• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Implementación de la metodología BIM en la construcción del proyecto multifamiliar DUPLO para optimizar el costo establecido / Implementation of the BIM methodology in the construction of the DUPLO multifamily project to optimize the established cost

Chirinos Santander, Lizett Rosario, Pecho Llacta, Julio Cesar 01 April 2019 (has links)
El mundo de la construcción viene cambiando, siempre buscando la mejora continua y la optimización de los procesos. Debido a ello surge la necesidad de usar nuevas metodologías aplicadas en otros países donde los procesos de la construcción se vienen industrializando. Dentro de estas metodologías tenemos: • Las Tecnologías de Información y Comunicación, donde resalta la manera correcta de gestionar un proyecto de construcción. • Lean Proyect Delivery System, introducido por Ballard (2000). • Virtual Desing and Construction (VDC). • Bim Execution Plan (BEP). Siendo el BEP el plan de implementación del BIM a un proyecto. Nosotros optamos por usar la metodología BIM en el proyecto Multifamiliar DUPLO ubicado en el distrito de Breña, tiene 28 pisos y cuenta con 05 sótanos. El plazo para la ejecución otorgado según contrato fue de 12 meses. La finalidad de aplicar la metodología BIM es poder controlar el costo del proyecto según el presupuesto adjudicado. Con la aplicación del BIM pretendemos evitar: • Los tiempos muertos por consultas a los proyectistas durante la construcción. • Las ampliaciones de plazo por indefiniciones o RFI´s no resueltos. • El sobrecosto que conlleva una ampliación de plazo (mayores gastos generales, sobre costo por alquiler de equipos, máquinas y herramientas, mano de obra). La aplicación de la metodología BIM al proyecto Duplo servirá para identificar todas las interferencias de las diversas especialidades antes de la ejecución en el terreno. Realizando las reuniones colaborativas y/o ICE SESIONS encabezadas por un Bim Manager se logran identificar y resolver las incompatibilidades, cada participante sabe el papel que desempeña. Al finalizar el proyecto, se evaluará los resultados con la aplicación de la metodología BIM, en nuestro caso el resultado fue favorable. / The world of construction is changing, always looking for continuous improvement and optimization of processes. Due to this, there is a need to use new methodologies applied in other countries where construction processes are being industrialized. Within these methodologies we have: • Information and Communication Technologies, where the correct way to manage a construction project stands out. • Lean Project Delivery System, introduced by Ballard (2000). • Virtual Design and Construction (VDC). • BIM Execution Plan (BEP). The BEP being the BIM implementation plan for a project. We chose to use the BIM methodology in the DUPLO Multifamily project located in the district of Breña, it has 28 floors and has 05 basements. The term for execution granted under the contract was 12 months. The purpose of applying the BIM methodology is to be able to control the cost of the project according to the allocated budget. With the BIM application we intend to avoid: • Downtime due to consultations with the designers during construction. • Term extensions due to undefined or unresolved RFIs. • The cost of extending the term (higher overhead costs, cost of renting equipment, machines and tools, labor). The application of the BIM methodology to the Duplo project will serve to identify all the interferences of the various specialties before the execution in the field. Conducting collaborative meetings and / or ICE SESSIONS led by a BIM Manager can identify and resolve incompatibilities, each participant knows the role it plays. At the end of the project, the results will be evaluated with the application of the BIM methodology, in our case the result was favorable. Keyword: BIM Methodology reduces incompatibilities in a project; This optimizes and controls the cost established in the budget. / Trabajo de investigación
2

BIM: Revit-content : Modellering och hantering / BIM: Revit-content : Modeling and management

Ericson, Robert, Ruuti, Henriikka January 2012 (has links)
I och med införandet av BIM-metodiken inom byggbranschen, har flera frågor fötts kring reformationen av arbetsmetodiken inom projekteringsprocessen. En av dessa är frågan om content; grafik - och informationsinnehållet i en BIM-modell.  Rapportens syfte har varit att, via analys av befintliga contenthanteringstrategier, frambringa rekommendationer för utformande av konsekventa arbetsmetodiker inom Revit-projekt. Mål- sättningen har varit att rekommendationerna skall bidra till förstärkning och vidareutveckling av ett företags hantering av Revit-content.  Arbetet inleddes med en serie intervjuer på arkitektföretaget Tengboms Stockholmskontor. Intervjuerna utfördes med representanter för olika Revit-baserade projekt. Av dessa valdes fyra projekt ut till mer detaljerade fallstudier, där syftet var att kartlägga vilka strategier Tengbom tillämpat i sina Revit-projekt. Parallellt med intervjuerna, utfördes en litteraturstudie där information om befintliga contenthanteringsstrategier inom övriga företag och organisationer, kunde förvärvas och analyseras. Resultatet av fallstudierna på Tengbom jämfördes med de teorier som framkommit via litteraturstudien. För- och nackdelar med olika strategier inom contenthantering analyserades med utgångspunkt i olika aspekter gällande utbildning inom Revit-projektering, samt modellering och hantering av content. Slutsatsen blev att Tengbom haft den i särklass mest hållbara strategin inom den inledande fasen av företagets BIM-implementering. Flera fördelar kunde även identifieras i de övriga contenthanteringsstrategierna som analyserats. Dessa kom att utgöra en gedigen grund för de vidare rekommendationer som arbetet resulterade i. / The introduction of the BIM-methodology in the building industry has awoken several questions regarding the reformation of work methods in the project planning process. One is the question about content; graphics and information inside a Building Information Model. The purpose of this report has been to analyze existing content managing strategies, in order to create recommendations for the forming of consequent work methods in Revit projects. The goal has been to adjust the recommendations for companies willing to further develop internal work methods in the field, particularly concerning the management of Revit content. Several interviews with representatives from different Revit projects at the architectural firm Tengbom in Stockholm were conducted. Four of the Revit projects, were chosen for a more detailed case study, in order to acquire information about the company’s strategies concerning content management. Simultaneously, a literary study was executed, through which information about existing content management strategies in other companies and organizations could be obtained and analyzed. The results of the case studies at Tengbom were compared with theories acquired from the existing strategies in content management. Benefits and disadvantages were analyzed, based on different aspects concerning modeling and management of Revit content and also the education of Revit use. The report concludes that Tengbom has applied the most sustainable strategies in the initial part of the company’s BIM implementation process. Several benefits were also found in the existing strategies, analyzed in the literary study. Together, the conclusions formed a solid base for further recommendations, made as a result of the study in this report.
3

Incumplimiento de plazo y costo por la deficiente elaboración de expedientes técnicos, al no utilizar herramientas de la metodología BIM, en el sector público de la región Arequipa. Caso de estudio: Construcción de las Escuelas Profesionales de Ciencias de la Computación e Ingeniería de Telecomunicaciones, distrito, provincia y región Arequipa / Failure to comply with the deadline and cost due to the deficient preparation of technical files, by not using bim methodology tools, in the public sector of the arequipa region. case study: construction of the professional schools of computer science and telecommunications engineering, district, province and region of arequipa

Apaza Mango, Victor Angel, Silva Escalante, Hernán Juan, Tagle Arizaga, Amaral Francisco 13 September 2021 (has links)
En un informe del Ministerio de Economía y Finanzas MEF del año 2020, se indica que 534 inversiones en la Cartera de Infraestructura Educativa recibieron transferencias para la ejecución de obras. El 87% de estas inversiones presentaron interferencias por deficiencias en el Expediente Técnico, lo cual originó que S/ 447 millones fueran devueltos al Tesoro Público. Ello, evidencia que, el aparato gubernamental realiza una deficiente gestión de las inversiones en los proyectos sociales y de infraestructura. Por lo tanto, es importante enfocar esfuerzos en realizar los estudios previos adecuados para el proyecto. La optimización de los recursos y una mayor eficiencia en la elaboración del Expediente Técnico, disminuirán los cambios inesperados durante la ejecución y redundará en un mayor beneficio para el usuario final. El presente trabajo de investigación desarrollará pautas para la elaboración de un Expediente Técnico más eficiente y consistente, valiéndonos de herramientas de la Metodología BIM, teniendo en cuenta la normatividad legal que promueve su uso. Para lograr una mayor eficiencia en la elaboración del Expediente Técnico, se propone un entorno colaborativo, en el que se programarán reuniones con la participación de todo el equipo del proyecto, se intercambiará información, se resolverán las deficiencias detectadas y finalmente se consolidará la información de los modelos 3D generados por los diversos especialistas, surgiendo el modelo BIM integrado. Con esta información se podrán elaborar todos los documentos que forman parte del Expediente Técnico, conformándose un documento más eficiente y consistente. Dentro del contenido de este trabajo, se incluye un Análisis del Impacto en el Plazo y Costo del proyecto como producto de las deficiencias detectadas en el Expediente Técnico del Caso de Estudio. Y al final, se incluirá una propuesta de mejora en el proceso de elaboración del Expediente Técnico. / In a report from the Ministry of Economy and Finance MEF for the year 2020, it is indicated that 534 Investments in the Educational Infrastructure Portfolio received transfers for the execution of works. 87% of these investments presented interferences due to deficiencies in the Technical File, which caused S/ 447 million to be returned to the Public Treasury. This shows that the government apparatus performs a deficient management of investments in social and infrastructure projects. Therefore, it is important to focus efforts on conducting the appropriate preliminary studies for the project. The optimization of resources and greater efficiency in the preparation of the Technical File will reduce unexpected changes during execution and will result in greater benefit for the end user. This research work will develop guidelines for the elaboration of a more efficient and consistent Technical File, using the tools of the BIM methodology, acording to the current legal regulations. To achieve greater efficiency in the preparation of the Technical File, a collaborative process is proposed, in which meetings will be scheduled with the participation of the entire project team, information will be exchanged, the deficiencies detected will be resolved and finally the information on the 3D models generated by the various specialists, emerging the integrated BIM model. With this information, all the documents that are part of the Technical File can be prepared, forming a more efficient and consistent document. Within the content of this work, an Analysis of the Impact on the Term and Cost of the project is included as a result of the deficiencies detected in the Technical File of the Case Study. And at the end, an Improvement Proposal will be included in the process of preparing the Technical File. / Trabajo de investigación

Page generated in 0.0515 seconds