• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 132
  • 27
  • 22
  • 20
  • 6
  • 5
  • 4
  • 4
  • 3
  • 3
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 239
  • 239
  • 239
  • 129
  • 119
  • 117
  • 115
  • 106
  • 106
  • 94
  • 93
  • 80
  • 78
  • 74
  • 71
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
231

Návrh ocenění podniku / Value Estimating of Company

Leitner, Dominik January 2013 (has links)
The subject of this diploma thesis is valuation of the production company XY, s.r.o. by using income- based valuation methods. In the first part of this thesis is a strategic analysis, financial analysis and SWOT analysis. In conclusion are used income- based methods and determine the value of the company at 31.12.2011.
232

Stanovení hodnoty podniku / Firms Value Estimation

Kučírek, David January 2014 (has links)
This thesis aims to estimate the value of the company Vodovody a kanalizace Havlíčkův Brod with appraisal methods. The first step is the strategic analysis and the financial analysis of the company. The financial plan, required for the actual appraisal, is processed as the final task of the preparatory part before the appraisal. The final part contains estimated costs of capital, long-term growth rate and the actual value of the company, including the evaluation of the appraisal.
233

Stanovení hodnoty podniku výnosovou metodou / Valuation of the Firm by Using Income Capitalization Approach

Skryjová, Petra January 2016 (has links)
This diploma thesis is focused on valuation of the firm KASKO - Formy spol. s r.o. by using income-based valuation method to the date 31. 12. 2014. The theoretical part deals with the explanation of basic concepts the valuation and describe methods used for determining the value of the company. In the practical part of this thesis is the strategic and financial analysis, proposal of the financial plan. In conclusion of the thesis are contained weighted average cost of capital and the valuation of the company according to the method discounted cash flow and economic value added.
234

Stanovení hodnoty podniku výnosovou metodou / Valuation of the Firm by Using Income Capitalization Approach

Kovaříková Oweis, Sabina January 2016 (has links)
This master thesis deals with the estimation of the value of enterprise PREFA KOMPOZITY a.s. via income based methods. Concretely determined by the methods of discounted cash flow and economical value added. In the theoretical part are described theoretical foundations and procedures used for valuation of enterprise. The practical part is pattern of theoretical part and consists of strategic analysis, financial analysis, SWOT analysis and also of the procedure determined on the basis of applied method of valuation. Result of the thesis is concrete determined value of the enterprise.
235

Ein Verfahren zur Wertermittlung von bergbaubeeinflussten Immobilien unter Verwendung des DCF-Verfahrens und der Fuzzy-Logik: Ein Verfahren zur Wertermittlung von bergbaubeeinflussten Immobilien unter Verwendung des DCF-Verfahrens und der Fuzzy-Logik

Romańska-Sobol, Anna 23 April 2013 (has links)
Die vorliegende Arbeit beschäftigt sich mit der Entwicklung einer Methode zur Wertermittlung von bergbaubeeinflussten Immobilien, welche die wesentlichen Bergbaurisiken berücksichtigt. Die Untersuchungen ergaben, dass das Risiko von Investitionen in bergbaubeeinflusste Immobilien durchschnittlich dreimal größer ist als das Risiko von Investitionen in Immobilien ohne Bergbaueinflüsse. Für die Ermittlung des Risikos kamen eine immobilien- und eine bergbauspezifische Komponente zum Einsatz. Letztere umfasst Prognosen zu potentiellen Oberflächenvernässungen, zur Sickerwassergefahr und zu bergbaubedingten Wertminderungen von Gebäuden unter besonderer Berücksichtigung der Gebäudeempfindlichkeit gegenüber bergbauinduzierten Bodenbewegungen. Für die Wertermittlung von Immobilien kam das Discounted Cash Flow-Verfahren zur Anwendung. Der Diskontfaktor wurde mit Hilfe eines speziell entwickelten Fuzzy-Modells bestimmt. Die erstellte Bewertungsmethode kann als relevante Entscheidungshilfe für Investitionen in Bergbaugebiete dienen.
236

Relative or Discounted Cash Flow Valuation on the Fifty Largest US-Based Corporations on Nasdaq : Which of these valuation methods provides the most accurate valuation forecast?

Öhrner, Marcus, Öhman, Otto January 2023 (has links)
The topic of this Bachelor Thesis is “Which of these valuation methods provides the most accurate valuation forecast”. Assuming that the year is 2020, the goal of this thesis is to forecast the future stock prices of the fifty largest US-based companies on the Nasdaq stock exchange for 2021 and 2022. By using a quantitative method and looking ten years back at historical data. We determine which valuation method provides the most accurate stock price when conducted in a non-sector specific sample by comparing predicted prices to actual stock prices and discussing the results. There are several ways to evaluate a company and the ones being utilized in this thesis are the discounted cash flow valuation method, the price-to-earnings ratio method (equity multiple), and enterprise value to enterprise value before interest, tax, and depreciation (firm multiple). Our results show that when reviewing the valuations of multiple companies in different sectors the relative valuation methods provide better predictions with EV/EBITDA rather than the discounted cash flow method. This thesis provides the reader with a comprehensive overview of these different valuation methods and their effectiveness in providing valuation forecasts. The result of this thesis is beneficial for policymakers, investors, and financial analysts when forecasting future stock prices.
237

Tržní oceňování podniku jako podklad pro strategická rozhodnutí / Estimation of the Company Market Value

Procházka, Tomáš January 2008 (has links)
The thesis assesses market value of company CENTA, spol. s r.o. for strategic decision purposes. The crucial method is income-based valuation method, which is assisted by asset-based valuation method. The first part of the thesis includes strategic, financial and SWOT analysis. Afterwards particular valuation methods are applied. In conclusion statement of value as at 31.12.2006 is reported.
238

Modelling of input data uncertainty based on random set theory for evaluation of the financial feasibility for hydropower projects / Modellierung unscharfer Eingabeparameter zur Wirtschaftlichkeitsuntersuchung von Wasserkraftprojekten basierend auf Random Set Theorie

Beisler, Matthias Werner 24 August 2011 (has links) (PDF)
The design of hydropower projects requires a comprehensive planning process in order to achieve the objective to maximise exploitation of the existing hydropower potential as well as future revenues of the plant. For this purpose and to satisfy approval requirements for a complex hydropower development, it is imperative at planning stage, that the conceptual development contemplates a wide range of influencing design factors and ensures appropriate consideration of all related aspects. Since the majority of technical and economical parameters that are required for detailed and final design cannot be precisely determined at early planning stages, crucial design parameters such as design discharge and hydraulic head have to be examined through an extensive optimisation process. One disadvantage inherent to commonly used deterministic analysis is the lack of objectivity for the selection of input parameters. Moreover, it cannot be ensured that the entire existing parameter ranges and all possible parameter combinations are covered. Probabilistic methods utilise discrete probability distributions or parameter input ranges to cover the entire range of uncertainties resulting from an information deficit during the planning phase and integrate them into the optimisation by means of an alternative calculation method. The investigated method assists with the mathematical assessment and integration of uncertainties into the rational economic appraisal of complex infrastructure projects. The assessment includes an exemplary verification to what extent the Random Set Theory can be utilised for the determination of input parameters that are relevant for the optimisation of hydropower projects and evaluates possible improvements with respect to accuracy and suitability of the calculated results. / Die Auslegung von Wasserkraftanlagen stellt einen komplexen Planungsablauf dar, mit dem Ziel das vorhandene Wasserkraftpotential möglichst vollständig zu nutzen und künftige, wirtschaftliche Erträge der Kraftanlage zu maximieren. Um dies zu erreichen und gleichzeitig die Genehmigungsfähigkeit eines komplexen Wasserkraftprojektes zu gewährleisten, besteht hierbei die zwingende Notwendigkeit eine Vielzahl für die Konzepterstellung relevanter Einflussfaktoren zu erfassen und in der Projektplanungsphase hinreichend zu berücksichtigen. In frühen Planungsstadien kann ein Großteil der für die Detailplanung entscheidenden, technischen und wirtschaftlichen Parameter meist nicht exakt bestimmt werden, wodurch maßgebende Designparameter der Wasserkraftanlage, wie Durchfluss und Fallhöhe, einen umfangreichen Optimierungsprozess durchlaufen müssen. Ein Nachteil gebräuchlicher, deterministischer Berechnungsansätze besteht in der zumeist unzureichenden Objektivität bei der Bestimmung der Eingangsparameter, sowie der Tatsache, dass die Erfassung der Parameter in ihrer gesamten Streubreite und sämtlichen, maßgeblichen Parameterkombinationen nicht sichergestellt werden kann. Probabilistische Verfahren verwenden Eingangsparameter in ihrer statistischen Verteilung bzw. in Form von Bandbreiten, mit dem Ziel, Unsicherheiten, die sich aus dem in der Planungsphase unausweichlichen Informationsdefizit ergeben, durch Anwendung einer alternativen Berechnungsmethode mathematisch zu erfassen und in die Berechnung einzubeziehen. Die untersuchte Vorgehensweise trägt dazu bei, aus einem Informationsdefizit resultierende Unschärfen bei der wirtschaftlichen Beurteilung komplexer Infrastrukturprojekte objektiv bzw. mathematisch zu erfassen und in den Planungsprozess einzubeziehen. Es erfolgt eine Beurteilung und beispielhafte Überprüfung, inwiefern die Random Set Methode bei Bestimmung der für den Optimierungsprozess von Wasserkraftanlagen relevanten Eingangsgrößen Anwendung finden kann und in wieweit sich hieraus Verbesserungen hinsichtlich Genauigkeit und Aussagekraft der Berechnungsergebnisse ergeben.
239

Modelling of input data uncertainty based on random set theory for evaluation of the financial feasibility for hydropower projects

Beisler, Matthias Werner 25 May 2011 (has links)
The design of hydropower projects requires a comprehensive planning process in order to achieve the objective to maximise exploitation of the existing hydropower potential as well as future revenues of the plant. For this purpose and to satisfy approval requirements for a complex hydropower development, it is imperative at planning stage, that the conceptual development contemplates a wide range of influencing design factors and ensures appropriate consideration of all related aspects. Since the majority of technical and economical parameters that are required for detailed and final design cannot be precisely determined at early planning stages, crucial design parameters such as design discharge and hydraulic head have to be examined through an extensive optimisation process. One disadvantage inherent to commonly used deterministic analysis is the lack of objectivity for the selection of input parameters. Moreover, it cannot be ensured that the entire existing parameter ranges and all possible parameter combinations are covered. Probabilistic methods utilise discrete probability distributions or parameter input ranges to cover the entire range of uncertainties resulting from an information deficit during the planning phase and integrate them into the optimisation by means of an alternative calculation method. The investigated method assists with the mathematical assessment and integration of uncertainties into the rational economic appraisal of complex infrastructure projects. The assessment includes an exemplary verification to what extent the Random Set Theory can be utilised for the determination of input parameters that are relevant for the optimisation of hydropower projects and evaluates possible improvements with respect to accuracy and suitability of the calculated results. / Die Auslegung von Wasserkraftanlagen stellt einen komplexen Planungsablauf dar, mit dem Ziel das vorhandene Wasserkraftpotential möglichst vollständig zu nutzen und künftige, wirtschaftliche Erträge der Kraftanlage zu maximieren. Um dies zu erreichen und gleichzeitig die Genehmigungsfähigkeit eines komplexen Wasserkraftprojektes zu gewährleisten, besteht hierbei die zwingende Notwendigkeit eine Vielzahl für die Konzepterstellung relevanter Einflussfaktoren zu erfassen und in der Projektplanungsphase hinreichend zu berücksichtigen. In frühen Planungsstadien kann ein Großteil der für die Detailplanung entscheidenden, technischen und wirtschaftlichen Parameter meist nicht exakt bestimmt werden, wodurch maßgebende Designparameter der Wasserkraftanlage, wie Durchfluss und Fallhöhe, einen umfangreichen Optimierungsprozess durchlaufen müssen. Ein Nachteil gebräuchlicher, deterministischer Berechnungsansätze besteht in der zumeist unzureichenden Objektivität bei der Bestimmung der Eingangsparameter, sowie der Tatsache, dass die Erfassung der Parameter in ihrer gesamten Streubreite und sämtlichen, maßgeblichen Parameterkombinationen nicht sichergestellt werden kann. Probabilistische Verfahren verwenden Eingangsparameter in ihrer statistischen Verteilung bzw. in Form von Bandbreiten, mit dem Ziel, Unsicherheiten, die sich aus dem in der Planungsphase unausweichlichen Informationsdefizit ergeben, durch Anwendung einer alternativen Berechnungsmethode mathematisch zu erfassen und in die Berechnung einzubeziehen. Die untersuchte Vorgehensweise trägt dazu bei, aus einem Informationsdefizit resultierende Unschärfen bei der wirtschaftlichen Beurteilung komplexer Infrastrukturprojekte objektiv bzw. mathematisch zu erfassen und in den Planungsprozess einzubeziehen. Es erfolgt eine Beurteilung und beispielhafte Überprüfung, inwiefern die Random Set Methode bei Bestimmung der für den Optimierungsprozess von Wasserkraftanlagen relevanten Eingangsgrößen Anwendung finden kann und in wieweit sich hieraus Verbesserungen hinsichtlich Genauigkeit und Aussagekraft der Berechnungsergebnisse ergeben.

Page generated in 0.0873 seconds