• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 35
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 36
  • 36
  • 11
  • 10
  • 10
  • 9
  • 8
  • 7
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Modelo institucional do setor elétrico brasileiro: análise da capacidade de atração de capital privado para investimentos em geração de energia hidrelétrica. / Brazilian electric sector\'s institutional model: analysis towards the capacity to attract private capital to investments on hydroelectric power generation.

Fernando Luiz Aguiar Filho 24 May 2007 (has links)
Em março de 2004, o governo brasileiro aprovou as leis 10.847 e 10.848, que alteram as bases da regulação do Setor Elétrico Brasileiro. As leis instituíram novas regras para a outorga de concessões para aproveitamentos hidrelétricos e para comercialização de energia entre agentes de geração, distribuidores e comercializadores de energia elétrica. Diante da contínua demanda por investimentos na expansão da capacidade de geração, este trabalho foi desenvolvido com o objetivo de inferir sobre a capacidade do modelo institucional vigente de atrair capital privado para investimentos em geração de energia hidrelétrica. A inferência é realizada a partir da análise dos resultados dos leilões de energia nova realizados em 2005 e 2006 e da simulação do investimento em um protótipo de empreendimento de geração de energia hidrelétrica. De forma geral, as mudanças regulatórias favorecem o fluxo de investimentos para empreendimentos de geração hidrelétrica. Contudo, mais do que a um modelo institucional sólido, a derivação de investimentos para este segmento estará condicionada à ação do Estado sobre o equilíbrio entre consumo, oferta e preços de energia, enquanto principal artífice da política energética nacional. / In March 2004, the Brazilian Government passed the laws 10.847 and 10.848, which changed the regulatory guidelines of electric market. The laws established new rules for granting hydroelectric exploitation rights and for energy purchasing, among distributors, new generators and free consumers. In front of the new regulatory basis and the Brazilian demand for installed capacity increase, this research aims to infer the capacity of regulatory basis to attract private recourses for investments on hydroelectric power projects. The inference will be developed based on the results of auctions of electricity from new power plants, occurred in 2005 and 2006, and on the simulation of the investment on a prototype of a hydroelectric project in Brazil. The final remarks show that the new electric model favor the investment flow to hydroelectric power plants. However, more than to a solid institutional model, the investments on this segment will be conditioned to the Government action on the equilibrium between energy consuming, offering and prices, as the main agent of the national energy politics.
32

Perfil da geração hidrelétrica no Oeste e Sudoeste do Paraná / Profile of hydropower generation in the west and southwest of Paraná

Silva, Fabricio Ströher da 09 March 2018 (has links)
Submitted by Rosangela Silva (rosangela.silva3@unioeste.br) on 2018-06-25T23:12:30Z No. of bitstreams: 2 Fabricio_S_Silva.pdf: 2675376 bytes, checksum: 37796693d06d9e4b32f5991fd61d17d1 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2018-06-25T23:12:30Z (GMT). No. of bitstreams: 2 Fabricio_S_Silva.pdf: 2675376 bytes, checksum: 37796693d06d9e4b32f5991fd61d17d1 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2018-03-09 / Hydroelectric generation is the main source of electricity in Brazil and also in the West and Southwest of Paraná. Year after year the energy matrix has been diversifying, including new sources, such as wind power. However, due to the power accumulation characteristic of hydroelectric plants, this type of source is important for the stability of the electric system. Currently, hydroelectric power corresponds to just over 60% of all power installed in Brazil. Particularly in the West and Southwest of Paraná, this number increases and Paraná's share in the Brazilian matrix is approximately 16% of all installed power. In order to verify the participation of these regions in the hydropower matrix and also their production, a survey was made of the installed potential and the constructive profile of the hydroenergy projects. In addition, the flow and production trends of the Salto Santiago hydroelectric plant in the Iguaçu River basin and the Melissa hydroelectric plant in the Piquiri river basin were verified in the 2003 to 2017 period. Finally, a conceptual map of the western and southwestern regions of Paraná was elaborated with the hydroelectric generation profile. It was noticed by the survey that the regions of the study have great participation in the hydroelectric matrix of Brazil and that its production and the flow of the rivers in the entrance of these remains practically unchanged in the studied period. / A geração hidrelétrica é a principal fonte de energia elétrica no Brasil e do Oeste e Sudoeste do Paraná. Ano após ano a matriz energética vem se diversificando, sendo nela inseridas novas fontes, como por exemplo a eólica. Porém pela característica de acumulação de energia potência das hidrelétricas faz com que este tipo de fonte seja importante para a estabilidade do sistema elétrico. Nos dias atuais a energia hidrelétrica corresponde a pouco mais que 60% de toda potência instalada no Brasil. Em especial na região Oeste e Sudoeste do Paraná, este número aumenta e a participação do Paraná na matriz brasileira é de aproximadamente 16% de toda potência instalada. Para verificar como está a participação destas regiões na matriz hidroenergética e sua produção, foi realizado um levantamento do potencial instalado e do perfil construtivo dos empreendimentos hidroenergéticos. Além disto foi verificada a tendência das vazões e produção no período de 2003 a 2017 da hidrelétrica Salto Santiago na bacia do Rio Iguaçu e a hidrelétrica Melissa na bacia do rio Piquiri. Por fim, foi elaborado um mapa conceitual das regiões Oeste e Sudoeste do Paraná com o perfil da geração hidrelétrica. Concluiu-se pelo levantamento que as regiões do estudo têm grande participação na matriz hidrelétrica do Brasil e que sua produção e a vazão dos rios na entrada destas permanece praticamente inalterada no período do estudado.
33

Aproveitamento da energia vertida turbinavel da UHE Itaipu para uso em onibus a hidrogenio : estudo de caso em Foz do Iguaçu / Itaipu hidroelectric power plant turbinable energy use in hydrogen buses : case study in Foz do Iguaçu city

Riveros Godoy, Gustavo Arturo 15 February 2008 (has links)
Orientadores: Carla Kazue Nakao Carvaliero, Ennio Perez da Silva / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-08-11T17:18:19Z (GMT). No. of bitstreams: 1 RiverosGodoy_GustavoArturo_M.pdf: 1958873 bytes, checksum: a878f1e88cb7143ed2a2f36d5b16b3d0 (MD5) Previous issue date: 2008 / Resumo: Diante do atual panorama energético e ambiental, a sociedade busca reduzir os impactos ambientais decorrentes principalmente do uso de combustíveis fósseis. Para o setor de transportes, uma das soluções alternativas é o estímulo ao transporte coletivo baseado em tecnologias limpas, como por exemplo o uso de células a combustível. Neste trabalho optou-se por analisar uma alternativa de aproveitamento da denominada Energia Vertida Turbinável da Usina Hidrelétrica Itaipu, através da produção de hidrogênio e utilização no setor de transportes. Para tanto, foi realizado um estudo de caso da substituição da atual frota de ônibus a Diesel do setor de transporte coletivo urbano da cidade de Foz do Iguaçu, por ônibus com células a combustível alimentada com hidrogênio eletrolítico. Foram propostos e analisados quatro modelos de produção e abastecimento para o hidrogênio: um modelo descentralizado e três variantes do modelo centralizado e, com base em considerações econômicas, logísticas e ambientais, considerou-se o modelo de produção e abastecimento centralizado como o mais adequado. Este modelo foi tomado como referência para estimar o custo e o preço final do hidrogênio produzido e vendido pela Usina Hidrelétrica Itaipu para o setor de transportes da cidade de Foz do Iguaçu, indicando um novo mercado para as empresas geradoras de energia elétrica. Como resultado, obteve-se um custo de produção do hidrogênio de US$ 2,86/kg e verificou-se, através da análise de sensibilidade do preço do hidrogênio, que o custo do sistema de eletrólise é o fator que exerce maior influência no preço final, enquanto que a comercialização de créditos de carbono é o fator de menor influência, nas condições específicas deste estudo / Abstract: Facing today's energy crisis and the resulting environmental situation, society is searching to reduce those environmental impacts resulting principally from intensive use of fossil fuels. For the transport sector, one of these alternative solutions is to encourage collective transport based on clean technology, like fuel cell use. In this work an alternative use is being analyzed for the so-called Spilled Turbinable Energy of the ITAIPU Hydroelectric Power Plant, in order to hydrogen production for transport sector. The substitution of the current urban collective Diesel bus fleet with fuel cell buses in Foz do Iguaçu city was used as a case study. Four hydrogen production and supply models were proposed and analyzed: a decentralized model and three centralized models. Economical, logistical and environmental considerations showed the centralized production-supply plant as the most appropriated and this one has been used to estimate the cost and price of hydrogen produced and sold by ITAIPU Hydroelectric Power Plant for the transport sector of Foz do Iguaçu city, exploring new market possibilities for electricity generators. The hydrogen production cost obtained was US$ 2,86/kg and the price analysis of the hydrogen showed that the electrolyzer system cost has the most impact and the carbon credits represents the least impact on these study conditions / Mestrado / Mestre em Planejamento de Sistemas Energéticos
34

Relações de poder na hidreletricidade = a instalação da UHE Foz do Chapecó na bacia do rio Uruguai / Power relations in hydroelectricity : the installation HEP Foz do Chapecó in the Uruguay river basin

Rocha, Humberto José da, 1976- 05 February 2012 (has links)
Orientador: Emília Pietrafesa de Godoi / Tese (doutorado) - Universidade Estadual de Campinas, Instituto de Filosofia e Ciências Humanas / Made available in DSpace on 2018-08-20T08:57:21Z (GMT). No. of bitstreams: 1 Rocha_HumbertoJoseda_D.pdf: 6518138 bytes, checksum: 73f7ff5f435d88d4e661b1f8a57b3f9f (MD5) Previous issue date: 2012 / Resumo: A energia elétrica está na base do estilo de vida da sociedade atual assumindo papel estratégico nos projetos de desenvolvimento econômico. No Brasil a hidreletricidade é a forma consagrada para a geração de energia elétrica, respondendo por mais de 70% da capacidade de operação. A importância da energia hidrelétrica contrasta com impactos ambientais e sociais que mesmo relativizados em relação a outras fontes de energia como a nuclear ou termelétrica, comprovadamente afetam a vida das comunidades locais e do meio ambiente no sentido amplo. A instalação de cada nova Usina Hidrelétrica de Energia (UHE) acontece através de relações de poder entre agentes sociais com diferentes interesses de acordo com o caso específico, mas, de maneira geral, segundo um processo social amplo que no Brasil ultrapassa um século. Da multiplicidade de agentes e situações, partimos da tese de que a assimetria dessas relações de poder em favor dos empreendedores tende a apontar para a inevitabilidade da instalação dessas obras alheiamente ao posicionamento da população local. O estudo analisa o processo de instalação da UHE Foz do Chapecó, situada no rio Uruguai, entre os municípios de Alpestre (RS) e Águas de Chapecó (SC), este abrigando o canteiro de obras localizado na comunidade de Saltinho do Uruguai, locus empírico da pesquisa que desenvolvemos entre os anos de 2006 e 2011. Considerando o caso segundo um processo social amplo, discutimos a instalação da hidrelétrica sob a luz do conflito entre dois projetos políticos antagônicos, o neoliberal, conduzido pelo empreendedor, e o democrático-participativo, representado principalmente pelo Movimento dos Atingidos por Barragens (MAB). Nesta perspectiva, analisamos uma rede social relacionando diferentes agentes compreendendo desde instituições transnacionais até ribeirinhos que poucas vezes em suas vidas se afastaram da barranca do rio. Esta rede compreende um campo social transpassado por aspectos políticos, jurídicos, econômicos e ambientais, a partir do que se estabelecem os conflitos e alianças entre os múltiplos agentes sociais com interesses variados, onde cada agente utiliza estratégias tendo em vista um ambiente democrático marcado pela tensão entre legalidade e legitimidade, onde o resultado significa a instalação - ou não - de uma hidrelétrica / Abstract: Electrical energy is the basis of the lifestyle of today's society assuming a strategic role in economic development projects. Hydroelectricity in Brazil is the established way to generate electricity, accounting for more than 70% of operating capacity. The importance of hydropower contrasts with environmental and social impacts that even relativized in relation to other energy sources such as nuclear power plant or demonstrably affect the lives of local communities and the environment in the broad sense. The installation of each new Hydroelectric Power (HEP) happens through the power relations between social actors with different interests according to the specific case, but, in general, according to a broad social process that goes beyond a century in Brazil. The multiplicity of actors and situations, we start with the thesis that the asymmetry of these relations of power in favor of entrepreneurs tends to point to the inevitability of the installation of these works unrelated the positioning of the local population. The study analyzes the process of installing the HEP Foz do Chapecó, located on the Uruguay river between the towns of Alpestre (RS) and Águas de Chapecó (SC), this housing the construction site located in the community Saltinho do Uruguai, empirical locus the research that developed between the years 2006 and 2011. Considering the case in a broad social process, we discuss the installation of the dam in light of the conflict between two antagonistic political projects, the neoliberal, led by the entrepreneur, and democratic participation, represented mainly by the Movement of People Affected by Dams (MAB). In this perspective, we analyze a social network connecting different agents including from transnational institutions to riparian few times in their lives away from the riverbank. This network comprises a pierced by the social political, legal, economic and environmental, from settling the conflicts and alliances between multiple social agents with varied interests, where each agent uses strategies aimed at a democratic environment characterized by tension between legality and legitimacy, where the result means the installation - or not - of a hydroelectric / Doutorado / Ciencias Sociais / Doutor em Ciências Sociais
35

Conflito e cooperação na Bacia do Prata em relação aos cursos d'água internacionais (de 1966 a 1992)

Yahn Filho, Armando Gallo [UNESP] 24 May 2005 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:26:45Z (GMT). No. of bitstreams: 0 Previous issue date: 2005-05-24Bitstream added on 2014-06-13T18:30:29Z : No. of bitstreams: 1 yahnfilho_ag_me_mar.pdf: 1098522 bytes, checksum: cc35139cfe47067c82c3d101a3d160fa (MD5) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Este trabalho tem por objetivo fazer uma análise das relações internacionais na Bacia do Prata, no que tange ao seu aproveitamento hídrico, com foco na geração de energia e na navegação fluvial, haja vista o caráter duplamente conflitivo destes dois usos dþágua. No plano físico, as barragens se tornam um empecilho à navegação e, na esfera política, a prioridade que cada país dá a um destes usos está condicionada ao seu grau de desenvolvimento econômico ou à sua situação geográfica. Se, por um lado, as relações hostis entre Brasil e Argentina, decorrentes da incompatibilização de seus projetos de aproveitamento hidrelétrico do Rio Paraná, duarante as décadas de 1960 e 1970, caracterizam uma fase predominantemente realista na Bacia do Prata, por outro, o projeto da Hidrovia Paraguai-Paraná, iniciado nos anos 1980 e concretizado na década seguinte, representa a afirmação de uma tendência multilateralista das relações internacionais na região, fundamentada na teoria da interdependência complexa. / The purpose of this work is to analyze the Plata Basin international relations, as to water use, focusing on energy generation and fluvial navigation, taking into account double conflicting feature of these two water uses. At physical level, dams impair navigation and, at political level, priority assigned by each country to one of these uses is conditioned by its economic development degree or geographical location. If, on one hand, hostile relationships between Brazil and Argentina, arising from their projects of Paraná River hydroelectric use incompatibility, during the 1960s and 1970s, feature a mainly realistic phase in Plata Basin, on the other hand, Paraguay-Paraná Waterway, started in the 1980s and achieved in the following decade, represents a multilateral trend strengthening to international relations, based on complex interdependence theory.
36

A proteção do meio ambiente sobre a perspectiva das fontes alternativas de energia

Riquelme, Daniela Maria 03 December 2008 (has links)
Made available in DSpace on 2016-04-26T20:28:20Z (GMT). No. of bitstreams: 1 Daniela Maria Riquelme.pdf: 3664410 bytes, checksum: f671a6b4378f17885fbd022301cd8f41 (MD5) Previous issue date: 2008-12-03 / This present work has the intention to present the environment as a diffuse good belonging to an undetermined plurality of subjects, which are undividable in relation to its holders and their protection is responsibility of Public Power and also the collectivity. Therefore, when we deal with sustainable energy consumption, which is in the present case the alternative energy sources, we are preserving the current environment for us and for the future generations, respecting ourselves as citizens and the legal norms / A presente dissertação pretende demonstrar que o meio ambiente é um bem difuso pertencente a uma pluralidade indeterminada de sujeitos, indivisíveis em relação aos seus titulares e cuja defesa incumbe tanto ao Poder Público quanto a coletividade. Desta forma, quando nos preocupamos com o consumo consciente da energia, no caso presente das fontes alternativas de energia, estamos cuidando do meio em que vivemos, tanto para nós quanto para as futuras gerações respeitando, assim, nós mesmos como cidadãos e, as normas legais

Page generated in 0.0447 seconds