• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 262
  • 6
  • 2
  • Tagged with
  • 270
  • 270
  • 270
  • 202
  • 128
  • 108
  • 81
  • 79
  • 68
  • 54
  • 47
  • 47
  • 46
  • 42
  • 41
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

Alocação otimizada de dispositivos indicadores de faltas em linhas aéreas de distribuição utilizando busca em vizinhança variável / Optimized allocation of fault indicator devices in distribution air lines using variable neighborhood search

Vasconcelos, Jáder de Alencar 30 May 2017 (has links)
Submitted by Erika Demachki (erikademachki@gmail.com) on 2017-06-13T17:58:47Z No. of bitstreams: 2 Dissertação - Jáder de Alencar Vasconcelos - 2017.pdf: 5455445 bytes, checksum: 681a531dca4e2dfb4795b7619cc0dde5 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2017-06-14T15:19:47Z (GMT) No. of bitstreams: 2 Dissertação - Jáder de Alencar Vasconcelos - 2017.pdf: 5455445 bytes, checksum: 681a531dca4e2dfb4795b7619cc0dde5 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2017-06-14T15:19:47Z (GMT). No. of bitstreams: 2 Dissertação - Jáder de Alencar Vasconcelos - 2017.pdf: 5455445 bytes, checksum: 681a531dca4e2dfb4795b7619cc0dde5 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2017-05-30 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / Electricity distribution networks are constantly subject to contingencies that can lead to interruption of supply, bringing disruption to consumers of electric energy and increasing the cost of compensation for violation of individual indicators of continuity. In this context, Fault Indicator Devices (PIs) have been shown to be a promising alternative to improve Quality of Service. As the use of these equipments requires considerable investments, the use of IFs in arbitrary stretches of the network is prohibitive, making necessary the development of a methodology for the optimal allocation of these devices. In this sense, it is understood that a good methodology should minimize the average time of displacement of the maintenance teams to the locations of the defects, implying in the significant reduction of the other indicators dependent on this time, especially the Equivalent Duration of Interruption per Consumer Unit (DEC). The main contribution of this dissertation is the implementation of a meta-heuristic Variable Neighborhood Search (VNS), in order to determine the positions for the installation of the IFs, in order to reduce to the maximum the DEC estimation. In the methodology developed, the chosen network positions (sections) contemplate both the main trunk and the extensions, in addition to considering the influence of other protection devices in the network. In addition, the estimation of the average search time in the presence of these devices considers the failure rates and lengths of the stretches, extending the estimates made in other works. The results, obtained for a real feeder, in most of the studied situations, led to the allocation of IFs in sections of branches, bringing a more significant reduction in the Quality of Service indicators and demonstrating the effectiveness of the proposed methodology. / As redes de distribuição de energia elétrica estão constantemente sujeitas a contingências que podem levar à interrupção do fornecimento, trazendo transtornos aos consumidores da energia elétrica e potencializando os custos de ressarcimento por violação dos indicadores individuais de continuidade. Nesse contexto, os Dispositivos Indicadores de Faltas (IFs) têm se mostrado uma alternativa promissora para melhorar a Qualidade do Serviço. Como a utilização desses equipamentos exige investimentos consideráveis, o emprego de IFs em trechos arbitrários da rede é proibitivo, tornando necessário o desenvolvimento de uma metodologia para a alocação ótima destes dispositivos. Nesse sentido, entende-se que uma boa metodologia deve minimizar o tempo médio de deslocamento das equipes de manutenção até os locais dos defeitos, implicando na redução significativa dos demais indicadores dependentes deste tempo, em especial a Duração Equivalente de Interrupção por Unidade Consumidora (DEC). Tendo isso em vista, a principal contribuição desta dissertação consiste na implementação de uma meta-heurística Variable Neighborhood Search (VNS), a fim de determinar as posições para instalação dos IFs, de modo a reduzir ao máximo a estimativa do DEC. Na metodologia desenvolvida, as posições (trechos) de rede escolhidos contemplam tanto o tronco principal quanto os ramais, além de considerar a influência de outros dispositivos de proteção na rede. Somado a isso, a estimativa do tempo médio de busca na presença desses dispositivos considera as taxas de falha e comprimentos dos trechos, estendendo as estimativas realizadas em outros trabalhos. Os resultados, obtidos para um alimentador real, em grande parte das situações estudadas, levaram à alocação de IFs em trechos de ramais, trazendo uma redução mais significativa nos indicadores de Qualidade do Serviço e demonstrando a eficácia da metodologia proposta.
212

Planejamento da expansão de sistema de distribuição considerando redução de cenários de demanda e geração distribuída / Distribution system expansion planning with demand scenario reduction and distributed generation

Santos, Nicholas Eduardo Lopes dos 04 May 2018 (has links)
Submitted by Wagner Junior (wagner.junior@unioeste.br) on 2018-09-05T19:37:48Z No. of bitstreams: 8 Nicholas_Eduardo_Lopes_dos_Santos_2018.pdf: 1134120 bytes, checksum: de6da7ce734348755e0ca7b2b4212a63 (MD5) cluster_nodes_16_size_48.csv: 59426 bytes, checksum: f775d4775a1523f204043c946c2d57ac (MD5) cluster_nodes_16_size_200.csv: 236341 bytes, checksum: 40ab39add5f0d778c6539d28c894de41 (MD5) cluster_unit_1_size_48.csv: 5973 bytes, checksum: 6eac99d981bebc23d28c41ac1d577e2c (MD5) cluster_unit_1_size_200.csv: 16244 bytes, checksum: ef59fdb0e49418e1fe6aed35061d3b43 (MD5) cluster_unit_2_size_48.csv: 9118 bytes, checksum: 320e7f72fe0f6e9ffc39e6497b369be1 (MD5) cluster_unit_2_size_200.csv: 37612 bytes, checksum: 189ba1ad3d47ba41af4d26373be61f36 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2018-09-05T19:37:48Z (GMT). No. of bitstreams: 8 Nicholas_Eduardo_Lopes_dos_Santos_2018.pdf: 1134120 bytes, checksum: de6da7ce734348755e0ca7b2b4212a63 (MD5) cluster_nodes_16_size_48.csv: 59426 bytes, checksum: f775d4775a1523f204043c946c2d57ac (MD5) cluster_nodes_16_size_200.csv: 236341 bytes, checksum: 40ab39add5f0d778c6539d28c894de41 (MD5) cluster_unit_1_size_48.csv: 5973 bytes, checksum: 6eac99d981bebc23d28c41ac1d577e2c (MD5) cluster_unit_1_size_200.csv: 16244 bytes, checksum: ef59fdb0e49418e1fe6aed35061d3b43 (MD5) cluster_unit_2_size_48.csv: 9118 bytes, checksum: 320e7f72fe0f6e9ffc39e6497b369be1 (MD5) cluster_unit_2_size_200.csv: 37612 bytes, checksum: 189ba1ad3d47ba41af4d26373be61f36 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2018-05-04 / Fundação Araucária de Apoio ao Desenvolvimento Científico e Tecnológico do Estado do Paraná (FA) / Traditionally, the maximum demand forecast in the planning horizon is used to determine the additions and reinforcements required for the expansion of a distribution system. The alternatives obtained with this model are considered overestimated because it considers a constant demand behavior along the planning horizon. Therefore, the search for a better representation of the demand in the planning models has been carried out, among them, the scenarios reduction based on clustering. This paper presents an analysis about the possibility of obtaining alternatives of expansion of lower cost in the planning of a distribution system representing the demand to be met and the distributed generation that can not be dispatched by more than one level. It is based on a planning model that considers a better representation of the load and generation that is solved through classical optimization techniques. The scenario reduction, used in the model, is based on levels groups that are defined and obtained whith k-means algorithm application. In addition to presenting expansion alternatives for different levels groups, it also shows that the processing times resulting from the combinatorial problem are acceptable. / Tradicionalmente, utiliza-se a demanda máxima prevista no horizonte de planejamento para determinar as adições e reforços necessários para a expansão de um sistema de distribuição. As alternativas obtidas com esse modelo são consideradas superestimadas, pois considera um comportamento de demanda constante ao longo do horizonte de planejamento. Diante disso, a busca por uma melhor representação da demanda nos modelos de planejamento tem sido realizada, dentre elas, a redução de cenários baseada em clusterização. Este trabalho apresenta uma análise sobre a possibilidade de obtenção de alternativas de expansão de menor custo no planejamento de um sistema de distribuição representando a demanda a ser atendida e a geração distribuída não despachável por mais de um patamar. Ela baseia-se em um modelo de planejamento que considera uma melhor representação da carga e da geração que seja resolvido através de técnicas de otimização clássica. A redução de cenários, utilizada no modelo, é baseada em grupos de patamares aos quais são definidos e obtidos com a aplicação do algoritmo k-médias. Além de apresentar alternativas de expansão para diferentes grupos de patamares, também mostra que os tempos de processamento, resultantes do problema combinatorial, são aceitáveis.
213

INVESTIGAÇÃO CRÍTICA DA QUALIDADE DA ENERGIA ELÉTRICA DISPONÍVEL NA SUBESTAÇÃO DO CENTRO DE LANÇAMENTO DE ALCÂNTARA / CRITICAL RESEARCH OF THE QUALITY OF ELECTRIC POWER AVAILABLE IN THE SUBSTATION OF ALCÂNTARA LAUNCH CENTRE

Cruz, Harnoldo Castro 14 December 2012 (has links)
Made available in DSpace on 2016-08-17T14:53:23Z (GMT). No. of bitstreams: 1 Dissertacao Harnoldo Castro.pdf: 2052364 bytes, checksum: 3ff44ce616ef2f1e748c29067008a2d1 (MD5) Previous issue date: 2012-12-14 / This work investigates electromagnetic disturbances that affect the power quality of the Alcântara Launch Center (CLA), supplied by the local power distribution utility company and the self-generation of the Center, emphasizing disturbances for sensitivity of electrical ground support equipment, variations in voltage and short-term transients. From a bibliographical study, the main electromagnetic phenomen apresented are related to the power quality, showing the causes, consequences and suggestions for mitigation of these events, including the reduction of inrush current, based on standard norms related to the subject. The monitoring was performed using an accurate monitoring equipment during a two-rocket launch campaign, for a better contextualization ofvoltage variations associated to short-term transients. From the records and gathered data, critical events and power quality indices associated to the distribution utility and to the generation set were analyzed, as well as the severe disturbances characterized by CBEMA curve. The results provided subsidies to improve and reduce the effects of voltage short-term and transient events. Thus an operating procedure for special processes is proposed, which can be used both in the aerospace sector as in organizations that have their processes associated to power quality. / O presente trabalho investiga distúrbios eletromagnéticos que afetam a qualidade da energia elétrica do Centro de Lançamento de Alcântara, suprido pela companhia elétrica local e pela autogeração do próprio Centro, enfatizando os distúrbios críticos para a sensibilidade elétrica dos equipamentos de apoio em solo, as variações de tensão de curta duração e os transitórios. A partir de um estudo bibliográfico, são apresentados os principais fenômenos eletromagnéticos relacionados à qualidade da energia elétrica, mostrando as causas, consequências e sugestões para mitigar tais eventos, com destaque para a redução da corrente de energização, com base nas normas internacionais relacionadas ao tema. O monitoramento foi realizado utilizando-se um equipamento de precisão durante a campanha de lançamento de dois foguetes, para melhor contextualizar as variações de tensão de curta duração e os transitórios. A partir dos registros e dados coletados foram analisados os eventos críticos e os indicadores de tensão da distribuidora local de energia elétrica, e da autogeração de energia do Centro, bem como as graves perturbações caracterizadas com a curva CBEMA. Os resultados obtidos forneceram subsídios para reduzir os efeitos dos eventos da variação de tensão de curta duração e transitórios. Assim propõe-se um procedimento operacional para processos especiais, que poderá ser usado tanto no setor aeroespacial quanto nas organizações que tenham seus processos atrelados à qualidade da energia elétrica.
214

Micro-redes elétricas: estado da arte e contribuição para o dimensionamento, aplicação e comercialização da energia produzida. / Microgrid systems: a study on the state-of-the-art and contribution for the dimensioning, application and trading of the power produced.

Tesoro Elena Del Carpio Huayllas 16 June 2015 (has links)
As conseqüências e repercussões do recente blecaute de grande escala ocorrido no Brasil em 2009, que afetou as regiões Sudeste, Sul, Centro-Oeste e Nordeste além do Paraguai todo; assim como aqueles que afetaram a região do Norte e Nordeste dos Estados Unidos (2003) e toda Itália, também em 2003, mostraram mais uma vez que na atualidade a sociedade tem uma dependência quase total da energia elétrica. Em todos os casos, a falta de energia elétrica atingiu de forma significativa vários setores da economia, ao passo que sistemas de transporte elétrico, indústrias e hospitais sem sistemas de geração emergencial, instituições acadêmicas, iluminação pública e residencial e, inclusive, sistemas de comunicação, ficaram praticamente inoperantes. Após esses eventos, houve uma busca por algumas alternativas que ofereçam maior confiabilidade no fornecimento de energia elétrica ou, pelo menos, alternativas que ajudem a minimizar o seu impacto. O estabelecimento de sistemas baseados em micro-redes elétricas mostrou-se como uma alternativa que poderia ser utilizada para tal finalidade, de tal forma que não apenas cargas críticas, mas também boa parte das atividades mencionadas poderia continuar operando durante períodos de contingência. Por outro lado, o conceito das micro-redes elétricas tem ganho recentemente maior atenção em virtude da crescente penetração de fontes de geração distribuída e dos incentivos providos pelos governos para promover a geração de energia através de fontes renováveis como por exemplo a energia eólica, solar, biomassa, hidrelétrica, e outras. Nos mais diversos países do mundo, atualmente, populações assentadas em regiões remotas utilizam esquemas baseados em micro-redes elétricas para o suprimento de energia elétrica. Assim, neste trabalho serão apresentados os resultados referentes ao estudo da tecnologia das micro-redes elétricas, especificamente o seu desempenho diante de condições operativas como o modo de operação ilhado e o modo conectado com a rede elétrica. Particularmente, a transição para o modo de operação ilhado demandou um estudo, através das simulações, mais dedicado. No que se refere à negociação da energia entre a micro-rede e a rede principal, quando da disponibilidade de energia excedente nos períodos de carga reduzida na micro-rede, será apresentada uma análise crítica dos possíveis métodos de tarifação, os quais até agora são apenas utilizados na forma de incentivos governamentais. Será também apresentada uma análise referente à viabilidade econômica de micro-redes, já que para que estas tenham atratividade econômica, os custos de aquisição de equipamentos e operação devem também ser competitivos. / After the occurrence of some major blackouts like the one that affected the Northern and Northeastern part of the United States in 2003, the one that affected the Southeast, Midwest and Northeastern part of Brazil including Paraguay, in 2009; and the blackout that affected the whole Italy in 2003, to mention a few a few of them, there was a rush for seeking some alternatives to deal with such events or at least find out feasible solutions that can contribute to diminish their impact. The lack of electric power, for whatever reason it was, unveiled one common fact, our modern society is so dependent on electricity that during the blackouts areas like the electrical transport system, financing activity, academic institutions, industries, health centers with no emergency or standby generation, public and residential lighting and even some communication systems failed to operate. The establishment of microgrid systems proved to be an alternative that could be used for this purpose; thus, not only critical loads, but also some of the activities mentioned earlier on could continue their operation during such emergency periods. In addition, the concept of micro-grid systems has recently gained particular attention due to the increasing penetration of distributed generation and also due to the incentives provided by the governments to promote the generation of electricity from renewable sources such as wind power, solar, biomass, small hydroelectric schemes, etc. At present, countless settlements located in remote areas worldwide use microgrid systems to generate and distribute electricity. In this work, the results related to the microgrid technology, specifically its performance towards system conditions such as the islanding mode and grid connected mode of operation will be presented. Particularly, the transition to the islanded mode of operation demanded a more dedicated study during the simulations performed. As for the energy trading between the microgrid and the utility, which can occur when the microgrid generators are lightly loaded, it will be presented a critical analysis about the possible tariff methods to be applied. Such tariffs are so far only applied in the form of government subsidies to promote the use of renewable energy sources. Additionally, an analysis of a microgrid economic feasibility to show how competitive or complimentary this technology is with the utility will be presented herein.
215

Uma metodologia para otimização de sistemas elétricos de distribuição A N condutores / A methodology for optimization of N conductors electrical distribution systems

Vieira, Felipe de Alcântara 28 August 2013 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-04-06T19:22:41Z No. of bitstreams: 1 felipedealcantaravieira.pdf: 1984655 bytes, checksum: e8afc46ad440a574f9f1764bed5e412a (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-04-24T03:52:44Z (GMT) No. of bitstreams: 1 felipedealcantaravieira.pdf: 1984655 bytes, checksum: e8afc46ad440a574f9f1764bed5e412a (MD5) / Made available in DSpace on 2016-04-24T03:52:44Z (GMT). No. of bitstreams: 1 felipedealcantaravieira.pdf: 1984655 bytes, checksum: e8afc46ad440a574f9f1764bed5e412a (MD5) Previous issue date: 2013-08-28 / Este trabalho propõe uma metodologia com foco na resolução de problemas de otimização de sistemas elétricos de potência, que por ser extremamente genérica e abrangente, permite a inserção de qualquer tipo de equipamento na modelagem do sistema sob estudo, bem como a análise de desequilíbrios, da geração distribuída e de cabos neutros e aterramentos, em sistemas com N condutores. A metodologia desenvolvida utiliza como base o Método dos Pontos Interiores Primal-Dual aplicado ao Método de Injeção de Correntes para a análise do sistema elétrico considerando equações de injeções de correntes em cada nó, escritas por meio de variáveis complexas em sua forma retangular. A amplitude de utilização do método proposto o faz interessante inclusive para estudos de smart grids, uma vez que possibilita um grau de detalhamento bastante elevado nas representações e análises dos sistemas de distribuição. / This work proposes a methodology focusing on the solution of electrical power systems problems, which for being extremely generical and embracing, allows the inclusion of any type of equipment, in the modeling of the system under study, as well as the analysis of imbalances, distributed generation and of neutral cables and groundings on N conductors systems. The methodology developed is based on the Primal-Dual Interior Point Method applied in the Current Injection Method for the analysis of the electrical system considering the current injections equations at each node, written using complex variables in rectangular formulation. The proposed method has a range of use that make it interesting even for smart grids studies, since it allows a higher degree of details in the representation and analysis of distribution systems.
216

Estimação de estados em redes de distribuição de energia elétrica baseada em medições fasoriais

Pereira, Ingrid Soares 31 August 2015 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-04-15T15:27:12Z No. of bitstreams: 1 ingridsoarespereira.pdf: 1591373 bytes, checksum: 3eaabd818bc093a00de802152356d2ea (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-04-24T03:19:52Z (GMT) No. of bitstreams: 1 ingridsoarespereira.pdf: 1591373 bytes, checksum: 3eaabd818bc093a00de802152356d2ea (MD5) / Made available in DSpace on 2016-04-24T03:19:52Z (GMT). No. of bitstreams: 1 ingridsoarespereira.pdf: 1591373 bytes, checksum: 3eaabd818bc093a00de802152356d2ea (MD5) Previous issue date: 2015-08-31 / Este trabalho apresenta uma nova abordagem para o problema de Estimação de Estados em Redes de Distribuição de Energia Elétrica utilizando os dados históricos de cargas e medidas obtidas pelos Sistemas de Medição Fasorial Sicronizada (PMUs – Phasor Measurement Units). Nesta formulação as tensões em módulo e fase são escolhidas como variáveis de estados e o problema é matematicamente formulado como um problema de otimização com restrições de igualdade e desigualdade. A função objetivo é formada pela soma quadrática dos resíduos de estimação, definidos como a diferença entre os valores medidos através das PMUs e os valores calculados. As restrições de igualdade são as injeções de potencia ativa e reativa nulas nas barras de passagem. As restrições de desigualdade estão associadas às potências ativas e reativas das barras não monitoradas, onde admite-se limites inferiores e superiores em função dos dados históricos das cargas (potências ativas e reativas). Estudos de casos são realizados utilizando-se um sistemas simples 10 barras, e os sistemas IEEE da literatura de 33 e 84 barras. Os dados de medições fasoriais foram obtidos utilizandose um programa computacional de cálculo de fluxo de potência. Os resultados da estimação de estados utilizando a metodologia proposta foram obtidos através de simulações no ambiente MATLAB e comparados com os resultados do programa de fluxo de potência para validação. A utilização de medição fasorial sincronizada nos entroncamentos e no final dos ramais do sistema de distribuição associada à utilização de restrições de desigualdade para as potências ativas e reativas das cargas não monitoradas são as principais contribuições deste trabalho. / This work presents a new approach to the State Estimation problem in Electrical Distribution Networks using historical data loads and measurements obtained by Phasor Measurement Units (PMUs). In this formulation voltage magnitudes and angles are chosen as state variables and the problem is mathematically formulated as an optimization problem with equality and inequality constraints. The objective function is formed by the quadratic sum of weighted measurements residues, which are defined as the difference between the PMU measurements and the calculated values. The equality constraints are defined as the zero injections of active and reactive power at the no load buses. The inequality constraints are associated with active and reactive powers of non-monitored buses, bounded by a given limit, superior or inferior in relation to historical data loads (active and reactive powers). Case studies are performed using a simple 10-bus test system, and the 33 and 84 buses IEEE test systems. The data phasor measurements were obtained using a computer program that calculates power flow. The state estimation results using the proposed methodology were obtained through simulations in MATLAB environment and compared with the results of power flow program for validation. The use of synchronized phasor measurement at the beginning and at the end of the lateral feeders of the distribution system associated with the use of inequality constraints for active and reactive power for the non-monitored loads are the main contributions of this work.
217

Reconfiguração e alocação ótima de geração distribuída em sistemas de energia elétrica / Optimal reconfiguration and distributed generation allocation in electric power systems

Rosseti, Gustavo José Santiago 15 September 2011 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-09-12T12:17:41Z No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1406328 bytes, checksum: e250ced1df20ff9c96f2e06c95c77543 (MD5) / Approved for entry into archive by Diamantino Mayra (mayra.diamantino@ufjf.edu.br) on 2016-09-13T13:22:34Z (GMT) No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1406328 bytes, checksum: e250ced1df20ff9c96f2e06c95c77543 (MD5) / Made available in DSpace on 2016-09-13T13:22:34Z (GMT). No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1406328 bytes, checksum: e250ced1df20ff9c96f2e06c95c77543 (MD5) Previous issue date: 2011-09-15 / CNPq - Conselho Nacional de Desenvolvimento Científico e Tecnológico / Este trabalho apresenta uma metodologia para reconfiguração e alocação ótima de geração distribuída em redes elétricas de distribuição com o objetivo de minimizar as perdas técnicas de energia elétrica. A metodologia proposta é composta de dois algoritmos heurísticos passo a passo baseados em índices de sensibilidade, sendo um para a reconfiguração e o outro para a alocação de geração distribuída. O índice proposto para reconfiguração é baseado nos parâmetros operativos e o índice para alocação de geração distribuída baseia-se em uma estimativa dos multiplicadores de Lagrange, obtida a partir da solução do problema de fluxo de potência. O modelo proposto considera a variação da demanda do sistema através das curvas de carga e a opção de construir um novo circuito para conexão de um gerador distribuído a uma barra do sistema. Os algoritmos propostos são aplicados em sistemas da literatura, incluindo um sistema real de médio porte. / This work presents a methodology for optimal reconfiguration and optimal distributed generation allocation aiming to minimize technical energy losses in electric power distribution systems. The proposed methodology includes two step by step heuristic algorithms, based on sensitivity indexes, one for the reconfiguration and the other for the distributed generation allocation. The index proposed for reconfiguration is based on operating parameters and the index for distributed generation allocation uses the Lagrange multipliers obtained from the power flow solution. The proposed model considers the demand variation from the system load curves and the options to build a new branch for connecting a distributed generator to a bus of the network. The proposed algorithms are applied in systems of the literature, including a medium scale practical system.
218

Planejamento da geração distribuida com foco na confiabilidade

Botelho, Daniel Fioresi 31 August 2018 (has links)
Submitted by Geandra Rodrigues (geandrar@gmail.com) on 2018-10-16T12:46:06Z No. of bitstreams: 1 danielfioresibotelho.pdf: 2805489 bytes, checksum: 3d0b4a60f2a2f2cb7d26ea836254595a (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2018-10-16T14:35:42Z (GMT) No. of bitstreams: 1 danielfioresibotelho.pdf: 2805489 bytes, checksum: 3d0b4a60f2a2f2cb7d26ea836254595a (MD5) / Made available in DSpace on 2018-10-16T14:35:42Z (GMT). No. of bitstreams: 1 danielfioresibotelho.pdf: 2805489 bytes, checksum: 3d0b4a60f2a2f2cb7d26ea836254595a (MD5) Previous issue date: 2018-08-31 / O presente trabalho apresenta uma metodologia para a alocação de unidades de Geração Distribuída no Sistema de Distribuição de Energia Elétrica visando a melhoria dos indicadores de confiabilidade da rede. O objetivo é avaliar qual o melhor ponto do sistema para realizar a inserção da unidade GD. Realiza-se também a análise de como essa alocação afeta os indicadores de qualidade e as perdas elétricas do sistema em estudo. A inclusão de limite para um indicador de qualidade considerado na distribuição de energia elétrica é explorada neste trabalho, verificando que a inserção de geração distribuída na rede pode fazer com que tal restrição seja atendida. A metodologia proposta é baseada nas técnicas meta-heurísticas Sistema Imunológico Artificial e Algoritmo Genético afim de comparar os resultados obtidos por ambas as técnicas. A função objetivo avaliada é composta por um somatório dos custos de confiabilidade, custos de investimento em geração distribuída e os custos das perdas elétricas do sistema; buscando assim sempre minimizar estes custos. Os algoritmos propostos são testados em sistemas conhecidos da literatura. / The present work presents a methodology for the allocation of Distributed Generation units in the Electric Energy Distribution System aiming at the improvement of network reliability indicators. The objective is to evaluate the best point of the system to perform the insertion of the GD unit. An analysis of how this allocation affects the quality indicators and the electrical losses of the system under study is also carried out. The inclusion of a limit for a quality indicator considered in the distribution of electric energy is explored in this work, verifying that the insertion of distributed generation in the network can cause that such restriction is met. The proposed methodology is based on the metaheuristic techniques Artificial Immune System and Genetic Algorithm in order to compare the results obtained by both techniques. The objective function evaluated is composed of a sum of the costs of reliability, costs of investment in distributed generation and the costs of the electrical losses of the system; always seeking to minimize these costs. The proposed algorithms are tested in systems known in the literature.
219

Sistema de apoio à decisão para elaboração de projetos de redes aéreas de distribuição de energia elétrica / Decision support system to design electric power distribution networks projects

Almeida, Joselaine de, 1981- 10 January 2007 (has links)
Orientadores: Paulo Morelato França, Celso Cavelucci / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Elétrica e de Computação / Made available in DSpace on 2018-08-23T09:06:37Z (GMT). No. of bitstreams: 1 Almeida_Joselainede_M.pdf: 6148218 bytes, checksum: 1ef511889e4a35f380f54407917e0268 (MD5) Previous issue date: 2013 / Resumo: As concessionárias de energia elétrica devem projetar adequadamente as redes de distribuição, incluindo: definição da localização e capacidade dos transformadores; definição dos traçados de rede primária (15 kV) e de rede secundária (127/220V); e definição e instalação de elementos construtivos, tais como postes, estruturas primárias, estruturas secundárias, transformadores. Projetar estas redes é uma tarefa complexa e demorada que exige amplo conhecimento das normas técnicas e experiência por parte dos projetistas. Neste trabalho é proposto um Sistema de Apoio à Decisão (SAD) para projetos de redes aéreas de distribuição de energia elétrica, englobando as diversas etapas de especificação do projeto. Também é detalhado um sistema especialista para definição dos elementos construtivos (módulo de projeto de execução da rede). Os ganhos potenciais desta abordagem são avaliados em estudos de caso de diversos tipos de projetos. Os principais benefícios da utilização do SAD são: diminuição da dispersão das soluções de projeto; diminuição dos erros; soluções de menor custo e redução no tempo de elaboração dos projetos / Abstract: Electric power companies must design distribution networks, which is a task that includes: the determination of the capacity and position of distribution transformers; the routing of primary feeders (15 kV) and secondary distribution circuits (127/220V); and the selection and installation of constructive elements such as poles, primary structures, secondary structures, street transformers. The design of these networks is a complex and demanding task that requires a great knowledge about technical norms and experience from the network designers. This thesis presents a Decision Support System (DSS) to assist designers to elaborate the several steps of the distribution networks projects specification. An expert system that defines the constructive elements (Network Execution Project module) is also proposed. The advantages of this approach are evaluated through case studies based on different types of projects. The benefits of this DSS are the less variation of project solutions and the reduction of errors, solution costs and completion time / Mestrado / Automação / Mestra em Engenharia Elétrica
220

Técnicas para restabelecimento de sistemas de distribuição de energia elétrica / Algorithm for service restoration in distribuiton systems

Rosseti, Gustavo José Santiago 31 August 2015 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-01-19T10:31:58Z No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1281297 bytes, checksum: 0d547bba728df4c23bbf1317541f6e39 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-01-25T17:44:12Z (GMT) No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1281297 bytes, checksum: 0d547bba728df4c23bbf1317541f6e39 (MD5) / Made available in DSpace on 2016-01-25T17:44:12Z (GMT). No. of bitstreams: 1 gustavojosesantiagorosseti.pdf: 1281297 bytes, checksum: 0d547bba728df4c23bbf1317541f6e39 (MD5) Previous issue date: 2015-08-31 / Esta tese apresenta uma metodologia para maximizar o restabelecimento de cargas em sistema de distribuição de energia elétrica após à ocorrência de uma ou simultâneas contingências. Para tanto, um algoritmo heurístico construtivo é proposto, determinando passo a passo os procedimentos operativos a serem adotados. Aspectos associados com as restrições de radialidade e de tensão nas barras, minimização de manobras de chaves, consumidores prioritários e mínimo corte discreto de carga são considerados a fim de uma representação mais realista do problema. A metodologia é aplicada em sistemas tradicionais da literatura, incluindo um sistema real de médio porte. / This thesis presents a methodology for maximizing the load restoration in power distribution system after simultaneous occurrence of contingency. Therefore, a heuristic constructive algorithm is proposed to determine step by step the operation procedures to be adopted. Aspects associated with the radiality and bus voltage constraints, minimization of maneuvering switches, priority consumers and minimum discrete load shedding are considered to provide a more realistic representation of the problem. The proposed approach is applied in traditional systems from literature including a real medium size test system.

Page generated in 0.1359 seconds