lack of financial resources and equipment. The results of this study showed that contractors with technical qualifications and experience generally perform better than those with no technical background. It was also found that where there is no technical background, the level of education also affects the level of project performance. This study demonstrated the importance of the number of technical or construction related projects conducted by an emerging contractor company as compared to the number of years that the company has been in operation. The number of projects conducted, regardless of timeline, is more beneficial to project performance than the number of years in operation in the construction industry. This study recommends that focus should be drawn to the definite need to develop emerging contractor competence through skills development, training, collaborations and knowledge sharing. Competence development should focus on transferring technical knowledge and experience through policy formulation, collaboration of government and educational or training institutes. Focus should also be drawn to developing project management competence of emerging contractors in the South African public sector.
48

Historical Archaeologies of Overseas Chinese Laborers on the First Transcontinental Railroad

Molenda, John Paul January 2019 (has links)
This dissertation relies on anthropological, historical, and archaeological research in order to describe the historical archaeologies associated with Chinese immigrants to the United States who worked on the first transcontinental railroad in the mid-nineteenth century. The region of focus in the High Sierras region to the west of Truckee, California, in and around the Tahoe National Forest
49

A Monitoring System to Reduce Shoulder Injury Among Construction Workers

Alwasel, Abdullatif January 2011 (has links)
As the work force ages and workers retirement age increases, the number of workers suffering from Work-related Musculoskeletal Disorders (WMSDs) has increased. In a recent study, the U.S Bureau of Labor reported that 6.9% of all WMSDs affected shoulders. Electricians, carpenters, and related construction crafts appear to experience higher incidence of these injuries due the nature of their work that require them often to use Awkward shoulder postures. This research aims to develop a new monitoring system that measure the amount of time workers spend in awkward shoulder postures to help decrease the prevalence of cumulative shoulder injuries and to reduce the number of cases of shoulder WMSDs among construction workers. The monitoring system was designed and a feasibility study was conduct to compare the monitoring system with a state of the art motion tracking system. Overall the monitoring system was able to count the time spent in awkward posture as a discrete state sensor and it can be implemented in the field. However, results showed that the monitoring system in its current configuration require some future work for it to produce quantitatively precise results that can be used in the fields of biomechanics, robotics, and ergonomics.
50

Construction labour in Quebec : demand, supply, and income characteristics

Zanasi, Luigi. January 1982 (has links)
No description available.

Page generated in 0.06 seconds