• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 229
  • 2
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 237
  • 237
  • 198
  • 74
  • 60
  • 40
  • 40
  • 29
  • 26
  • 26
  • 24
  • 23
  • 22
  • 21
  • 21
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Estudo comparativo da degradação de pontes de concreto armado e mistas nos Estados do Ceará e Amazonas

Andrade Filho, Antonio Edvar 29 July 2008 (has links)
Submitted by Kamila Costa (kamilavasconceloscosta@gmail.com) on 2015-07-07T19:16:31Z No. of bitstreams: 1 DISSERTAÇÃO-ANTONIO EDVAR ANDRADE FILHO.pdf: 13483349 bytes, checksum: 6821cbd71eb4aaef5f4a44f1401cdda3 (MD5) / Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2015-07-08T17:55:56Z (GMT) No. of bitstreams: 1 DISSERTAÇÃO-ANTONIO EDVAR ANDRADE FILHO.pdf: 13483349 bytes, checksum: 6821cbd71eb4aaef5f4a44f1401cdda3 (MD5) / Approved for entry into archive by Divisão de Documentação/BC Biblioteca Central (ddbc@ufam.edu.br) on 2015-07-08T17:59:27Z (GMT) No. of bitstreams: 1 DISSERTAÇÃO-ANTONIO EDVAR ANDRADE FILHO.pdf: 13483349 bytes, checksum: 6821cbd71eb4aaef5f4a44f1401cdda3 (MD5) / Made available in DSpace on 2015-07-08T17:59:27Z (GMT). No. of bitstreams: 1 DISSERTAÇÃO-ANTONIO EDVAR ANDRADE FILHO.pdf: 13483349 bytes, checksum: 6821cbd71eb4aaef5f4a44f1401cdda3 (MD5) Previous issue date: 2008-07-29 / Não Informada / In the present work, they are dealt with the main pathological occurrences in bridges in the States of the Ceará and Amazonas, aiming at to subsidize the involved professionals with projects of road bridges and, also, to contribute with the prevention of future pathologies. The necessity of this study elapses of the high number of pathological occurrences in road workmanships in Brazil that has demanded a sufficiently significant cost as for the recovery and/or reinforcement of this type of structure. Seventy four pertaining bridges to highways CE-060, CE-292, CE-359 and CE-386, components of the road mesh of the State of the Ceará, and AM-010, BR-319 and BR-174 had been inspected, components of the road mesh of the State of Amazonas. The methodology adopted in the research passed for the understanding, data-collecting, evaluation and comparison of the pathologies, it’s when inserted manifestations and causes in two half environments. It was contemplated, in the development of the research, the creation of a specific computational system to manage works of art road. They consist, still, considerations techniques for improvement of the quality of future workmanships of the sort, in an attempt to contribute with the security and functionality of the works of art in Brazil, being extended the useful life of this type of structure. / No presente trabalho, são tratadas das principais ocorrências patológicas em obras de arte rodoviárias nos Estados do Ceará e Amazonas, visando subsidiar os profissionais envolvidos com projetos de pontes e, também, contribuir com a prevenção de futuras manifestações patológicas. A necessidade deste estudo decorre do elevado número de ocorrências patológicas em obras rodoviárias no Brasil, que tem demandado um custo bastante significativo no que se refere à recuperação e/ou reforço desse tipo de estrutura. Foram vistoriadas setenta e quatro pontes pertencentes às rodovias CE-060, CE-292, CE-359 e CE-386, componentes da malha viária do Estado do Ceará, e AM-010, BR-319 e BR-174, componentes da malha viária do Estado do Amazonas. A metodologia adotada na pesquisa passou pelo levantamento de dados, compreensão, avaliação e comparação das patologias, suas manifestações e causas quando inseridas em dois meios ambientes. Foi contemplada, no desenvolvimento da pesquisa, a criação de um sistema computacional específico para gerenciar obras de arte rodoviárias. Constam, ainda, considerações técnicas para melhoria da qualidade de futuras obras do gênero, numa tentativa de contribuir com a segurança e funcionalidade das obras de arte no Brasil, ampliando a vida útil desse tipo de estrutura.
12

AplicaÃÃo da anÃlise envoltÃria de dados (dea) na avaliaÃÃo da eficiÃncia de aÃÃes gerenciais para reduÃÃo de desperdÃcio em obras de construÃÃo civil / Application of the envoltÃria analysis of data (dea) in the evaluation of the efficiency of managemental actions for reduction of wastefulness in workmanships of civil construction

Aerson Moreira Barreto 00 December 2010 (has links)
CoordenaÃÃo de AperfeiÃoamento de Pessoal de NÃvel Superior / Um empreendimento de construÃÃo desde a sua concepÃÃo atà a sua finalizaÃÃo possui diversas Ãreas que sÃo responsÃveis por tomada de decisÃo em seu desenvolvimento. As aÃÃes gerenciais oriundas destas decisÃes impactam em geraÃÃo de desperdÃcios em nÃveis de importÃncia diferentes. Este trabalho procura avaliar em quais Ãreas do empreendimento as recomendaÃÃes gerenciais presentes evidenciam maior eficiÃncia na reduÃÃo da geraÃÃo de perdas. Para desenvolver o estudo foi realizada uma revisÃo bibliogrÃfica procurando o embasamento sobre as Ãreas gerenciais e geraÃÃo de desperdÃcio, e a viabilizaÃÃo da utilizaÃÃo das ferramentas de levantamento e anÃlise de dados que apontassem para resultados quantitativos para o estudo. Classifica as Ãreas de tomadas de decisÃes e as aÃÃes dentro de uma perspectiva gerencial que se inicia no projeto conceitual das edificaÃÃes, e percorre sua estratÃgia de produÃÃo, seu projeto arquitetÃnico e detalhamento executivo, o Projeto do Sistema de ProduÃÃo (PSP) finalizando com as aÃÃes dentro do planejamento e controle de obras. Este planejamento de obras à dividido na suas esferas de longo, mÃdio e curto prazo. O estudo da eficiÃncia destas aÃÃes à analisado com a utilizaÃÃo da ferramenta DEA (AnÃlise EnvoltÃria de Dados) a partir dos constructos relativos Ãs Ãreas de tomada de decisÃes, implementadas em obras de empreendimentos imobiliÃrios que sÃo as DMUs (Unidades de Tomadas de DecisÃes). Este estudo tem por objetivo apontar a Ãrea gerencial em que devem se concentrar as aÃÃes que tem maior eficiÃncia na reduÃÃo de desperdÃcio na construÃÃo de empreendimentos imobiliÃrios / Production construction management is characterized by decision making in different areas that open from production strategy to site control, going through conceptual design management, design for production, production system planning, long, medium and short term planning. This research work takes the view that the above managerial areas have different impacts on waste generation on building site. In order to develop this idea a study was conducted on 31 building sites. Managerial actions were investigated using a questionnaire survey based on 16 possible areas of site decision taking, that encompass the range of possible managerial actions covered by literature. A Data Envelopement Analisys (DEA) linear programming was applied to identify that are better connected to site wastage efficiency. It concludes that concentration on production strategy, executive design and production control management are the most frequently areas associated with wastage efficiency, while medium and short range planning and PSP are the last important areas according to results obtain from this group building companies
13

Gestão e gerenciamento de resíduos da construção civil em obras de grande porte: estudos de caso / Civil construction waste management in large construction works: case studies

Martins, Flávia Gadelha 15 June 2012 (has links)
O crescimento da economia brasileira proporcionou uma intensificação na quantidade de obras de infraestrutura iniciadas no país nos últimos anos. A adoção e ampliação de estratégias utilizadas pelo governo para combater os efeitos da crise internacional sobre a economia e as obras necessárias ao país, em razão de eventos internacionais que acontecerão, como a Copa do Mundo de Futebol em 2014, e de programas como o Programa de Aceleração do Crescimento (PAC), foram uma resposta às atuais necessidades do Brasil. Com essas inúmeras obras, houve um crescimento na geração dos resíduos da construção civil (RCC), o que fez com que autoridades, pesquisadores e a sociedade voltassem seus esforços para enfrentar as dificuldades de manejo e disposição final adequada desses resíduos. A ausência de políticas públicas que promovessem a fiscalização do gerenciamento desses resíduos, em relação aos geradores, provocava diversos impactos como, por exemplo, o surgimento de vários depósitos clandestinos nas áreas mais afastadas do perímetro urbano e gastos por parte da administração pública com modelos de gestão corretiva. Contudo, com a elaboração da Resolução CONAMA nº 307/2002 e da Política Nacional de Resíduos Sólidos, Decreto nº 7.404/2010 que regulamenta a Lei nº 12.305, ficou instituído que os geradores devem ser responsáveis pelos resíduos das atividades voltadas à construção civil, contemplando, assim, a minimização dos impactos causados ao meio ambiente e à saúde humana. Dessa forma, esse quadro de descaso com a situação dos resíduos começou a mudar. Com a intenção de contribuir com essa área de conhecimento, esta pesquisa teve como finalidade estudar a situação do sistema de gerenciamento de RCC de obras de grande porte, após a regulamentação da Resolução CONAMA nº 307/2002 e do Decreto nº 7.404/2010, que regulamenta a Lei nº 12.305, referente à Política Nacional de Resíduos Sólidos. Para tanto, foi realizado um estudo da situação da gestão e do gerenciamento dos RCC na demolição e construção da Arena Fonte Nova, em Salvador - BA, e na construção da Arena Pernambuco, em São Lourenço da Mata - PE, realizadas para a Copa do Mundo de Futebol de 2014, por meio de três etapas de estudo: análise das variáveis e indicadores locais; caracterização qualitativa dos resíduos; e, por fim, comparação do gerenciamento da obra com o preconizado em ambas as leis. Esta pesquisa utilizou metodologia de classificação qualitativa do RCC, por meio de observações e entrevistas de campo, com o objetivo de identificar e analisar sua gestão e seu gerenciamento nessas obras, e teve como principal importância ajudar as empresas construtoras de obras de grande porte a fazerem uma autoavaliação de sua gestão e gerenciamento dos resíduos sólidos. Portanto, concluiu-se que as obras pesquisadas atendem às exigências das leis e que, para que haja um efetivo sistema de gestão e gerenciamento dos resíduos da construção civil, deve-se influenciar a mudança cultural das pessoas, visando a efetiva compreensão e concordância das necessidades ambientais. / The Brazilian economy has provided an enhancement in the amount of infrastructure works initiated in the country in recent years. The adoption and expansion of strategies used by the government to combat the effects of global crisis on the economy and the works necessary for the country due to international events that will happen as the FIFA World Cup in 2014 and programs such as PAC (Program Growth Acceleration), were a response to the current needs of Brazil. With these numerous works, there was an increase in the generation of civil construction waste (CCW), which meant that the authorities, researchers and society return their efforts to face the difficulties of handling and final disposal of such waste. The absence of public policies that promote the monitoring of waste management in relation to generators, caused many impacts, for example, the emergence of several underground deposits in the areas furthest from the urban perimeter and spending by the public administration models corrective management. However, the drafting of the CONAMA Resolution 307/2002 and the National Policy on Solid Waste Decree 7.404/2010 which regulates Law 12,305, it was established that the generators should be responsible for waste from activities related to construction, encompassing thus minimizing the impacts to the environment and human health. Thus, this picture of neglect with the waste situation began to change. Intending to contribute to this area of knowledge, the present study was aimed to study the situation of the CCW management system for large works, after the implementation of Resolution CONAMA 307/2002 and Decree regulating 7.404/2010 Law 12,305, on the National Policy on Solid Waste. To that end, a study of the CCW management situation was conducted in the demolition and construction of the Arena Fonte Nova in Salvador - Bahia, and in the construction of the Arena Pernambuco in São Lourenço da Mata - PE, performed for the FIFA World Cup 2014, through three stages of study: analysis of variables and local indicators, qualitative characterization of the waste and, finally, comparing the CCW management as recommended in both laws. This research used the qualitative methodology of the CCW, through field observations and interviews, in order to identify and analyze the management of these same works and its main importance to help manufacturers of major works to make a self- evaluation of its management and solid waste management. Therefore,it was concluded that the works researched met the requirements of laws and that to have an effective management system of civil construction waste, must influence cultural change in the people, in order to enhance comprehension and compliance of environmental needs.
14

Gestão e gerenciamento de resíduos da construção civil em obras de grande porte: estudos de caso / Civil construction waste management in large construction works: case studies

Flávia Gadelha Martins 15 June 2012 (has links)
O crescimento da economia brasileira proporcionou uma intensificação na quantidade de obras de infraestrutura iniciadas no país nos últimos anos. A adoção e ampliação de estratégias utilizadas pelo governo para combater os efeitos da crise internacional sobre a economia e as obras necessárias ao país, em razão de eventos internacionais que acontecerão, como a Copa do Mundo de Futebol em 2014, e de programas como o Programa de Aceleração do Crescimento (PAC), foram uma resposta às atuais necessidades do Brasil. Com essas inúmeras obras, houve um crescimento na geração dos resíduos da construção civil (RCC), o que fez com que autoridades, pesquisadores e a sociedade voltassem seus esforços para enfrentar as dificuldades de manejo e disposição final adequada desses resíduos. A ausência de políticas públicas que promovessem a fiscalização do gerenciamento desses resíduos, em relação aos geradores, provocava diversos impactos como, por exemplo, o surgimento de vários depósitos clandestinos nas áreas mais afastadas do perímetro urbano e gastos por parte da administração pública com modelos de gestão corretiva. Contudo, com a elaboração da Resolução CONAMA nº 307/2002 e da Política Nacional de Resíduos Sólidos, Decreto nº 7.404/2010 que regulamenta a Lei nº 12.305, ficou instituído que os geradores devem ser responsáveis pelos resíduos das atividades voltadas à construção civil, contemplando, assim, a minimização dos impactos causados ao meio ambiente e à saúde humana. Dessa forma, esse quadro de descaso com a situação dos resíduos começou a mudar. Com a intenção de contribuir com essa área de conhecimento, esta pesquisa teve como finalidade estudar a situação do sistema de gerenciamento de RCC de obras de grande porte, após a regulamentação da Resolução CONAMA nº 307/2002 e do Decreto nº 7.404/2010, que regulamenta a Lei nº 12.305, referente à Política Nacional de Resíduos Sólidos. Para tanto, foi realizado um estudo da situação da gestão e do gerenciamento dos RCC na demolição e construção da Arena Fonte Nova, em Salvador - BA, e na construção da Arena Pernambuco, em São Lourenço da Mata - PE, realizadas para a Copa do Mundo de Futebol de 2014, por meio de três etapas de estudo: análise das variáveis e indicadores locais; caracterização qualitativa dos resíduos; e, por fim, comparação do gerenciamento da obra com o preconizado em ambas as leis. Esta pesquisa utilizou metodologia de classificação qualitativa do RCC, por meio de observações e entrevistas de campo, com o objetivo de identificar e analisar sua gestão e seu gerenciamento nessas obras, e teve como principal importância ajudar as empresas construtoras de obras de grande porte a fazerem uma autoavaliação de sua gestão e gerenciamento dos resíduos sólidos. Portanto, concluiu-se que as obras pesquisadas atendem às exigências das leis e que, para que haja um efetivo sistema de gestão e gerenciamento dos resíduos da construção civil, deve-se influenciar a mudança cultural das pessoas, visando a efetiva compreensão e concordância das necessidades ambientais. / The Brazilian economy has provided an enhancement in the amount of infrastructure works initiated in the country in recent years. The adoption and expansion of strategies used by the government to combat the effects of global crisis on the economy and the works necessary for the country due to international events that will happen as the FIFA World Cup in 2014 and programs such as PAC (Program Growth Acceleration), were a response to the current needs of Brazil. With these numerous works, there was an increase in the generation of civil construction waste (CCW), which meant that the authorities, researchers and society return their efforts to face the difficulties of handling and final disposal of such waste. The absence of public policies that promote the monitoring of waste management in relation to generators, caused many impacts, for example, the emergence of several underground deposits in the areas furthest from the urban perimeter and spending by the public administration models corrective management. However, the drafting of the CONAMA Resolution 307/2002 and the National Policy on Solid Waste Decree 7.404/2010 which regulates Law 12,305, it was established that the generators should be responsible for waste from activities related to construction, encompassing thus minimizing the impacts to the environment and human health. Thus, this picture of neglect with the waste situation began to change. Intending to contribute to this area of knowledge, the present study was aimed to study the situation of the CCW management system for large works, after the implementation of Resolution CONAMA 307/2002 and Decree regulating 7.404/2010 Law 12,305, on the National Policy on Solid Waste. To that end, a study of the CCW management situation was conducted in the demolition and construction of the Arena Fonte Nova in Salvador - Bahia, and in the construction of the Arena Pernambuco in São Lourenço da Mata - PE, performed for the FIFA World Cup 2014, through three stages of study: analysis of variables and local indicators, qualitative characterization of the waste and, finally, comparing the CCW management as recommended in both laws. This research used the qualitative methodology of the CCW, through field observations and interviews, in order to identify and analyze the management of these same works and its main importance to help manufacturers of major works to make a self- evaluation of its management and solid waste management. Therefore,it was concluded that the works researched met the requirements of laws and that to have an effective management system of civil construction waste, must influence cultural change in the people, in order to enhance comprehension and compliance of environmental needs.
15

Modelo de integração entre o projeto executivo e o planejamento operacional em empreendimentos de edificações comerciais. / Integration model between the design and the operational planning in enterprises of commercial constructions.

Ferreira, Fernanda Maria Pinto Freitas Ramos 10 July 2008 (has links)
Esta pesquisa apresenta um modelo de integração entre o projeto executivo e o planejamento operacional de empreendimentos comerciais, aplicado em 8 empresas (2 construtoras, 1 incorporadora, 3 consultorias de gerenciamentos de projetos, 1 empreiteiro e 1 empresa de projetos). A contribuição do modelo beneficia o processo de integração em 6 processos do planejamento de um projeto, a saber: (a) na criação da EAP (estrutura analítica do projeto); (b) na definição de atividade; (c) no seqüenciamento de atividades; (d) na estimativa de recursos da atividade; (e) na estimativa de duração da atividade e (f) no desenvolvimento do cronograma. Entre as principais conclusões, percebemos que a aplicação do modelo é possível pelo aumento da rapidez na preparação do cronograma do projeto e na simulação de tomada de decisões operacionais, mas desde que às empresas do setor consolidem as práticas de coordenar, projetar e gerenciar de forma simultânea e consistente; criando seu próprio banco de dados de tecnologias construtivas, integrado aos sistemas informatizados de projetos e de gerenciamento. / This research presents an integration model between the design and the operational planning of commercial enterprises, applied in 8 companies (2 builders, 1 company of incorporation, 3 consultancies of project management, 1 contractor and 1 company of projects). The contribution of the model benefits the integration in 6 processes of the planning of an enterprise, to know: (a) create WBS (work breakdown structure); (b) activity definition; (c) activity sequencing; (d) activity resource estimating; (e) activity duration estimating and (f) schedule development. Among the main conclusions, we noticed that the application of the model is possible for the increase of the speed in the preparation of the shedule of the enterprise and in the simulation of operational decisions, but since to the companies of the section consolidate the practices of coordinating, to design and to manage in a simultaneous and solid way; creating the own database of constructive technologies, integrated into the computerized systems of design and of management.
16

Valorização da participação da engenharia de produção no projeto simultâneo de empresa construtora-incorporadora. / Valuation of participation of production engineering in concurrent design construction-real estate developer company.

Grazina, Carlos Eduardo 12 February 2016 (has links)
A falta de integração entre áreas de conhecimento pode gerar efeitos negativos no processo de projeto em uma construtora-incorporadora. Em muitos casos, o projeto do produto é elaborado pela incorporadora sem qualquer participação da área responsável pela produção e de outras áreas da construtora. O trabalho apresenta uma análise sobre a gestão de projetos na construção de edifícios, valorizando a participação da engenharia de produção nessa fase, apoiando-se nos conceitos de Projeto Simultâneo, e propõe diretrizes para sua aplicação na construtora-incorporadora Cyrela, com enfoque na construtibilidade e manutenibilidade. Para desenvolver a pesquisa foi realizada uma revisão bibliográfica sobre as características da gestão de projetos, da Engenharia de Produção na construção de edifícios, e sobre a Engenharia Simultânea no desenvolvimento de produtos com comparativo de modelos de indústrias seriadas para a construção civil, incluindo a interação entre os agentes do processo. Como resultados são apresentados: uma análise da interação entre os agentes do processo; a ligação entre pessoas, processos e tecnologia; os conceitos de construtibilidade, manutenibilidade e retroalimentação na interface com projetos. São igualmente feitas análises das tendências de modernização na gestão dos projetos por meio da modelagem da informação da construção e, apoiado em estudo de caso, são apresentadas as experiências do Projeto Simultâneo aplicadas na Cyrela. Por fim, são apresentadas as diretrizes para participação da Engenharia de Produção da Construtora e Incorporadora Cyrela no Projeto Simultâneo, sendo essa a principal contribuição do trabalho. Embora suas contribuições possam servir de referência para demais empresas do setor, essa pesquisa foi desenvolvida para aplicações práticas da Cyrela, construtora-incorporadora que atua na construção de edifícios em todas as regiões do Brasil. / The lack of integration between knowledge areas can generate negative effects in the design process in a construction-real estate developer. In many cases, the product design is prepared by the real estate developer without any involvement of the area responsible for production and other areas of construction. This thesis presents an analysis of the project management in building construction, valuing the participation of engineering production in this stage, basing on the concepts of Concurrent Design and proposes guidelines for its application at Cyrela constructionreal estate developer company, focusing on constructability and maintainability. To develop the research was performed a literature review about the characteristics of Project Management, Production Engineering in building construction, and the Concurrent Engineering in the development of products with comparative serial industries models for the construction industry, including interaction between agents of the process. As results are presented: an analysis of the interaction between the agents of the process; a link between people, processes and technology; the concepts of constructability, maintainability and feedback on interface with projects. Modernization trends in project management are analyzed also through building information modeling and, through case study, are presented the Concurrent Design experiences applied at Cyrela. Finally are presented the guidelines to the participation of the Production Engineering of Cyrela construction-real estate developer on Concurrent Design, being the main contribution of this thesis. Although the contributions may serve as a reference for other companies in the sector, this research was developed for practical applications at Cyrela, constructionreal estate developer that acts in the construction of buildings in all regions of Brazil.
17

Análise dos diferentes modelos de estruturação de procurement em empresas de real estate / Analysis of different stucturation models of procurement in real estate companies.

Neves, Mauricio Bertoldi Sanchez 06 May 2016 (has links)
Percebe-se no mercado brasileiro que a área de suprimentos - Procurement - nas empresas do segmento de real estate de construção civil se apresenta, tanto em termos de estrutura quanto em procedimentos, de diferentes formas. É possível observar estruturas centralizadas responsáveis por toda a gestão na companhia, enquanto há outras em que as obras são autônomas com suporte corporativo. Para cada estrutura, as formas de atuação das áreas diferem, objetivando satisfazer as premissas gerenciais de cada companhia. A análise do espectro existente resulta em razoável incerteza para se afirmar quais práticas são mais eficazes em termos de desempenho e geração de resultado. Enquanto estruturas mais centralizadas conduzem para menos autonomia para as obras com sistemas corporativos mais robustos, estruturas autônomas possibilitam maior agilidade e rapidez nas tomadas de decisão. Neste cenário, o objetivo desta dissertação é analisar as diferentes composições estruturais das áreas de suprimentos existentes nos subsetores de construção civil: infraestrutura e edificações a fim de propor um modelo adequado de estruturação e atuação, visando proporcionar uma melhor forma de atuação das áreas de suprimentos no setor de construção brasileiro. Para tanto, foi realizado uma revisão bibliográfica a respeito dos temas: estruturas e procedimentos de suprimentos em real estate e riscos e oportunidades das vertentes estruturais. Em seguida foi realizada uma enquete com algumas das principais empresas de ambos subsetores objeto deste estudo. Tal pesquisa permitiu identificar os principais aspectos de cada vertente estrutural de procurement em construção civil e assim identificar as caraterísticas necessárias para a proposição do modelo. Dessa forma, foi proposto o modelo de atuação adequado para as empresas desse setor, onde se espera contribuir para que a gestão de suprimentos nessas empresas de construção brasileiras seja tratada de forma estratégica, adicionando valor e competitividade às organizações a qual fazem parte. / It is perceived in Brazilian market that procurement in real estate companies is presented differently both in terms of structure and procedures. It is possible to observe centralized structures responsible for all management in the company, while there are structures in which the works are basically autonomous with corporate support. For each structure, the procedures of the areas differ, aiming to meet the managerial assumptions of each company. The analysis of existing spectrum results in reasonable uncertainty to assert what practices are most effective in terms of performance and result generation. While more centralized structures lead to less autonomy for works with more robust enterprise systems, autonomous structures enable greater agility and quickness in decision-making. In this scenario, the goal of this dissertation is to analyze the different structural compositions of existing supplies areas in the subsectors of civil construction: infrastructure and building in order to propose a suitable model of organization and operation. Still, this works aims to provide a better way of operation of the supply areas in the Brazilian construction sector. Therefore, a literature review was conducted on the themes: infrastructure and supply procedures in real estate and risks & opportunities of the structural aspects. Then a survey had been done in some of leading companies in both subsectors object of this study. This research allowed recognizing the main aspects of each structural procurement component in construction and consequently identifying the characteristics necessary for the model proposition. Finally, it was proposed the appropriate operational model for companies in this sector, which expects to contribute to supply management be treated in a strategic manner from now on in Brazilian construction companies and adding value and competitiveness to organizations to which they belong.
18

Produtividade de mão-de-obra no serviço de alvenaria. / Masonry labor productivity.

Carraro, Fausto 11 December 1998 (has links)
O trabalho analisa a produtividade da mão-de-obra no serviço de alvenaria, através da identificação e entendimento dos fatores que a fazem variar. Coletou-se dados em nove obras, utilizando-se de uma metodologia padronizada, que possui as seguintes características: é confiável, de fácil aplicação e de baixo custo de operação. Esta metodologia mostrou-se eficiente como um instrumento para a gestão do uso da mão-de-obra no serviço de alvenaria, ainda durante a sua execução. / This work evaluates masonry labor productivity by identifying and understanding the factors which make it vary. Data has been colected on nine construction sites using a methodology that has three main characteristics: reliability, easy to apllyand low operational costs. Such methodology proved to be helpful as a tool for masonry labor management when this task is still on execution.
19

Diretrizes para elaboração de planos da qualidade em empreendimentos da construção civil. / Guidelines for the development of quality plans in building-product of civil construction.

Santos, Luiz Augusto dos 10 September 2003 (has links)
Os diferentes programas e sistemas de gestão de qualidade, como o QUALIHAB, o PBQP-H e a ISO série 9000, vêm sendo disseminados no mercado da construção civil como meio das empresas obterem qualidade nos empreendimentos. Contudo, a implantação dos programas e sistemas de gestão não conseguiu dar garantias à qualidade dos empreendimentos, principalmente quando há superposição dos sistemas de gestão dos participantes envolvidos. Como forma de transpor estes obstáculos, buscou-se caracterizar e analisar, criticamente, a implementação de sistemas de gestão de qualidade com o intuito de obter subsídios à elaboração de planos de qualidade aplicáveis ao modo específico da construção civil. O desenvolvimento do trabalho foi feito a partir da revisão bibliográfica e estudos de caso realizados em empreendimentos de construção civil, privados e públicos, envolvendo empresas construtoras, empresas gerenciadoras, uma empresa de consultoria e profissionais autônomos na área de qualidade. O trabalho propõe diretrizes para a elaboração de planos de qualidade em empreendimentos da construção civil, principalmente no que se refere à evolução dos sistemas de gestão da qualidade, que passariam a ser aplicados ao empreendimento e não à estrutura interna das organizações. / The programs and systems of quality management, such as the QUALIHAB, PBQPH, and ISO 9000 series, have been spread through the Brazilian civil construction market so that building companies can achieve building-projects quality. However, the implementation of management systems has not guaranteed quality in construction projects mainly when there is a superposition of stakeholders management systems. This research critically characterizes and analyses the implementation of quality management systems in order to subsidize the development of quality plans applied to construction projects. In the development of this work, a bibliographical review was conducted and case studies were carried out on private and public construction projects involving construction companies, management companies, a consultancy enterprise and quality management professionals. This work proposes guidelines to develop quality plans in construction projects, mainly concerning the evolution of quality management systems that would be applied to projects and not to companies.
20

Formação e gerência de redes de empresas: avaliação da aplicabilidade da estrutura do produto em obras de construção civil / not available

Nascimento, Gustavo Brandão Soares do 08 June 2005 (has links)
A construção civil, especialmente nos últimos anos, tem se assemelhado à configuração organizacional denominada rede de empresas, devido a mudanças estruturais em sua forma de produção e relacionamento firma-empregado. A adoção de novas técnicas e ferramentas para o aumento da competitividade é necessária, para o desenvolvimento das empresas do setor. A estrutura do produto, ferramenta intensamente utilizada na indústria de manufatura, se apresenta como um instrumento no auxílio à competitividade das empresas de construção civil, especialmente nas áreas relativas a suprimento e a fluxo de materiais. / The civil construction sector, specially in last years, has been similar to the organizational configuration called network enterprise, because the structural changes in the production form and employee relationship. The use of new techniques and tools to improve the competitiveness is necessary to develop the sector companies. The product structure, used oftenly in manufacturing industry, is a tool that helps the competitiveness of the firms in construction sector, specially in supply and materials flow management.

Page generated in 0.078 seconds