• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 12
  • 7
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 33
  • 33
  • 8
  • 6
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Byggarbetsmiljösamordnares syn på utbildning, erfarenhet och kompetens för upprättande av arbetsmiljöplan och skydd vid etablering av anläggning på eller vid väg.

Wagner, Camilla January 2017 (has links)
Bakgrund: Arbetsmiljöföreskrifter ställer krav på erforderlig utbildning, erfarenhet och kompetens för byggarbetsmiljösamordnare vidför planering, projektering och utförande för att kunna verka i dessa roller. Det finns dock brister i kunskap om hur utbildning, erfarenhet och kompetens kan påverka skyddet vid anläggningsverksamhet som föregås vid eller på väg. Syfte: Det första syftet är att få en uppfattning om hur de som arbetar som byggarbetsmiljösamordnare vidför planering och projektering resonerar kring upprättande av arbetsmiljöplan som riskhanteringsverktyg. Det andra syftet är att undersöka hur byggarbetsmiljösamordnare vidför utförande hanterar och tolkar arbetsmiljöplanen ur riskhänseende. Det tredje syftet är att ta reda på vilken utbildningsomfattning och inriktning på utbildning byggarbetsmiljösamordnare anser att det finns behov avför, samt vilket intervall som behövs för kontinuerlig fortbildning. Det fjärde syftet är att utvärdera huruvida byggarbetsmiljösamordnare anser att mentorskap bör rekommenderas som en del i lärandet.   Metod/Genomförande: Magisteruppsatsen har genomförts som en semistrukturerad kvalitativ intervju med de personer som verkar som byggarbetsmiljösamordnare för planering, projektering och utförande samt trafikanordningsansvarig. Observationer har gjorts vid anläggningsarbete på företag benämnt nr 1, samt litteraturstudier.   Resultat: Studien visar att det finns behov av olika inriktningar vid utbildningsgenomförande, samt att det finns behov av repetitionsutbildning. Utbildningarna bör innehålla både teoretiska och praktiska moment, alternativt lärande genom mentorskap. Praktisk anknytning har Det framkom också att praktisk anknytning har framkommit har stor betydelse för genomförande av god riskhantering, för byggarbetsmiljösamordnare för planering, projektering och utförande.   Slutsats: Studien visar att det finns behov av att utveckla själva upplägget och inriktningen av utbildningar för byggarbetsmiljösamordnare. Idag erbjuds enbart teoretiskt inriktade utbildningar. Det vore betydelsefullt att kunna tillhandahålla mentorskap som del av utbildningen.  Respondenterna Repetitionsutbildningar anser att repetitionsutbildningarrespondenterna är viktiga som ett led i att upprätthålla och vidareutveckla riskhantering och säkerhet.   Nyckelord: Byggarbetsmiljösamordning, anläggningsarbete, vägarbetare, arbetsmiljöplan, riskhantering, BAS P, BAS U. / Abstract Background: Building work environment co-ordinators Safety Coordinators are responsible for planning, designing projecting and executionperformance at the construction site. This report aims to look into their view on education, experience and competence required to work in these roles. Aim: The first aim is to understand how the building workenvironment co-ordinatorsSafety Coordinators for planning and designing projecting think about resonate around the creation of a work environment plan used as a risk management. tool. The second aim is to examine how building workenvironment co-ordinators Safety Coordinators for execution performing, is handling and interpret the work environment plan as risk management tool. The third aim is to find out in what extent they consider it necessary, as well as what level of education they need. The fourth aim is to evaluate if there is a need for mentoring as a part of education. Method: This one year master hasthesis has been conducted as a qualitative study with individual interviews with four building  work environment co-ordinators construction workers, and one traffic planning co-ordinator. constructor. It has also included observations at different construction works at company 1. A data literature analysis was also conducted. Results: The study shows that there is a need for different directions in the implementation of training, and that there is a need to repeat the training sessions. The sessions should be a combination of theoretical and practical moments, alternative learning through mentoring. Practical connection has been found to be of great importance for the implementation of good risk management, for building work environment co-ordinators construction environmental coordinators for planning, designing and execution. Conclusion: The study shows that there is a need to develop structure and focus of education for the building work environment co-ordinators construction environment coordinator and traffic planning co-ordinator. Today, only theoretically oriented trainings are offered. It would be of great importance to provide mentoring as part of the education. Repeated training is considered to be important as part of maintaining and further developing risk management and security. Key Words: Construction work coordination, Construction work, roadwork, road worker, workenvironment plan, riskmanagement, BAS P, BAS U.
12

L'amphithéatre d'Arles

Zugmeyer, Stéphanie 16 December 2011 (has links)
Cette thèse constitue une étude de l'architecture de l'amphithéâtre antique d'Arles et de ses transformations ultérieures. La première partie traite de l'état actuel du monument et de son évolution aux époques médiévale et moderne, ainsi que des différentes campagnes de restauration des XIXe et XXe siècles. Elle comporte ensuite une description architecturale détaillée du bâtiment et plusieurs hypothèses de restitution des parties disparues. Les étapes de construction et des modes de mise en œuvre du bâtiment sont traités dans une dernière partie. / This study is an analisis of the architecture of the roman amphitheatre of Arles (France) and of its evolution in the medieval and modern times.A detailled description of the architecture and various hypothesis of restitution of the missing part of the buiding, is followed by the study of the construction work and especially the tools used.
13

Last Planner System – Areas of Application and Implementation Challenges

Porwal, Vishal 2010 December 1900 (has links)
In recent years projects have increasingly used Last Planner System (LPS) in building construction. However project managers still struggle with figuring out how the LPS could be applied on their specific projects. One main reason for this struggle is that explicit instructions for systematically applying LPS are not available. This thesis offers practitioners and researchers an account of LPS implementation challenges and an indication of how LPS can be applied. The thesis qualitatively aggregates the results of 26 test case projects of LPS applications to show researchers and practitioners reasons why LPS was applied, what benefits were realized and what challenges were found during the implementation. Senior and mid-level managers in AEC industry were surveyed to assess the implementation challenges that they encountered. The main findings of this analysis are; (1) that practitioners have used LPS for the purpose of making plans more reliable, (2) get smooth work flow (3) improve productivity. The survey findings imply that improvements in LPS implementation strategies can be made which will facilitate LPS adoption by the industry. The findings of this thesis suggest that further research on the integration of LPS into work and business processes of project teams is needed to further the widespread use of LPS throughout the building industry.
14

Rechtsschutz bei der Vergabe von Bauleistungen unterhalb der Schwellenwerte, unter besonderer Berücksichtigung der Praxis in Sachsen

Pfau, Tilo 08 August 2011 (has links) (PDF)
Die Dissertation befasst sich mit dem vergaberechtlichen Primärrechtsschutz unterhalb der EU-Schwellenwerte, welcher in der Praxis als nicht vorhanden bzw. als unterentwickelt bezeichnet werden muss. Dabei werden insbesondere die vom Freistaat Sachsen entwickelten Regelungen des § 9 SächsVergabeDVO untersucht, die in der Literatur vereinzelt als „Rechtsschutz light“ bekannt sind. Es werden Regelungslücken aufgezeigt sowie Verbesserungsmöglichkeiten für die sächsischen Regelungen vorgeschlagen. Für einen vollwertigen Rechtsschutz wäre aber eine Umsetzung auf Bundesebene notwendig und wünschenswert.
15

Vybrané problémy při oceňování stavebních prací pro účely znaleckých posudků / Selected problems in the process of building operation appraisal for the purposes of expert opinions

Novák, Jindřich January 2018 (has links)
The basic requirement for a good quality expert opinion are high quality sources of information, i.e. adequately detailed and valid groundwork. This dissertation analyzes groundwork for expert activities in the area of building operation appraisals, handling of information and its transmission within the life cycle of a construction. For this purpose, it is possible to divide the construction according to its functional parts. The thesis puts emphasis on drawing up a budget according to its functional parts, which is clearer for the investors, contractors and real estate administrators as well as the expert. A significant part of the dissertation is dedicated to recommendations on how to determine the usual price of building operations. In this section I define some options of how to determine the usual price of building operations, including their comparison. Likewise, I investigated and compared real agreed prices of building contracts for public commissions. The basic recommendation resulting from this chapter is the recommendation for the Czech statistics department to automate the data collection based on registers of building operations created with one of the budgeting programs (preferably according to functional parts). For the experts, I prepared a set of recommendations based on the analyzed differences between the budgeted prices and those applied in real contracts. There is no generally accepted method to evaluate the losses created due to delays in construction. For the purposes of this dissertation, I investigated the common prices of rent of the individual equipment and then established two approaches to put value on the cost of equipping the site, percentage rate and individual calculation. I examine in more detail the issues related to quantification of costs for wintertime arrangements. At the end of the chapter I define recommendations for experts. With regard to recommendations for establishing discounts from the construction price due to occurrence of defects and unfinished tasks, I analyzed real examples of distribution of defects and unfinished tasks at the moment of delivering the building operation to the investor and discovered that approximately 50% of defects are part of the surface working. Additionally, I analyzed the Czech technical regulations regarding surface working in order to find basis for assessment of the presence or absence of a defect. While investigating the approach to non-removable defects, I discovered incorrectly considered shelf life of waterproofing within the appraisal. Based on this, I investigated the market and determined the shelf life of common waterproofing systems. At the end of this dissertation I carry out a comparison of selected items of the two pricing systems most commonly used in the Czech Republic, URS and RTS. The differences are a result of contemplating using different technologies, varied mechanisms and diverse approaches to determine the costs of material.
16

Studie průběhu zakázky firmou / The Study of Order Processing Through Enterprise

Štambacherová, Gabriela January 2012 (has links)
This thesis analyzes the study during the engagement the company Štambacher, s.r.o., which deals with plumbing works. The thesis includes description of present time and proposals of solutions. These proposals would ideally should lead to the acquisition of new orders, increase the satisfaction of customers and competitiveness in the market.
17

Teilautomatisierung der Bauüberwachung und Abnahmeprüfung von Anlagen der Leit- und Sicherungstechnik am Beispiel der ETCS-Balise

Apel, Norbert Klaus 21 February 2024 (has links)
In der Leit- und Sicherungstechnik sollen die Bauausführung und Abnahmeprüfung deutlich beschleunigt und wegen des Fachkräftemangels auch ressourcenschonender durchgeführt werden. Es wird eine Methodik zur Optimierung und Teilautomatisierung dieser Aufgabenstellungen vorgestellt. Nach Darlegung der aktuellen Herausforderungen wird ein IT-gestütztes Verfahren beschrieben, welches neben der Ablaufbeschleunigung auch die Automatisierung der Daten- und der Qualitätssicherung verwirklicht. Ferner werden ergänzende Werkzeuge inklusive ihrer Mindestanforderungen vorgestellt, mit welchen die datenbankgestützte Sicherung der Ergebnisse und deren Bereitstellung für nachfolgende Arbeitsschritte ermöglicht wird. Die Datenbanklösung ist Grundlage für eine durchgängige, digitale Datenhaltung während der gesamten Projektumsetzung. Abschließend wird eine Sicherheits- und Zuverlässigkeitsbewertung durchgeführt und es werden Vorschläge zur Systemeinführung gegeben.:1 Einleitung 11 1.1 Motivation 11 1.2 Handlungsbedarf 11 1.3 Zielstellung 13 1.4 Methodik und Struktur 14 1.4.1 Methodische Herangehensweise 14 1.4.2 Struktur der vorliegenden Arbeit 15 2 Definition des Betrachtungsumfangs 16 2.1 Ausgangspunkt der Betrachtungen 16 2.1.1 Grundlagen für LST-Planungen 18 2.1.2 Ergebnisse der digitalen Planung 19 2.1.3 Grundlagen für die Signalbauindustrie 20 2.1.4 Grundlagen der Bauüberwachung und Abnahmeprüfung 20 2.2 Bearbeitungsschwerpunkte 21 2.2.1 Innenanlage von LST-Projekten 21 2.2.2 Außenanlage von LST-Projekten..21 2.2.3 Ressourcenbedarf bei LST-Projekten 24 2.3 Projektaufträge und Arbeitskreise 26 2.3.1 Vorstandsauftrag der DB Netz AG vom 28.07.2015 26 2.3.2 Beschleunigung von Abnahmeprozessen der Stellwerkstechnik 27 2.3.3 Expertennetzwerk Projektrealisierung STE .28 2.4 Betrachtungsbereich der vorliegenden Arbeit 28 2.5 Zusammenfassung 30 3 Analyse der Bauausführung von LST-Projekten 32 3.1 Umsetzung von LST-Projekten bei ausgewählten Eisenbahninfrastrukturunternehmen (EIU) 33 3.2 Vorgaben für die Projektumsetzung bei der SBB 34 3.3 Vorgaben für die Projektumsetzung bei der ÖBB 35 3.4 Vorgaben für die Projektumsetzung bei der DB AG 37 3.4.1 Prozesse zur Bauausführung bei der DB AG 37 3.4.2 Regelwerk zur Bauausführung bei der DB AG 40 3.4.3 Fazit der Betrachtung Prozesse und Regelwerk der DB AG 42 3.5 Zusammenfassung 43 4 Teilautomatisierung der Abnahmeprüfung 45 4.1 Betrachtungsbereich und Schnittstellen 45 4.1.1 Einführung 45 4.1.2 Eurobalise - Verwendete Begriffe und Abkürzungen 45 4.1.3 Vertiefter Betrachtungsbereich 48 4.2 Grundlagen Bauausführung 49 4.2.1 Vorschlag für ein Prüf- und Dokumentationsblatt Balise 49 4.2.2 Differenzierung Prüfungen aus dem Merkblatt Eurobalise S21 52 4.2.3 Generierung der Arbeitsinformationen Balise 56 4.2.4 Unverwechselbarkeitskennzeichnung der Balisen 59 4.2.5 Übernahme Daten aus der digitalen Planung 65 4.2.6 Anforderungen an eine LST Datenbank. 67 4.2.7 Architektur der LST-Datenbank 69 4.2.8 Synchronisierung des Baufortschritts über die LST-Datenbank. 72 4.2.9 Positionsbestimmung des Einbauortes der Balisen 73 4.3 Leistungsanteile bei der Signalbauindustrie 77 4.3.1 Materialisierung von Bauteilen und Komponenten 77 4.3.2 Projektierung der Balise durch die Signalbauindustrie 79 4.3.3 Programmierung Balise durch die Signalbauindustrie.81 4.3.4 Montage der Balise durch die Signalbauindustrie .85 4.4 Bauüberwachung 90 4.5 Abnahmeprüfung durch den Prüfsachverständigen .92 4.6 Übernahme Anlage durch Anlageverantwortlichen .98 4.7 Qualifikation der einzusetzenden Mitarbeiter 99 4.8 Zusammenfassung 101 5 Auswirkungsbewertungen . 105 5.1 Auswirkungen auf vorhandene Richtlinien und Prozesse . 105 5.1.1 Datenpunkttabelle 1 der Ril 819.1344 [RIL819e] 105 5.1.2 Arbeitsinformationen Balise 105 5.1.3 Prüf- und Dokumentationsblatt Balise .. 106 5.1.4 Auswirkungen auf vorhandene Prozesse ... 106 5.2 Auswirkungen auf genutzte Programme ... 106 5.2.1 Digitale Bearbeitungsblätter Balise .... 107 5.2.2 Ergänzung der DiAapp .... 111 5.2.3 Anforderungen an das Datenbanksystem ... 111 5.3 Auswirkungen auf die Sicherheit .. 112 5.3.1 Allgemeines .... 112 5.3.2 Sicherheitsbetrachtungen .112 5.3.3 Zuverlässigkeitsbetrachtungen ... 117 5.3.4 Datenschutz und Datensicherheit . 118 5.4 Auswirkungen auf die Effizienz .... 119 5.4.1 Teilautomatisierung Materialisierung durch SBI .. 119 5.4.2 Archivierung von Datentelegrammen im DBS .... 119 5.4.3 Arbeitsinformationen Balise ..... 119 5.4.4 Digitale Bearbeitungsblätter Balise .... 120 5.4.5 Datenbereitstellung für Instandhaltungssteuerung .... 120 5.4.6 Prognose Effekte durch Teilautomatisierung .. 120 5.5 Zusammenfassung .. 123 6 Umsetzungsplanung ... 124 6.1 Praxistest der Forschungsergebnisse ... 124 6.1.1 Auswahlkriterien für einen Praxistest 125 6.1.2 Organisatorische Voraussetzungen 125 6.1.3 Technische Voraussetzungen . 128 6.1.4 Qualifikation der Projektbeteiligten ... 129 6.2 Umsetzung in der Bauausführung und Abnahmeprüfung . 130 6.2.1 Veränderte Vorgaben an die Signalbauindustrie ... 130 6.2.2 Anpassungen der Vorgaben an die Bauüberwachung ... 131 6.2.3 Anpassung der Vorgaben für die Abnahmeprüfung ..... 133 6.3 Zusammenfassung .......134 7 Schlussbetrachtungen und Ausblick ... 135 Abkürzungsverzeichnis... 142 Abbildungsverzeichnis .. 146 Tabellenverzeichnis .. 148 Literaturverzeichnis ..... 150 Glossar .... 159 Anhang: Vorbemerkungen ... 161 Anhang A: Zusammenfassung der Voraussetzungen der Abnahmeprüfung 162 Anhang B: Vorgaben an die Bauüberwachung 163 Anhang C: Vorgaben an die Abnahmeprüfung 164 Anhang D: Analyse von Mängellisten aus Abnahmeprüfungen 165 Anhang E: Differenzierung Merkblatt Eurobalise S21 69 Anhang F: Arbeitsinformationen (AI) Eurobalise S21 174 Anhang G: Digitale Bearbeitungsblätter (DBB) Balise 182 Anhang H: Anforderungen an ein Georeferenzsystem für LST 189 Anhang I: Datenpunkttabelle 1 mit Ergänzungen 192 Anhang J: Teilautomatisierungen bei der Signalbauindustrie 193 Anhang K: Positionsbestimmung in der LST 194 Anhang L: Strukturierte Interviews und Expertengespräche 198
18

Statybos darbų laiko valdymo sistema ir jos tyrimas / Construction work time control system and its investigation

Ringys, Tadas 24 September 2008 (has links)
Magistriniame darbe išanalizuoti projektų valdymo metodai ir algoritmai, išnagrinėti darbų kalendorinio grafiko sudarymo principai, sukurtas statybos darbų grupavimo ir darbo laiko paskaičiavimo konceptualus modelis ir išreikštiniai algoritmai dviems grupavimo scenarijams. Išvestos formulės darbo kiekiui sąmatoje, objekte ir komplekse apskaičiuoti. Pasitelkus projektų valdymo teoriją, sukurtas MS Project COM programinis priedas SDKG, leidžiantis statybos vadovui modeliuoti statomo objekto kalendorinį darbų grafiką. COM priedo programavimo darbai atlikti Microsoft Visual Studio Profesional 2005 aplinkoje, pasinaudojus Visual Basic 2005 programavimo galimybėmis. Atlikti duomenų iš sąmatos nuskaitymo, išsaugojimo, projekto duomenų įkėlimo, grafiko nubrėžimo laikų priklausomybės nuo sąmatos apimties tyrimai. Išvesta formulė minimalaus pelės paspaudimų skaičiaus radimui, priklausomai nuo darbų ir grupių skaičiaus. Darbo rezultatai įdiegti statybos įmonėse UAB “Armobetas” ir UAB “Merko statyba”. / Project management methods and algorithms have been analysed in this master paper. Schedule making principles have been considered. Construction work grouping and work time conceptual model and explicit algorithms for two grouping scenarios have been developed. Using project management theory, MS Project COM add-in called SDKG has been developed. This add-in allows the construction supervisor to model the schedule of the object under construction. The add-in has been developed in MS Visual Stuodio 2005 environment using Visual Basic 2005. An investigation to study data retrieval from an estimate, saving, project data deploying and plotting time dependencies on the estimate volume has been carried out. A formula to find the minimal number of mouse clicks depending on the number of works and groups has been derived. The results obtained have been applied in construction companies UAB „Armobetas“ and UAB „Merko statyba“.
19

Ocenění stavebního díla v ČR a na Ukrajině / The award of the works in the Czech Republic and Ukraine

Shashko, Maryna January 2014 (has links)
The main aim of this master’s thesis is to find out the extent of costs for construction in CZ and Ukraine. Costs for the construction were calculated according to the conditions in CZ an according to the conditions in Ukraine. There were made analysis of differences in construction works, which shows the biggest difference. Costs were determined in crowns for particular line of construction works calculation according to the ordinary calculation pattern which is using in CZ. Conversion of costs from Ukraine currency (UAH) to CZK was made with an actual currency course. The consequence of the work is analysis and evaluation of difference of construction costs.
20

Ocenění výstavby budov v Rusku / Valuation of building construction in Russia

Zlobina, Daria January 2015 (has links)
The main aim of this master’s thesis is to find out the extent of costs for construction in CZ and Russia. Costs for the construction were calculated according to the conditions in CZ an according to the conditions in Russia. There were made analysis of differences in construction works, which shows the biggest difference. Costs were determined in crowns for particular line of construction works calculation according to the ordinary calculation pattern which is using in CZ. Conversion of costs from Russian currency (RUB) to CZK was made with an actual currency course. The consequence of the work is analysis and evaluation of difference of construction costs.

Page generated in 0.1546 seconds