• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 3
  • Tagged with
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Viabilidade do uso do biogás da bovinocultura e suinocultura para geração de energia elétrica e irrigação em propriedades rurais / The viability of using Biogas from bovine culture and swine culture to the generation of electric power and irrigation for rural proprieties

Coldebella, Anderson 20 July 2006 (has links)
Made available in DSpace on 2017-07-10T19:25:03Z (GMT). No. of bitstreams: 1 Anderson Coldebella.pdf: 3099764 bytes, checksum: d62674c1adb9dfbfbdf63d0ce7fcd744 (MD5) Previous issue date: 2006-07-20 / The present work had as an objective to evaluate the viability of the use of biogas proceeding from the activities of bovine culture of milk and swine culture in sets motor generator and motor bomb to the irrigation in agricultural properties. The experiment was done in the city of Toledo/PR, in two different properties, one with its activities directed to the bovine culture of milk with 130 animals in a regimen of confinement and the other property with its activities directed to the swine culture, working as a pig producer unit with a breeding of 1,000 breeders. Both of the properties use biodigestors to the treatment of the generated effluents and they have as byproducts the biogas and the biofertilizer. To establish the consumption of biogas per HP/hour it was used a compressor to supply a bag named gas-tank. With the amount of biogas known inside the gas-tank, it was connected to the engines, which remained working until the consumption of all the biogas. To the biogas from the bovine culture the consumption was of 0,981 m3/HP/hour to the set of motor bomb and of 2,77 m3/HP/hour to the set of motor generator, while that for the biogas from swine culture the consumption was of 1,113 m3 /HP/hour and 0,791 m3/HP/hour to motor generator and motor bomb respectively. The efficiency to the power production was of 4.14% to the biogas from bovines and of 10,3% to the biogas from swines. Considering the time of amortization of 10 years, the cost of the biogas was of R$ 0,229 / m3 for bovines and of 0,063 / m3 for swines. The cost of the electrical power generated is related to the applying of the capacity of the plan and to the cost of biogas, to the biogas from the bovine culture the cost of the generated power was of R$ 465,07/MWh and to the biogas from swine culture the cost was of R$ 90,86/MWh, considering that both of the plans be operating fir 10 hours a day. The time of return for the investment depends on the initial investment and on the price of the electric power charged by the power company, with a tariff of R$ 300,00/MWh operating the generation system for four hours a day and considering the economy generated with the irrigation system, the time of return found was of 4.3 and 6.7 years to bovines and swines respectively. Besides that, the biofertilizer generated from bovines can fertilize 37 hectares a year and the biofertilizer generated from swines can fertilize 480 hectares a year. Despite the low levels of efficiency to power generation, the time of investment return is reasonable and it can become shorter if the economy generated by the use of the biofertilizer is considered. / O presente trabalho teve por objetivo avaliar a viabilidade do uso do biogás proveniente das atividades de bovinocultura de leite e suinocultura em conjuntos motor gerador e motor bomba para irrigação em propriedades rurais. O experimento foi realizado no município de Toledo/PR, em duas propriedades, uma com as atividades voltadas para bovinocultura de leite com 130 cabeças em regime de confinamento e outra com as atividades voltadas a suinocultura trabalhando como unidade produtora de leitões com um plantel de 1.000 matrizes. Ambas as propriedades utilizam biodigestores para tratamento dos efluentes gerados e tem como subprodutos o biogás e o biofertilizante. Para determinar o consumo de biogás por HP/hora foi utilizado um compressor para abastecer uma bolsa denominada de gasômetro. Com a quantidade de biogás conhecida dentro do gasômetro o mesmo foi conectado aos motores que permaneceram em funcionamento até consumir todo biogás. Para o biogás da bovinocultura o consumo foi de 0,981m³/HP/hora para o conjunto motor bomba e de 2,77m³/HP/hora para o conjunto motor gerador, enquanto que para o biogás de suinocultura o consumo foi de 1,113m³/HP/hora e 0,791m³/HP/hora para gerador e bomba respectivamente. A eficiência para produção de energia foi de 4,14% para o biogás de bovinos e de 10,3% para o biogás de suínos. Considerando o tempo de amortização de 10 anos o custo do biogás foi de R$ 0,229 por m³ para bovinos e de R$ 0,063 por m³ para suínos. O custo da energia elétrica gerada está em função do aproveitamento da capacidade da planta e do custo do biogás, para o biogás da bovinocultura o custo da energia gerada foi de R$ 465,07 por MWh e para o biogás de suinocultura o custo foi de R$ 90,86 por MWh considerando que ambas as plantas estejam operando durante 10 horas diárias. O tempo de retorno do investimento depende do investimento inicial e do valor da tarifa de energia elétrica cobrada pela concessionária, com uma tarifa de R$ 300,00 por MWh operando o sistema de geração por 4 horas diárias e considerando a economia gerada com o sistema de irrigação o tempo de retorno encontrado foi de 4,3 e 6,7 anos para bovinos e suínos respectivamente. Além disso, o biofertilizante gerado pelos bovinos pode fertilizar 37 ha/ano e o gerado pelos suínos 480 ha/ano. Apesar dos baixos níveis de eficiência para geração de energia o tempo de retorno do investimento é razoável e pode se tornar menor se for considerada a economia gerada pelo uso do biofertilizante.
2

Viabilidade do uso do biogás da bovinocultura e suinocultura para geração de energia elétrica e irrigação em propriedades rurais / The viability of using Biogas from bovine culture and swine culture to the generation of electric power and irrigation for rural proprieties

Coldebella, Anderson 20 July 2006 (has links)
Made available in DSpace on 2017-05-12T14:48:25Z (GMT). No. of bitstreams: 1 Anderson Coldebella.pdf: 3099764 bytes, checksum: d62674c1adb9dfbfbdf63d0ce7fcd744 (MD5) Previous issue date: 2006-07-20 / The present work had as an objective to evaluate the viability of the use of biogas proceeding from the activities of bovine culture of milk and swine culture in sets motor generator and motor bomb to the irrigation in agricultural properties. The experiment was done in the city of Toledo/PR, in two different properties, one with its activities directed to the bovine culture of milk with 130 animals in a regimen of confinement and the other property with its activities directed to the swine culture, working as a pig producer unit with a breeding of 1,000 breeders. Both of the properties use biodigestors to the treatment of the generated effluents and they have as byproducts the biogas and the biofertilizer. To establish the consumption of biogas per HP/hour it was used a compressor to supply a bag named gas-tank. With the amount of biogas known inside the gas-tank, it was connected to the engines, which remained working until the consumption of all the biogas. To the biogas from the bovine culture the consumption was of 0,981 m3/HP/hour to the set of motor bomb and of 2,77 m3/HP/hour to the set of motor generator, while that for the biogas from swine culture the consumption was of 1,113 m3 /HP/hour and 0,791 m3/HP/hour to motor generator and motor bomb respectively. The efficiency to the power production was of 4.14% to the biogas from bovines and of 10,3% to the biogas from swines. Considering the time of amortization of 10 years, the cost of the biogas was of R$ 0,229 / m3 for bovines and of 0,063 / m3 for swines. The cost of the electrical power generated is related to the applying of the capacity of the plan and to the cost of biogas, to the biogas from the bovine culture the cost of the generated power was of R$ 465,07/MWh and to the biogas from swine culture the cost was of R$ 90,86/MWh, considering that both of the plans be operating fir 10 hours a day. The time of return for the investment depends on the initial investment and on the price of the electric power charged by the power company, with a tariff of R$ 300,00/MWh operating the generation system for four hours a day and considering the economy generated with the irrigation system, the time of return found was of 4.3 and 6.7 years to bovines and swines respectively. Besides that, the biofertilizer generated from bovines can fertilize 37 hectares a year and the biofertilizer generated from swines can fertilize 480 hectares a year. Despite the low levels of efficiency to power generation, the time of investment return is reasonable and it can become shorter if the economy generated by the use of the biofertilizer is considered. / O presente trabalho teve por objetivo avaliar a viabilidade do uso do biogás proveniente das atividades de bovinocultura de leite e suinocultura em conjuntos motor gerador e motor bomba para irrigação em propriedades rurais. O experimento foi realizado no município de Toledo/PR, em duas propriedades, uma com as atividades voltadas para bovinocultura de leite com 130 cabeças em regime de confinamento e outra com as atividades voltadas a suinocultura trabalhando como unidade produtora de leitões com um plantel de 1.000 matrizes. Ambas as propriedades utilizam biodigestores para tratamento dos efluentes gerados e tem como subprodutos o biogás e o biofertilizante. Para determinar o consumo de biogás por HP/hora foi utilizado um compressor para abastecer uma bolsa denominada de gasômetro. Com a quantidade de biogás conhecida dentro do gasômetro o mesmo foi conectado aos motores que permaneceram em funcionamento até consumir todo biogás. Para o biogás da bovinocultura o consumo foi de 0,981m³/HP/hora para o conjunto motor bomba e de 2,77m³/HP/hora para o conjunto motor gerador, enquanto que para o biogás de suinocultura o consumo foi de 1,113m³/HP/hora e 0,791m³/HP/hora para gerador e bomba respectivamente. A eficiência para produção de energia foi de 4,14% para o biogás de bovinos e de 10,3% para o biogás de suínos. Considerando o tempo de amortização de 10 anos o custo do biogás foi de R$ 0,229 por m³ para bovinos e de R$ 0,063 por m³ para suínos. O custo da energia elétrica gerada está em função do aproveitamento da capacidade da planta e do custo do biogás, para o biogás da bovinocultura o custo da energia gerada foi de R$ 465,07 por MWh e para o biogás de suinocultura o custo foi de R$ 90,86 por MWh considerando que ambas as plantas estejam operando durante 10 horas diárias. O tempo de retorno do investimento depende do investimento inicial e do valor da tarifa de energia elétrica cobrada pela concessionária, com uma tarifa de R$ 300,00 por MWh operando o sistema de geração por 4 horas diárias e considerando a economia gerada com o sistema de irrigação o tempo de retorno encontrado foi de 4,3 e 6,7 anos para bovinos e suínos respectivamente. Além disso, o biofertilizante gerado pelos bovinos pode fertilizar 37 ha/ano e o gerado pelos suínos 480 ha/ano. Apesar dos baixos níveis de eficiência para geração de energia o tempo de retorno do investimento é razoável e pode se tornar menor se for considerada a economia gerada pelo uso do biofertilizante.
3

Avaliação dos custos de água e energia elétrica para frutíferas irrigadas no Estado da Paraíba. / Evaluation of water and electricity costs for irrigated fruit trees in the State of Paraíba.

LOPES, Riuzuani Michelle Bezerra Pedrosa. 15 June 2018 (has links)
Submitted by Johnny Rodrigues (johnnyrodrigues@ufcg.edu.br) on 2018-06-15T20:28:16Z No. of bitstreams: 1 RIUZUANI MICHELLE BEZERRA PEDROSA LOPES - DISSERTAÇÃO PPGEA 2008..pdf: 44618002 bytes, checksum: 10bd1e265640cd193f330756b03247d2 (MD5) / Made available in DSpace on 2018-06-15T20:28:16Z (GMT). No. of bitstreams: 1 RIUZUANI MICHELLE BEZERRA PEDROSA LOPES - DISSERTAÇÃO PPGEA 2008..pdf: 44618002 bytes, checksum: 10bd1e265640cd193f330756b03247d2 (MD5) Previous issue date: 2008-02 / Busca-se, com a realização deste trabalho, a avaliação dos custos de água e energia elétrica para frutíferas irrigadas no Estado da Paraíba. Com este propósito se obtiveram, de início, as demandas de água e energia elétrica para as culturas do mamão, coco e banana, através do sistema de irrigação por aspersão e microaspersão. João Pessoa, Capital da Paraíba, localizada no baixo Rio Paraíba, é o município de menor consumo de água, necessitando de apenas de 37,71, 40,6 e 44,7% das demandas de água e energia elétrica do município de Desterro para as culturas do mamão, coco e banana, respectivamente. O município de Desterro, localizada na subbacia do Taperoá, apresentou a maior evapotranspiração anual e diária, combinada com as menores precipitações anuais, enquanto o município de João Pessoa, localizado no Baixo Rio Paraíba, teve a menor média de evapotranspiração, combinado com boas médias de precipitação provável a nível de 75% de probabilidade de ocorrer; desta forma, Desterro necessita de uma reposição maior de água para as plantas, o que acarreta também maior custo com água e energia elétrica. A demanda de água e energia elétrica aumenta na medida em que os municípios se afastam do litoral paraibano, devido às características hidroclimáticas dos locais do estudo. A região do Baixo Rio Paraíba, obteve as menores médias de demanda e a sub-bacia do Taperoá, obteve as maiores médias de demanda de água e energia elétrica, assim os maiores custos de água e energia elétrica ocorreram na sub-bacia do Taperoá e os menores custos no Baixo Rio Paraíba. Para a agricultura irrigada, a cobrança de água a ser implementada pelo comité da bacia do Rio Paraíba pode servir de incentivo, desde que sejam cobradas tarifas diferentes, isto é, implementar uma tarifa menor para os sistemas de irrigação mais eficientes, acarretando assim, maior economia no consumo de água e, consequentemente menor impacto na bacia, além de uma produção maior por hectare, com o mesmo volume de água captado. Palavras-chaves: Simulação, irrigação, frutíferas. / iis work deals with the evaluation of the costs of power and water for irrigated the planning áreas in Paraíba State. First, the demands of water were obtained and power electricity for cultures of papaya, coconut and banana using the irrigation system based on aspersion e microaspersion. João Pessoa, capital of Paraíba State, located in the lower Paraíba River, is the city which has the lowest water consumption and it requires only 37.71, 40.6 and 44.7% the demands of power and water of Desterro city for cultures of papaya, coconut and banana, respectively. The city of Desterro, located at the basin of Taperoá River, has presented the highest leveis for annual and daily evapotranspiration combined with the lowest rain rates. On the other hand, Jõao Pessoa, presented in the lower Paraíba River, presented the lowest leveis for average evapotranspiration and good rain rates of 75% of occurrence probability. Thus, the city of DesteiTO needs a higher reposition of water for the plants which leads a higher costs of water and electrical power. For cities located in the Paraíba State, the demand of water and electrical power increases when the distance between the cities and the offshore increases as a consequence of the precipitation and weather carachateristics of the cities used in this study. The region of the lower Paraíba River achieved the lowest average leveis for demand of water and electrical power while the sub-basin of the Taperoá River achieved the highest average leveis. Thus, the highest costs of water and electrical power occurred in sub-basin of the Taperoá River and lowest ones occurred in the lower Paraíba River. For irrigated agriculture, the taxes for the use of water should be implemented by the committe of the River Paraíba and they can be serving as a motivation for the efficient use of the water. In this case, lower taxes can be applied for efficient irrigation systems. So, a lower consumption of water should be achieved and the higher productivity by hectare can be obtained for the same volume of water. Keywords: Irrigation, simulation, planning

Page generated in 0.1371 seconds