1

[en] TECHNICAL E LEGAL ASPECTS RELATED TO THE EXPANSION PLANNING OF ELECTRICAL SYSTEMS IN THE BRAZILIAN NEW INSTITUTIONALONAL FRAMEWORK / [pt] ASPECTOS TÉCNICOS E LEGAIS ASSOCIADOS AO PLANEJAMENTO DA EXPANSÃO DE ENERGIA ELÉTRICA NO NOVO CONTEXTO REGULATÓRIO BRASILEIRO

MARCIO PEREIRA ZIMMERMANN 27 March 2008 (has links)
[pt] Até meados da década de 90 o setor elétrico brasileiro era constituído predominantemente por empresas verticalmente integradas, com controle estatal, federal ou estadual. A partir do ano de 1995, seguindo uma tendência internacional, começou a ser implantada uma reforma do modelo então vigente, com a promulgação da Lei n. 9.074. Com essa lei, foram dados os primeiros passos na direção de introduzir a competição na geração e na comercialização de energia elétrica, bem como iniciou-se o processo de privatização da distribuição. No ano seguinte foi criada a Agência Nacional de Energia Elétrica. Em 1998, como resultado do Projeto de Restruturação do Setor Elétrica (RE- SEB), a Lei n. 9.648 instituiu o Mercado Atacadista de Energia, e fez surgir um novo tipo de agente - os comercializadores. Além disso, esta lei estabeleceu o Operador Nacional do Sistema Elétrico - ONS. Assim, sem entrar no mérito de se analisar a eficiência, pode-se afirmar que no marco regulatório anterior (oriundo do projeto RESEB) as questões da operação eletro-energética, bem como da comercialização de energia elétrica, ficaram bem delineadas. Entretanto, a função planejamento ficou para ser discutida e detalhada em uma segunda etapa, que não aconteceu. Na realidade, ocorreu uma mudança da estrutura que dava suporte ao planejamento setorial. Foi extinto o Grupo Coordenador do Planejamento dos Sistemas Elétricos (GCPS), coordenado pela ELETROBRÁS, e em seu lugar, instituiu-se o Comitê Coordenador do Planejamento da Expansão dos Sistemas Elétricos (CCPE), na esfera do MME. Também, conferiu-se ao planejamento da expansão da geração e da transmissão um caráter indicativo. Essas mudanças, associadas à instabilidade que se verificou nas equipes responsáveis pela elaboração do planejamento, nos últimos anos, reduziram, na prática, a eficácia dessa função. Com o novo marco regulatório, consubstanciado pelas Leis no. 10.847 (criação da Empresa de Pesquisa Energética - EPE) e 10.848 (Nova Lei de Comercialização de Energia), de 15 de março de 2004, ocorreu o resgate dessa importante função integradora, atualmente em fase de consolidação e por meio do Decreto n. 5.267 houve a reestruturação do Ministério de Minas e Energia, com a criação de uma Secretaria de Planejamento e Desenvolvimento Energético que coordenasse este processo, a qual veio instrumentar o MME, para que o art. 174º da Constituição Federal efetivamente fosse implementado, já que planejamento é função indelegável do Governo. Este trabalho tem dois objetivos básicos: (i) descrever os principais aspectos do ordenamento regulatório vigente para o setor elétrico brasileiro, analisando as diversas leis e decretos e suas sucessivas atualizações, destacando o papel das instituições criadas e contextualizando a importante função do planejamento setorial; e (ii) analisar a questão do planejamento energético no marco regulatório mais recente, com ênfase no setor elétrico, destacando as responsabilidades pela condução do processo de planejamento, as etapas de implementação, a inter-relação do setor elétrico com os demais setores energéticos, bem como os aspectos técnicos, econômicos e metodológicos associados nos horizontes de curto (10 anos) e longo (30 anos) prazos. / [en] From the Law nº 9,074, issued in 1995, the Brazilian electrical sector experienced the starting of a reform in its institutional framework. Following an international trend, this law introduced the competition in the generation and commercialization areas, as well as started the privatization process of the distribution companies. In the following year, the electrical sector regulatory agency was created. In 1998, as a result of the Electrical Sector Restructuring Project (RE-SEB), the Law nº 9,648 set the Wholesale Energy Market, e a new type of agent emerged - the trading companies. Besides that, this law created the Independent System Operator. Therefore, without analyzing how efficient it was, one can state that in the institutional framework introduced by the RE-SEB Project, the issues related with system operation and energy trading were well defined. On the other hand, the expansion planning aspects were neglected and left to be discussed and detailed in a second phase, which did not take place. Actually, a change on the institutional arrangement that supported the expansion planning activities was introduced: The Electrical System Planning Coordination Group (GCPS), chaired by ELETROBRÁS, was replaced by the Electrical System Expansion Planning Coordination Council (CCPE), now under the MME. Also, the generation expansion planning became indicative. These changes, associated to the irregularity of the staff in charge of the planning studies, led to the decrease of the effectiveness of this important function in the last years. However, the new institutional framework put in place in 2004 with the Laws no. 10,847 (establishment of Empresa de Pesquisa Energética - EPE) and 10,848 (New Energy Trading Law) promoted the renovation of this very import integrating function, which is now in a consolidation phase. This work has two basic objectives: describe the main aspects of the electrical sector legal framework, analyzing the several laws and decrees and their updating, highlighting the new institutions and the important function of the expansion planning; and (ii) analyze the issue of the energy planning in the new institutional framework, with emphasis in the electrical sector, stressing the roles of the institutions involved in the planning process, the implementing phases, the interface between the electrical sector and the other energy sectors, as well as the technical, economic and methodological aspects associated to the short (10 years) and long (30 years) term planning horizons.
2

[en] CONSTRUCTIVE METAHEURISTIC ALGORITHM FOR SOLVING TRANSMISSION EXPANSION PLANNING PROBLEMS / [pt] ALGORITMO METAHEURÍSTICO CONSTRUTIVO PARA SOLUÇÃO DO PROBLEMA DE PLANEJAMENTO DA EXPANSÃO DA TRANSMISSÃO

FERNANDO APARECIDO DE ASSIS 04 December 2018 (has links)
[pt] O planejamento da expansão da transmissão (PET) visa identificar reforços para a rede a fim de permitir uma adequada interligação entre a demanda e a geração de energia elétrica, ambas previstas para um determinado horizonte futuro de planejamento. Um bom plano de expansão deve garantir o adequado equilíbrio entre o custo de investimento e o custo de operação, mantendo ainda um nível satisfatório de confiabilidade no fornecimento da energia. Entretanto, a identificação de bons planos de expansão para a rede de transmissão tem se tornado uma tarefa cada vez mais difícil. Isso se deve, principalmente, às características e dimensões dos sistemas atuais e, ainda, às incertezas inerentes ao problema. Dessa forma, torna-se necessário o desenvolvimento de ferramentas cada vez mais ela-boradas para auxílio dos planejadores. Neste sentido, é proposto nesta tese de dou-torado um algoritmo metaheurístico construtivo, denominado AMC-PET, o qual realiza um processo gradual e concomitante de construção de soluções viáveis (planos de expansão). Por meio de mecanismos baseados principalmente em índices de sensibilidade para avaliação dos reforços candidatos e na troca de informações entre as soluções correntes, o processo construtivo proposto é conduzido, parcimoniosamente, na direção de planos de excelente qualidade. Para validação da metodologia proposta, é utilizado o problema PET estático de longo prazo, considerando o critério de segurança N-1 para a rede de transmissão. Um mode-lo linearizado de rede com a inclusão de perdas ôhmicas é utilizado para análise das configurações obtidas. Dois sistemas teste, comumente utilizados neste tópico de pesquisa e, também, um sistema real de grande porte, que corresponde à rede elétrica do sul do Brasil, são empregados na validação. / [en] The transmission expansion planning (TEP) aims to identify reinforcements for the network in order to allow an adequate interconnection between load and electric power generation, both foreseen for a given future planning horizon. A good expansion plan must ensure the proper balance between investment and operating costs, while preserving a satisfactory reliability level in the energy supply. However, identifying good expansion plans for the transmission network has become an increasingly difficult task. This is mainly due to the characteristics and dimensions of current power systems and also to the uncertainties inherent to the problem. Thus, it becomes necessary to develop even more elaborate tools to assist system planners. This doctoral thesis proposes a new optimization tool named constructive metaheuristic algorithm (CMA-TEP). The proposed CMA-TEP tool performs a gradual and parallel process of building feasible solutions (expansion plans). By means of mechanisms mainly based on sensitivity indices for the evaluation of candidate reinforcements and on the information exchange among current solutions, the proposed constructive process is parsimoniously conducted towards high quality plans. To verify the performance of the proposed methodology, the long-term static PET problem considering the N-1 security criterion for the transmission network is solved. A linearized network model with the inclusion of ohmic losses is used to analyze the obtained configurations. Two test systems, commonly utilized in this research area, and also a real large network, which corresponds to the electric grid of Southern Brazil, are used to validate the proposed method.
3

[en] TRANSMISSION EXPANSION PLANNING CONSIDERING THE INTERMITTENCY OF WIND GENERATION / [pt] PLANEJAMENTO DA EXPANSÃO DA TRANSMISSÃO CONSIDERANDO A INTERMITÊNCIA DA GERAÇÃO EÓLICA

JERSON ERASMO LEON ALMEIDA 23 January 2018 (has links)
[pt] O planejamento da expansão da transmissão (PET) visa identificar os novos reforços a serem implementados na rede do sistema elétrico de potência, necessá-rios para assegurar uma adequada interligação entre a demanda e a geração do sistema, ambas previstas para o horizonte de planejamento. Um bom plano de expansão deve garantir o equilíbrio entre os custos de investimento e operação, mantendo um nível satisfatório de continuidade no fornecimento de energia. En-tretanto, a identificação de boas soluções para o PET tem se tornado uma tarefa cada vez mais difícil. Isso se deve, principalmente, às características e dimensões dos sistemas atuais, incluindo o aumento na dependência de fontes renováveis, e à não linearidade e natureza combinatória do problema de otimização. Nesta dissertação é proposta uma nova metodologia para resolver o proble-ma PET com alta penetração de energia renovável, em particular a eólica. A me-todologia é baseada na aplicação de uma nova ferramenta de otimização para so-lução do PET estático, a qual é classificada como metaheurística construtiva, onde soluções viáveis de boa qualidade são paralelamente construídas a partir da topo-logia inicial, por meio de adições graduais de reforços mais atrativos para a rede. Outras heurísticas são também utilizadas. Ênfase é dada à modelagem de cenários de geração eólica, que representam a energia renovável da rede a ser planejada, a qual deverá permitir uma operação flexível e adaptada à intermitência destas fon-tes. São utilizados o critério de segurança N-1 e o modelo linear DC de rede, com a consideração de perdas ôhmicas. Uma variante do sistema IEEE RTS, com inserção de fontes eólicas, é utilizada para testar a metodologia proposta. / [en] Transmission expansion planning (TEP) aims to identify the new reinforce-ments to be installed in the electric power system, necessary to ensure an adequate interconnection between demand and generation of the system, both foreseen for the planning horizon. A good expansion plan should ensure a balance between investment and operating costs, while maintaining a satisfactory level of continui-ty in the energy supply. However, identifying good expansion solutions for TEP has become an increasingly difficult task. This is mainly due to the characteristics and dimensions of the current systems, including the increase in the dependence of renewable sources, and the nonlinearity and combinatorial nature of the optimi-zation problem. In this dissertation, a new methodology is proposed to solve the TEP prob-lem with high penetration of renewable energy, in particular wind power. The methodology is based on the application of a new optimization tool for static TEP solution, which is classified as a constructive metaheuristic, where feasible solu-tions of good quality are simultaneously constructed from the initial topology of the network, through incremental additions of reinforcements more attractive to the grid. Other heuristics are also used. Emphasis is given to the modeling of wind power scenarios, which represent the renewable energy of the network to be planned, which should allow a flexible operation and adapted to the intermittency of these sources. The security criterion N-1 and the linear DC network model are used, with the consideration of ohmic losses. A variant of the IEEE RTS sys-tem, with insertion of wind sources, is used to test the proposed methodology.
4

[en] IMPACT OF SOCIOENVIRONMENTAL LICENSING ON TRANSMISSION EXPANSION PLANNING / [pt] IMPACTOS DOS LICENCIAMENTOS SOCIOAMBIENTAIS NO PLANEJAMENTO DA EXPANSÃO DA TRANSMISSÃO

CARLOS PHELIPE ROZA ANDRADE 26 April 2022 (has links)
[pt] O planejamento da expansão da transmissão tem por objetivo identificar o conjunto de novas linhas de transmissão que serão instaladas na rede elétrica, a fim de garantir a segurança e a qualidade do sistema, atendendo ao crescimento da demanda. No Brasil, o primeiro estágio do planejamento consiste em definir e avaliar o corredor para locação das linhas candidatas. Nesta etapa são definidas informações como cabo escolhido, preços médios, tempo de comissionamento, impactos socioambientais e informações sobre a região. No estágio seguinte ocorre o leilão de transmissão em que vários investidores competem pelos lotes de transmissão. No último estágio, o ganhador do leilão é o responsável pela instalação e comissionamento da linha de transmissão. Apesar do levantamento feito no estágio inicial, os projetos de linha de transmissão podem sofrer atrasos e aumentos no custo final, principalmente, por questões de licenciamentos ambientais, desvios do traçado devido a travessias e interferências com áreas protegidas. A presente dissertação propõe metodologia para dimensionamento e precificação da linha de transmissão, ambos de acordo com os critérios e banco de dados da ANEEL, de forma a acelerar e facilitar o processo de planejamento. Com o intuito de evitar atrasos e prever interferências socioambientais, a segunda parte do trabalho apresenta uma metodologia que consiste em localizar e identificar cruzamentos e interferências com áreas protegidas de caráter ambiental e/ou infraestrutural no território brasileiro, a partir das coordenadas do traçado da linha de transmissão em análise. A terceira parte do trabalho verifica, a partir dos resultados anteriores, o impacto no planejamento da expansão da transmissão através de um modelo de programação linear inteira mista considerando fluxo de potência CC, despacho econômico e critério N-1. / [en] The transmission expansion planning aims at identifying a set of new power lines to be installed on the grid, in order to guarantee the reliability and quality of the system, meeting the demand growth. In Brazil, the first stage of planning consists of defining e survey the corridor for the transmission line siting. At this stage it is defined data such as conductor chosen, average prices, commissioning time, socioenvironmental impacts and information about the region. In the following stage, occurs the auction which several investors compete for the transmission lots. In the last stage, the winner of the auction becomes responsible for the installation and commissioning. Despite the survey of the initial stage, the transmission lines undergo delays and additional costs, mainly, due to environmental licensing, changes of the defined route due to crossing and interferences with protected areas. The present dissertation proposes a methodology to design and price the transmission line, both accordingly to the ANEEL database and criteria, in order to accelerate and facilitate the planning process. Aiming to avoid delays and foreseeing socioenvironmental impacts, the second part of the dissertation presents a methodology that consists of locating and identifying crossings and interferences with protected areas of environmental and/or infrastructural aspect on the Brazilian territory, from the coordinates of the transmission line route in analysis. The third part verifies, from the previous results, the impact on the transmission expansion planning through a model based on a mixed-integer linear programming, considering a DC power flow, unit commitment and N-1 criteria
5

[pt] PLANEJAMENTO DA EXPANSÃO DA TRANSMISSÃO COM CRITÉRIOS DE SEGURANÇA VIA ALGORITMO GENÉTICO ESPECIALIZADO / [en] TRANSMISSION EXPANSION PLANNING WITH SECURITY CRITERIA VIA SPECIALIZED GENETIC ALGORITHM

IAMBERG SOUZA DA SILVA 12 January 2021 (has links)
[pt] A solução do problema de planejamento da expansão da transmissão (PET) tem por objetivo geral identificar reforços a serem construídos na rede de forma a garantir a adequada interligação entre carga e geração, previstos para um determinado horizonte de estudo. No processo de solução desse problema, busca-se manter o equilíbrio ótimo entre os custos envolvidos (investimento e operação) e os níveis de qualidade e desempenho na operação do sistema reforçado. Nesse sentido, é proposta nesta dissertação de mestrado uma ferramenta de otimização especializada para solução do problema PET, a qual é baseada na técnica metaheurística Algoritmo Genético. A ferramenta proposta, denominada Algoritmo Genético Especializado (AGE-PET), faz uso de informações heurísticas fundamentadas em análises atualizadas de fluxo de potência da rede realizadas durante o processo evolutivo de solução do problema. Essas informações heurísticas são traduzidas por meio de índices de sensibilidade, os quais são integrados aos operadores genéticos inerentes à ferramenta, conduzindo a solução do problema na direção de planos de expansão de boa qualidade. Para análise e validação da metodologia proposta, é solucionado o problema PET estático de longo prazo, considerando o modelo linearizado DC com perdas ôhmicas e atendimento do critério de segurança N-1 para a rede de transmissão. Sistemas elétricos de transmissão com diferentes características e dimensões, incluindo um subsistema atual da rede interligada brasileira, são empregados nos estudos realizados. / [en] The main goal in the solution of the transmission expansion planning (TEP) is to identify reinforcements to be built in the network in order to guarantee the adequate interconnection between load and electric power generation, both foreseen for a given future planning horizon. In the process of solving this problem, the aim is to maintain the optimal balance between the costs involved (investment and operation) and the levels of quality and performance in the operation of the reinforced system. Thus, it is proposed in this dissertation a specialized optimization tool for solving the TEP problem, which is based on the metaheuristic Genetic Algorithm technique. The proposed tool, called Specialized Genetic Algorithm (SGA-TEP), makes use of heuristic information based on updated network power flow analyses carried out during the evolutionary process of solving the problem. This heuristic information is translated by means of sensitivity indices, which are integrated with the genetic operators inherent to the tool, leading to the solution of the problem in the direction of good quality expansion plans. For analysis and validation of the proposed methodology, the long-term static TEP problem is solved, considering the linearized DC model with ohmic losses and the compliance of the N-1 security criterion for the transmission network. Electric transmission systems with different characteristics and dimensions, including a recent subsystem of the Brazilian interconnected grid, are used in the case studies.
6

[en] A REGULARIZED BENDERS DECOMPOSITION WITH MULTIPLE MASTER PROBLEMS TO SOLVE THE HYDROTHERMAL GENERATION EXPANSION PROBLEM / [pt] UMA DECOMPOSICAO DE BENDERS COM MÚLTIPLOS PROBLEMAS MASTERS REGULARIZADA PARA RESOLVER O PROBLEMA DA EXPANSÃO DA GERAÇÃO HIDROTERMICA

ALESSANDRO SOARES DA SILVA JUNIOR 15 September 2021 (has links)
[pt] Este trabalho explora a estrutura de decomposição de um problema de planejamento da expansão da geração hidrotérmica, utilizando uma integração entre uma Decomposição de Benders modificada e um Progressive Hedging. Consideramos uma representação detalhada das restrições cronológicas de curto prazo, com resolução horária, baseando-se em dias típicos para cada etapa. Além disso, representamos a natureza estocástica de uma política operacional hidrotérmica multiestágio por meio de uma Regra de Decisão Linear otimizada, garantindo decisões de investimento compatíveis com uma política operacional não antecipativa. Para resolver este problema de otimização em grande escala, propomos um método de decomposição de Benders aprimorado com várias instâncias do problema mestre, onde cada uma delas é reforçada por cortes primários além dos cortes de Benders gerados a cada candidato a solução do mestre. Nossa nova abordagem permite o uso de termos de penalização de Progressive Hedging para fins de regularização. Mostramos que o algoritmo proposto é 60 porcento mais rápido que os tradicionais e que a consideração de uma política operacional não antecipativa pode economizar, em média, 8.27porcento do custo total em testes fora da amostra. / [en] This paper exploits the decomposition structure of the hydrothermal generation expansion planning problem with an integrated modified Benders Decomposition and Progressive Hedging approach. We consider a detailed representation of hourly chronological short-term constraints based on typical days per month and year. Also, we represent the multistage stochastic nature of the hydrothermal operational policy through an optimized linear decision rule, thereby ensuring investment decisions compatible with a nonanticipative implementable operational policy. To solve the resulting large-scale optimization problem, we propose an improved Benders Decomposition method with multiple instances of the master problem, each of which strengthened by primal cuts and new Benders cuts generated by each master s trial solution. Additionally, our new approach allows using Progressive Hedging penalization terms for regularization purposes. We show that our method is 60 percent faster than the traditional ones and also that the consideration of a nonanticipative operational policy can save, on average, 8.27 percent of the total cost in out-of-sample tests.
7

[en] TRANSMISSION EXPANSION PLANNING CONSIDERING ENERGY STORAGE SYSTEMS / [pt] PLANEJAMENTO DA EXPANSÃO DA TRANSMISSÃO CONSIDERANDO SISTEMAS DE ARMAZENAMENTO DE ENERGIA

JUAN PABLO LEAL GONZALEZ 11 January 2019 (has links)
[pt] O planejamento da expansão da transmissão (PET) visa identificar novos reforços para a rede, permitindo uma conexão tecnicamente adequada entre demanda e geração de energia elétrica, ambas previstas para um determinado horizonte de planejamento. Um bom plano de expansão deve garantir o equilíbrio entre os custos de investimento e operação, mantendo um nível satisfatório de segurança no fornecimento de energia elétrica. Entretanto, a identificação de bons planos de expansão para o PET tem se tornado uma tarefa cada vez mais difícil. Isso se deve, principalmente, às características e dimensões dos sistemas atuais, a não linearidade e natureza combinatória do problema de otimização e às incertezas presentes nos dados. Os erros de previsão, a indisponibilidade de equipamentos e a disponibilidade dos recursos naturais são parâmetros que variam de forma aleatória e inserem um alto grau de incerteza nos sistemas elétricos, o qual aumenta proporcionalmente com o horizonte de planejamento. Uma das incertezas mais relevantes a ser gerenciada nas próximas décadas será a capacidade de geração oriunda de fontes renováveis, em particular as eólicas, devido à sua grande variabilidade. A utilização de dispositivos de armazenamento permitirá melhor aproveitamento dessas fontes e, portanto, torna-se necessário o desenvolvimento de ferramentas computacionais capazes de considerar tais dispositivos no problema PET. Esta dissertação apresenta uma nova metodologia de apoio ao problema PET inserindo armazenadores de energia elétrica para aumentar o aproveitamento de fontes renováveis no sistema. Isso, respeitando as restrições de segurança da rede, acompanhando à curva de demanda e levando em consideração as variáveis operativas destes dispositivos. A possibilidade de incluir sistemas de armazenamento de energia elétrica é avaliada através de uma análise custo-benefício. A metodologia proposta é aplicada a um sistema teste, submetido a diversas condições operativas, e os resultados obtidos são amplamente discutidos. / [en] The transmission expansion planning (TEP) aims at identifying new reinforcements for the network, allowing a technically adequate connection between demand and generation of electric energy, both foreseen for a given planning horizon. A good expansion plan must ensure a balance between investment and operating costs, while maintaining a satisfactory level of security of the electric energy supply. However, identifying good expansion plans for TEP has become an increasingly difficult task. This is mainly due to the characteristics and dimensions of the current systems, the nonlinearity and combinatorial nature of the optimization problem, and the uncertainties present in the data. Forecasting errors, equipment unavailability, and the availability of natural resources are parameters that vary in a random way and insert a high degree of uncertainty in the electrical system, which proportionally increases with the planning horizon. One of the most relevant uncertainties to be managed in the upcoming decades will be the generation capacity from renewable sources, particularly wind power, due to its great variability. Storage devices will allow better use of these sources and, therefore, it becomes necessary to develop computational tools capable of considering such devices in the TEP problem. This dissertation presents a new methodology to support the TEP problem by inserting electric energy storage to increase the use of renewable energy in the system, while respecting the security restrictions of the network, following the demand curve and taking into account the operational variables of these devices. The possibility of including electric energy storage systems is evaluated through a costbenefit analysis. The proposed methodology is applied to a test system, subject to various operating conditions, and the obtained results are widely discussed.
8

[pt] ENSAIOS EM MODELOS DE DOIS ESTÁGIOS EM SISTEMAS DE POTÊNCIAS: CONTRIBUIÇÕES EM MODELAGEM E APLICAÇÕES DO MÉTODO DE GERAÇÃO DE LINHAS E COLUNAS / [en] ESSAYS ON TWO-STAGE ROBUST MODELS FOR POWER SYSTEMS: MODELING CONTRIBUTIONS AND APPLICATIONS OF THE COLUMN-AND-CONSTRAINT-GENERATION ALGORITHM

ALEXANDRE VELLOSO PEREIRA RODRIGUES 07 December 2020 (has links)
[pt] Esta dissertação está estruturada como uma coleção de cinco artigos formatados em capítulos. Os quatro primeiros artigos apresentam contribuições em modelagem e metodológicas para problemas de operação ou investimento em sistemas de potência usando arcabouço de otimização robusta adaptativa e modificações no algoritmo de geração de linhas e colunas (CCGA). O primeiro artigo aborda a programação de curto prazo com restrição de segurança, onde a resposta automática de geradores é considerada. Um modelo robusto de dois estágios é adotado, resultando em complexas instâncias de programação inteira mista, que apresentam variáveis binárias associadas às decisões de primeiro e segundo estágios. Um novo CCGA que explora a estrutura do problema é desenvolvido. O segundo artigo usa redes neurais profundas para aprender o mapeamento das demandas nodais aos pontos de ajuste dos geradores para o problema do primeiro artigo. O CCGA é usados para garantir a viabilidade da solução. Este método resulta em importantes ganhos computacionais em relação ao primeiro artigo. O terceiro artigo propõe uma abordagem adaptativa em dois estágios para um modelo robusto de programação diária no qual o conjunto de incerteza poliedral é caracterizado diretamente a partir dos dados de geração não despachável observados. O problema resultante é afeito ao CCGA. O quarto artigo propõe um modelo de dois estágios adaptativo, robusto em distribuição para expansão de transmissão, incorporando incertezas a longo e curto prazo. Um novo CCGA é desenvolvido para lidar com os subproblemas. Finalmente, sob uma perspectiva diferente e generalista, o quinto artigo investiga a adequação de prêmios de incentivo para promover inovações em aspectos teóricos e computacionais para os desafios de sistemas de potência modernos. / [en] This dissertation is structured as a collection of five papers formatted as chapters. The first four papers provide modeling and methodological contributions in scheduling or investment problems in power systems using the adaptive robust optimization framework and modifications to the column-and-constraint-generation algorithm (CCGA). The first paper addresses the security-constrained short-term scheduling problem where automatic primary response is considered. A two-stage robust model is adopted, resulting in complex mixed-integer linear instances featuring binary variables associated with first- and second-stage decisions. A new tailored CCGA which explores the structure of the problem is devised. The second paper uses deep neural networks for learning the mapping of nodal demands onto generators set point for the first paper s model. Robust-based modeling approaches and the CCGA are used to enforce feasibility for the solution. This method results in important computational gains as compared to results of the first paper. The third paper proposes an adaptive data-driven approach for a two-stage robust unit commitment model, where the polyhedral uncertainty set is characterized directly from data, through the convex hull of a set of previously observed non-dispatchable generation profiles. The resulting problem is suitable for the exact CCGA. The fourth paper proposes an adaptive two-stage distributionally robust transmission expansion model incorporating long- and short-term uncertainties. A novel extended CCGA is devised to tackle distributionally robust subproblems. Finally, under a different and higher-level perspective, the fifth paper investigates the adequacy of systematic inducement prizes for fostering innovations in theoretical and computational aspects for various modern power systems challenges.