• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 4
  • 4
  • 1
  • 1
  • 1
  • Tagged with
  • 12
  • 12
  • 12
  • 8
  • 8
  • 8
  • 8
  • 6
  • 6
  • 6
  • 4
  • 4
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

A multijurisdictional approach to predicting benefit-cost ratios for flood retention wetlands in rural Iowa

Brourman, Max E. 01 August 2019 (has links)
Rural Iowa towns often lack flood mitigation because of a lack of resources and inability to compete for federal assistance funds. The Federal Emergency Management Agency relies on a benefit-cost analysis which produces benefit-cost ratios (BCRs) for proposed projects to determine which communities receive funding, with an emphasis on the economic BCR, which compares potential future benefits with estimated capital costs. The FEMA requirement for an economic BCR is at least 0.75. The economic BCRs for mitigation projects in rural towns are often lower compared to those in urban centers due lower potential future benefits from lower building count and potential exposure. Here we use a multijurisdictional approach which analyzes flood mitigation at a watershed scale to join upstream agricultural potential future benefits with downstream potential avoided benefits in rural towns. We predicted BCRs of simulated flood retention wetlands using HAZUS-MH to find the potential future benefits a range of estimated capital costs via a percent reduction approach and a targeted peak flow approach to calculating wetland effects on peak flow. The percent reduction approach generated BCRs of over 0.75 in the Mud Creek watershed for estimated capital costs per wetland up to $177,400. However, the simulated flood retention wetlands did not generate BCRs high enough to meet the minimum requirement in the Hinkle Creek watershed by itself. However, a multijurisdictional approach is not limited to each watershed individually. When the simulated flood retention wetland projects in each watershed were combined, the BCRs were high enough to meet the FEMA requirement. The combined BCRs were over 0.75 for estimated capital costs up to $143,300. The targeted peak flow approach included BCRs which account for dry and wet antecedent soil moisture conditions and minimum, maximum and average peak flow change scenarios. The scenarios with dry antecedent soil moisture conditions created BCRs higher than wet antecedent soil moisture conditions. Further, the maximum peak change scenarios generated BCRs higher than average peak change scenarios, which in turn generated higher BCRs than the minimum peak change scenarios. In the Mud Creek watershed, the only scenario to generate BCRs above 0.75 for any part of the range of estimated capital costs was the maximum peak change scenario under dry antecedent soil moisture conditions. However, the maximum and average peak change scenarios under dry antecedent soil moisture conditions and the maximum peak change scenario under wet soil moisture conditions generated BCRs over 0.75 in the Hinkle Creek watershed. When the simulated flood retention wetland projects for both watersheds were combined, only the maximum peak change scenario under dry antecedent soil moisture conditions generated BCRs above 0.75. We found that a multijurisdictional approach is a viable method for rural watersheds to analyze potential flood mitigation projects to help increase their BCRs.
2

Evaluation of the First Stage of Integrated Treatments Planning on Shihmen Reservoir

Cheng, Chen-Chun 03 July 2012 (has links)
Shihmen Reservoir has contributed to the economic development of northern Taiwan since it was built in 1964. As result of natural disasters and improper development, Shihmen Reservoir had a big problem with sediment deposition. To solve this problem, government executed the first stage of integrated treatments planning on Shihmen Reservoir.The period of program is from 2006 to 2008 and divided into three parts. From the government point of view, this study recognized the use of agriculture water¡Nindustrial water¡Ndomestic water¡Nelectricity generation¡Ntourism and decreased sediment extraction expense as benefit index ¡F recognized budgets and natural disasters as cost index to evaluate the effect of this program.The value of benefit-cost ratio before integrated treatments is 2.817 and the value of benefit-cost ratio after integrated treatments is 3.566. The value of benefit-cost ratio after integrated treatments is bigger than the value of benefit-cost ratio before integrated treatments.It means that it is workable for this program. Considering the reason that the water rate and utility bills are much cheaper in Taiwan, this study adjust the rate of water and utility individually. With the adjustment of water rate, the value of benefit-cost ratio before integrated treatments is 3.519 and the value of benefit-cost ratio after integrated treatments is 4.31. With the adjustment of utility rate, the value of benefit-cost ratio before integrated treatments is 3.689 and the value of benefit-cost ratio after integrated treatments is 4.074. It is also beneficial for this program.
3

Probabilistic Risk Analysis in Transport Project Economic Evaluation

Lieswyn, John January 2012 (has links)
Transport infrastructure investment decision making is typically based on a range of inputs such as social, environmental and economic factors. The benefit cost ratio (BCR), a measure of economic efficiency (“value for money”) determined through cost benefit analysis (CBA), is dependent on accurate estimates of the various option costs and net social benefits such as reductions in travel time, accidents, and vehicle operating costs. However, most evaluations are deterministic procedures using point estimates for the inputs and producing point estimates for the outputs. Transport planners have primarily focused on the cost risks and treat risk through sensitivity testing. Probabilistic risk analysis techniques are available which could provide more information about the statistical confidence of the economic evaluation outputs. This research project report investigated how risk and uncertainty are dealt with in the literature and guidelines. The treatment of uncertainty in the Nelson Arterial Traffic Study (ATS) was reviewed and an opportunity to apply risk analysis to develop probabilities of sea level rise impacting on the coastal road options was identified. A simplified transport model and economic evaluation case study based on the ATS was developed in Excel to enable the application of @RISK Monte Carlo simulation software. The simplifications mean that the results are not comparable with the ATS. Seven input variables and their likely distributions were defined for simulation based on the literature review. The simulation of seven variables, five worksheets, and 10,000 iterations takes about 30 seconds of computation time. The input variables in rank order of influence on the BCR were capital cost, car mode share, unit vehicle operating cost, basic employment forecast growth rate, and unit value of time cost. The deterministically derived BCR of 0.75 is associated with a 50% chance that the BCR will be less than 0.6, although this probability is partly based on some statistical parameters without an empirical basis. In practice, probability distribution fitting to appropriate datasets should be undertaken to better support probabilistic risk analysis conclusions. Probabilities for different confidence levels can be reported to suit the risk tolerance of the decision makers. It was determined that the risk analysis approach is feasible and can produce useful outputs, given a clear understanding of the data inputs and their associated distributions.
4

Comparative cost-benefit analysis of renewable energy resources for rural community development in Nigeria / A.A. Ogunlade

Ogunlade, Abimbola Adegoke January 2008 (has links)
Rural development by means of providing uninterruptible power supply has become a priority among developing countries. Nigeria especially has on its top agenda the mandate to provide clean and cost-effective means of energy to the rural communities, hardest hit by wave of incessant outages of electricity supply. Renewable Energy (RE), a clean form of energy that can be derived from natural sources is widely available throughout Nigeria but is not harnessed. In this dissertation a Cost-Benefit Analysis (CBA) framework is proposed for renewable energy towards rural community development in Nigeria as indicated in the 18-point recommendations of Energy Commission of Nigeria (ECN). Moreover, a cost-benefit analysis tool is formulated and developed from the CBA framework in order to analyze comparatively the costs and intangible benefits of renewable energy projects for rural application. A case study demonstrating the working methodology of the proposed framework is presented in order to establish the cost-benefit components by assessing the comparative cost-benefit analysis of RE at a rural site of Nigeria. Erinjiyan Ekiti rural area is located for CBA assessment with three RE resources (solar, wind and small hydro) selected for consideration. Through the application of Contingent Valuation Method (CVM), the respondents' willingness to pay for RE supply is obtained and RE benefits in monetary terms computed. Using three economic decision criteria namely: Net Present Value (NPV), Benefit-Cost Ratio (BCR) and Internal Rate of Return (IRR); the three RE resources are ranked according to their economic viability. The result of the analysis provides useful insight to investors and decision makers into how RE projects in rural community should be conducted. Foremost, it is revealed that all three RE options will be economically viable if implemented, though adequate caution must be taken when making a decision. Based on the CBA assessment, the Small-Hydro Power (SHP) option is ranked as the most viable option. However, this is swiftly negated if RE social impact, such as the spiritual belief of the rural dwellers, who rely on the only potential river as a medium of communication with their ancestors, are taken into consideration. Furthermore, a sensitivity assessment of the three RE options revealed that only solar photovoltaic (PV) option is marginally viable, thus turns negative upon an assumed increase in discount rate of only 17%. Herein, the proposed CBA framework provides a useful insight into an efficient method of appraising RE projects in rural communities. A CBA simulation tool is formulated and adapted from the CBA framework to enable quicker, reliable and automated means of assessing RE projects with a view to making wise investment decision. / Thesis (M.Ing. (Development and Management Engineering))--North-West University, Potchefstroom Campus, 2009.
5

Comparative cost-benefit analysis of renewable energy resources for rural community development in Nigeria / A.A. Ogunlade

Ogunlade, Abimbola Adegoke January 2008 (has links)
Rural development by means of providing uninterruptible power supply has become a priority among developing countries. Nigeria especially has on its top agenda the mandate to provide clean and cost-effective means of energy to the rural communities, hardest hit by wave of incessant outages of electricity supply. Renewable Energy (RE), a clean form of energy that can be derived from natural sources is widely available throughout Nigeria but is not harnessed. In this dissertation a Cost-Benefit Analysis (CBA) framework is proposed for renewable energy towards rural community development in Nigeria as indicated in the 18-point recommendations of Energy Commission of Nigeria (ECN). Moreover, a cost-benefit analysis tool is formulated and developed from the CBA framework in order to analyze comparatively the costs and intangible benefits of renewable energy projects for rural application. A case study demonstrating the working methodology of the proposed framework is presented in order to establish the cost-benefit components by assessing the comparative cost-benefit analysis of RE at a rural site of Nigeria. Erinjiyan Ekiti rural area is located for CBA assessment with three RE resources (solar, wind and small hydro) selected for consideration. Through the application of Contingent Valuation Method (CVM), the respondents' willingness to pay for RE supply is obtained and RE benefits in monetary terms computed. Using three economic decision criteria namely: Net Present Value (NPV), Benefit-Cost Ratio (BCR) and Internal Rate of Return (IRR); the three RE resources are ranked according to their economic viability. The result of the analysis provides useful insight to investors and decision makers into how RE projects in rural community should be conducted. Foremost, it is revealed that all three RE options will be economically viable if implemented, though adequate caution must be taken when making a decision. Based on the CBA assessment, the Small-Hydro Power (SHP) option is ranked as the most viable option. However, this is swiftly negated if RE social impact, such as the spiritual belief of the rural dwellers, who rely on the only potential river as a medium of communication with their ancestors, are taken into consideration. Furthermore, a sensitivity assessment of the three RE options revealed that only solar photovoltaic (PV) option is marginally viable, thus turns negative upon an assumed increase in discount rate of only 17%. Herein, the proposed CBA framework provides a useful insight into an efficient method of appraising RE projects in rural communities. A CBA simulation tool is formulated and adapted from the CBA framework to enable quicker, reliable and automated means of assessing RE projects with a view to making wise investment decision. / Thesis (M.Ing. (Development and Management Engineering))--North-West University, Potchefstroom Campus, 2009.
6

Econonic analysis of value addition on tea a case study of the Mukumbani/Tshivhase Tea Estate, Vhembe District, Limpopo

Bokosi, James 02 February 2015 (has links)
MSCAEC / Department of Agricultural Economics and Agribusiness
7

電動機車商業模式之經濟效益分析:共享經濟vs.電池租賃 / Economic benefit analysis of business models for the electric scooter: sharing economy vs. battery rental

游晨廷, Yu, Chen Ting Unknown Date (has links)
近年來,電動車與電動機車發展及應用儼然已成為世界潮流,在機車密度極高且擁有「機車王國」稱號的台灣,電動機車技術日新月異,也發展出多樣化商業模式,其中最著名莫過於電動機車電池租賃商業模式,以及共享商業模式。 本研究旨在利用成本效益分析中的淨現值法及益本比法,模擬分析機車使用者以電動機車代替傳統燃油機車,為使用者自己及整體社會帶來之淨現值。在電動機車方面,本研究分析兩種電動機車商業模式,分別為「電動機車電池租賃商業模式」及「共享電動機車商業模式」。 本研究結果顯示,在使用者立場下,目前電動機車成本依舊大於傳統125C.C.燃油機車之成本,且「電動機車電池租賃商業模式」較適合每個月騎乘里程較長之使用者,而「共享電動機車商業模式」較適合每個月騎乘里程較短之使用者。此外,敏感度分析顯示出,在「電動機車電池租賃商業模式」下,騎乘里程長度與NPV及BCR均呈現正相關。在「共享電動機車商業模式」下,每個月騎乘里程為100公里之使用者,在共享電動機車計價方式為每分鐘2.25元之方案下,使用者之NPV>0及BCR>1,並且騎乘里程越短之使用者,其對共享電動機車計價變動的益本比敏感程度越高(當價格下降時,益本比上升較高)。 最後,在整體社會立場下,利用「電動機車電池租賃商業模式」替換傳統燃油機車且騎乘里程越高之使用者,對整體社會帶來之淨現值越高。而利用「共享電動機車商業模式」替換傳統燃油機車且騎乘里程越低之使用者,越具有經濟效益。 / In recent years, the development and application of electric vehicles and electric scooters have become popuplar. In Taiwan, where scooter density is very high and is also called a "scooter kingdom", electric scooter technology is not only improving, but also developing a diversified business model. Particularly, two of the most famous business models are “Electric scooter battery rental business model” and “Sharing electric scooter business model”. The purpose of this study is to use the net present value method and the benefit ratio method in the cost-benefit analysis. We analysis the user's own benefits and the overall social net benefits which are generated from the scooter users replacing traditional fuel scooter with electric scooter. In the field of electric scooters, this study analyzes two business models of electric scooters, “Electric scooter battery rental business model” and “Sharing electric scooter business model”. According to the simulation result of empirical analysis, for the users, the current cost of electric scooters is still higher than the cost of traditional 125C.C. fuel scooters. “Electric scooter battery rental business model” is more suitable for people who have higher accumulated distance per month, and “Sharing electric scooter business model” is more suitable for people who have lower accumulated distance per month . On the other hand, according to the result of sensitivity analysis, the accumulated distance is positively correlated with NPV and BCR in the “Electric scooter battery rental business model”. In the “Sharing electric scooter business model”, those who ride 100 km per month have NPV> 0 and BCR> 1 in the pricing of NT$2.25 per minute. Besides, those who ride 100 km per month have higher sensitivity of pricing. For the overall society, those who use the "Electric scooter battery rental business model" to replace the traditional fuel scooter and have higher accumulated distance per month can generate higher net benefits to the whole society. Those who use the "Sharing electric scooter business model" to replace the traditional fuel scooter and have lower accumulated distance per month can generate higher net benefits to the whole society.
8

Hodnocení ekonomické efektivnosti veřejného stavebního projektu / Economic Efficiency Evaluation of Public Construction Project

Melicharová, Jitka January 2020 (has links)
This thesis deals with the issue of assessing the effectiveness of public investment. The first part of the thesis is theoretical. The life cycle of the building is defined in the introduction. The feasibility studies and methods for evaluating the effectiveness of public projects are subsequently described. The practical part of the thesis is aimed at assessing the effectiveness of the public investment project. The evaluated project is the building of a kindergarten in a small village. The eCBA application was used to evaluate the efficiency. A quantitative analysis of the risks related to the project is carried out at the end of this thesis.
9

Získávání dotací z fondů EU / Obtaining of the Financial Grants from the EU

Dvorská, Věra January 2010 (has links)
Annotation This Master’s thesis deals with obtaining grants from EU funds that are specified for railroad development in the Czech Republic – modernization, reconstruction, interconnection and making the railroad traffic accessible for the whole Europe. In parlance of the Czech Republic the word modernization means speeding up the trains. In my Master’s thesis I would like to describe you the way how to evaluate the efficiency of the project “Reconstruction of Railroad Station in Olomouc” by means of main economic indexes (IRR, BCR, NPV) and further familiarize you with the Benefit 7+ form used for raising money from EU structural funds. I also would like to introduce you the procedure of elaborating required scheme used in economic evaluation – cost and benefits analysis (CBA). This scheme is absolutely necessary in order to get the grants from abovementioned EU structural funds concerning any investment project in the Czech Republic.
10

Water surface profile modelling for Pinjarra flood diversion channel and economic evaluation

Khalil, Kamal January 2007 (has links)
Shire of Murray has concerns regarding the negative impact that a 100 year flood could have on existing structures built before 1997. The increase cost in construction due to landfill has an adverse effect on development in Pinjarra. Feasibility of constructing a diversion channel at upstream of Murray River to attenuate the flood level from 1 in 100 year ARI to 1 in 50 year ARI, was investigated by Kiong (2003). The Murray River Water Surface Profile along three kilometres south of Greenlands Road was modelled. Flood damages on each flood occurrence were assessed and Average Annual Damage (AAD) was calculated. The AAD is used to estimate the monetary benefit against the construction cost of the diversion channel. Groundwater along Greenlands and Fauntleroy Drains was also modelled to determine the viable depth of the designed channel, as well as the analysis of backwater. The proposed channel is designed at different scenarios (invert level at breakout point, culvert or causeway design, and diversion channel variations). The benefit cost ratio of the proposed diversion channel is calculated. Other mitigation options are suggested including detention basins for structural measure, or building a new flood-proof township for non-structural measure.

Page generated in 0.0533 seconds