Spelling suggestions: "subject:"5construction managemement at risk"" "subject:"5construction managemement at disk""
1 |
Analysis of 2009 ENR Best Projects in Texas to Determine the Impact of Project Delivery System UsedRajan, Navaneethan 2010 December 1900 (has links)
Competitive Bidding, Competitive Sealed Proposal, construction management agency, construction management at risk, Design-Build, Design-Build-Bridging, and job order contracting are seven project delivery methods that are commonly used in the state of Texas today. This paper empirically compares the cost, schedule, and change order management performance of these project delivery methods in 2009 Engineering News Record (ENR) Best Construction Projects in Texas, using the data collected from the projects representative of the population. Also information is collected on lessons learned from these projects. The thesis included development of survey instrument, getting approval from Institutional Review Board (IRB), data collection from the industry, statistical analysis and inferences. Based on the data collected, project performances were measured in terms of five identified variables and then plotted in the form of probability distribution curves to understand the characteristics of the target population. Then, the results were grouped into six categories based on project delivery methods used and compared to understand their impacts on these projects. Findings revealed predominant usage of CM at Risk PDM, and better cost and schedule performance of CM at Risk, Design-Build, and Owner customized PDM. Detailed performance metrics, results, interpretations and conclusions are presented.
|
2 |
Design-Build and CM at Risk- comparative analysis for owner decision making based on case studies and project surveysPark, Soon Rock 2011 May 1900 (has links)
Currently, many researchers and stakeholders believe that effective delivery systems for construction projects are key to improving project quality and value in the construction industry. Therefore, it is important that owners use the best project delivery system because there are significant consequence due to differences in contracting processes and roles and responsibilities among contracting parties.
For the reason, this research aims to compare the efficiency of DB with that of CMAR, as two methods used to select or deny expectations, specifically through quantitative and qualitative analysis. In order to do that, the researcher identified performance data and benefits, drawbacks, and success factors of DB and CMAR through survey and case projects and also analyzed performance data collected from two case projects.
Consequently, owners will be able to understand characteristics, differences, and success factors of two different PDSs based on the comparative study. Furthermore, this research could be used to develop a decision support system for owners to select an appropriate PDS.
|
3 |
Project Delivery Method Performance Evaluation for Water and Wastewater Capital ProjectsJanuary 2018 (has links)
abstract: The water and wastewater industry in the United States is in dire need of renovation due to dwindling infrastructure and requires substantial reinvestment. Design-bid-build (DBB) is the traditional method of project delivery most widely applied in this industry. However, alternative project delivery methods (APDM) are on the rise and touting the benefits of reduced project schedule and cost. The main purpose of this study is to conduct a qualitative and quantitative performance evaluation to assess the current impact of APDM in the water and wastewater industry. A national survey was conducted targeting completed water and wastewater treatment plant projects. Responses were obtained from 75 utilities and constructors that either completed their projects using DBB, construction manager at risk (CMAR), or design-build (DB). Data analysis revealed that CMAR and DB statistically outperformed DBB in terms of project speed and intensity. Performance metrics such as cost growth, schedule growth, unit cost, factors influencing project delivery method selection, scope changes, warranty and latent defects, and several others are also evaluated. The main contribution of this study was that it was able to show that for the same project cost, water and wastewater treatment plants could be delivered under a faster schedule and with higher quality through the utilization of APDM. / Dissertation/Thesis / Masters Thesis Construction Management 2018
|
4 |
Innovative Delivery of Water Infrastructure ProjectsJanuary 2020 (has links)
abstract: Water utilities across the United States are facing numerous challenges, such as limited funding and increasing project complexity, in constructing and upgrading their aging infrastructure. One innovative method to overcome these challenges is through the use of alternative project delivery methods (APDM), such as construction management at-risk (CMAR) and design-build (DB). Previous research has shown that APDM have the potential to deliver higher performing water infrastructure projects when compared to the traditional design-bid-build (DBB) method. However, there is a need to further examine APDM practices and develop tools that may support utilities in the delivery of their APDM water infrastructure projects. This study fills the knowledge gap by conducting several studies that may support public and private utilities in improving the delivery of their APDM water infrastructure projects. First, APDM implementation practices for water infrastructure projects are identified by assessing the state of practice, particularly during project procurement and execution. Second, DB project administration best practices are determined to support utilities seeking to add DB to their organization’s project delivery toolbox. Third, a pioneering web-based project delivery method decision-support tool was developed to aid utilities in selecting the appropriate delivery method for their water project. Finally, project-specific factors and attributes that impact project delivery performance are investigated through exploratory modeling and analysis. The study collected data on 75 completed treatment plant projects, conducted interviews with ten utilities that successfully deliver their water projects using DB, and worked closely with several industry experts through industry workshops and panels. Key findings related to water infrastructure project delivery revealed in this study included: (1) guaranteed maximum price (GMP) is the preferred compensation type for APDM projects; (2) utilities statistically having the lowest comfort level with delivering CMAR projects; (3) qualifications-based procurement is an effective DB project delivery practice; (4) the identification of 13 key project delivery method selection factors; and (5) the three highest predictors that impact unit cost performance are project complexity, project team chemistry and communication, and project size. / Dissertation/Thesis / Doctoral Dissertation Civil, Environmental and Sustainable Engineering 2020
|
Page generated in 0.1286 seconds