• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Identifikation av produktionsstörningar och obalanser vid tillverkning av golvskenor

Bardh, Nicklas, Abelsson, Rickard January 2006 (has links)
Our report procedure identification of instability and disturbance in an automatic manufacturing line of processing and assembling of chair sliding rails at Sapas manufacturing department in Vetlanda. To obtain a stabile ground we have mapped the material flow to receive a comprehensive view and to visualise connections. We have examined cycle times at different stations in purpose to identificate bottlenecks. The result of our examination showed that the bottleneck of the line was the brush station. This leads to that the expected bottlenecks identificated by Sapa gets a delay time and by that a longer cycle time. Interruptions has a clear negative influence at the line performance so we have also assemble data through the operators report list and compiled these in order to find out the interruptions effect on the line. The outcome during our assembled period was that the reported interruptions corresponded about 30 percent of the total available production time. This has a clear negative effect on the line productivity and efficiency as we have calculated in order to get the present status.
2

Identifikation av produktionsstörningar och obalanser vid tillverkning av golvskenor

Bardh, Nicklas, Abelsson, Rickard January 2006 (has links)
<p>Our report procedure identification of instability and disturbance in an automatic manufacturing line of processing and assembling of chair sliding rails at Sapas manufacturing department in Vetlanda.</p><p>To obtain a stabile ground we have mapped the material flow to receive a comprehensive view and to visualise connections.</p><p>We have examined cycle times at different stations in purpose to identificate bottlenecks. The result of our examination showed that the bottleneck of the line was the brush station. This leads to that the expected bottlenecks identificated by Sapa gets a delay time and by that a longer cycle time.</p><p>Interruptions has a clear negative influence at the line performance so we have also assemble data through the operators report list and compiled these in order to find out the interruptions effect on the line. The outcome during our assembled period was that the reported interruptions corresponded about 30 percent of the total available production time. This has a clear negative effect on the line productivity and efficiency as we have calculated in order to get the present status.</p>

Page generated in 0.1581 seconds