• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 35
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 36
  • 36
  • 11
  • 10
  • 10
  • 9
  • 8
  • 7
  • 6
  • 6
  • 5
  • 5
  • 5
  • 5
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Modelo de despacho otimo com tratamento individual de unidade geradoras em usinas hidreletricas / Optimal dispach model with indivual

Colnago, Glauber Renato 02 February 2007 (has links)
Orientador: Paulo de Barros Correia / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-08-09T13:14:43Z (GMT). No. of bitstreams: 1 Colnago_GlauberRenato_M.pdf: 2199430 bytes, checksum: a29163d68691a2b1bec8be6c8bf1d470 (MD5) Previous issue date: 2007 / Resumo: Os modelos de despacho ótimo atuais em usinas hidrelétricas (UHEs) são realizados tendo em conta as eficiências das unidades geradoras (UGs) obtidos com a extrapolação dos dados de um modelo em escala reduzida das turbinas. Uma extrapolação dos dados do modelo para o protótipo realizada com grande precisão poderia ser feita se houvesse semelhança dinâmica, geométrica e cinemática entre eles. Como isto é impossível, os fabricantes de turbinas possuem relações empíricas para corrigir as eficiências medidas no modelo para refletirem melhor o desempenho do protótipo. Apesar desta correção, o desempenho real das turbinas pode ser afetado por características construtivas ou operacionais das UHEs, não levadas em conta pelos fabricantes, e pode variar com o tempo de uso de uma forma diferente para cada UG de uma UHE. Logo, as eficiências das turbinas reais não são iguais às eficiências extrapoladas do modelo em escala reduzida e, sob esta ótica, um modelo de despacho realizado com as curvas de eficiência derivadas do modelo reduzido provavelmente não otimiza a eficiência de uma UHE. Pode-se obter dados de eficiência mais precisos (atualizados) das UGs instaladas com o auxílio de métodos de medição de vazão da água nos condutos forçados das UGs. Neste trabalho foi desenvolvido um modelo de despacho ótimo em UGs de UHEs que trata individualmente as UGs, pois as mesmas possuem, provavelmente, curvas diferentes quando se trata dos dados atualizados. A formulação matemática do modelo de despacho ótimo proposto é não linear inteiro misto e não convexo e foi utilizado o programa Lingo 8.0 para sua resolução, com buscas global e local. Os melhores resultados foram obtidos com a busca global. Foi realizado o despacho com os dois tipos de dados, os derivados do modelo reduzido e os atualizados de uma UHE real. Na simulação com dados atualizados chegou-se a ganhos entre 0,34% até 0,99% na operação da UHE, em comparação com a simulação com os dados derivados do modelo reduzido. Estas quantias significam, em valores monetários, entre R$ 700 mil e R$ 2 milhões anuais (para R$ 50/MWh). Os custos para a obtenção dos dados atualizados no caso em estudo foi quase nulo, no entanto, mesmo que utilizados métodosmais precisos para medição de vazão, que possuem um custo associado, este trabalho indica uma relação baixo custo e alto benefício para a utilização dos dados atualizados obtendo-se o retorno em poucos meses do capital investido / Abstract: Currently used models for optimal dispatch in hydro plants (HP) are based on generation units (GU) efficiency extrapolated from the reduced scale turbine data. An extrapolation from the reduced model data to obtaining real prototype data with excellent precision could occur only if dynamical, geometrical and kinematical similarity between prototype and reduced model would exist. As this is impossible, turbine manufacturers use empirical relations to correct model efficiency in order to reflect in a better way the prototype efficiency. Despite this correction, the turbines¿ real performance can be affected by HPs¿ constructive and operational characteristics, not taken into account by manufacturers; therefore, the real turbine efficiency in a specific GU is not similar to the one obtained from the reduced model by means of extrapolation. Considering this, optimal dispatch using extrapolated reduced model¿s efficiency data will probably not optimize the HP¿s efficiency. More exact efficiency data from the installed GU¿s can be obtained by means of water discharge measurements in penstocks. There was developed a dispatch model in GUs of HPs that treat GUs individually because, probably, their efficiency curves are different. The proposed dispatch model is a mixed integer nonlinear mathematical formulation. The software used to solve the problem was Lingo 8.0, with global and local searchs. Better results were obtained when using global search. This work presents a simulation of optimal dispatch using both kind of data: the extrapolated from the reduced model, and the more detailed data. The simulation that uses the more detailed data from a real HP permitted a gain between 0.34 and 0.99% compared to the one that uses reduced scale model data. These amounts, converted to monetary values, represent between R$700 thousand and R$2 million per year (for a tariff of 50 R$/MWh). The costs for obtaining the more detailed data used in this work are almost null. This work shows the introduction of more precise measurement techniques in GUs implies investments that can rapidly returned. / Mestrado / Mestre em Planejamento de Sistemas Energéticos
22

Despacho economico em usinas hidreletricas

Provençano, Felipe 03 August 2018 (has links)
Orientador : Takaaki Ohishi / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Eletrica e de Computação / Made available in DSpace on 2018-08-03T18:01:31Z (GMT). No. of bitstreams: 1 Provencano_Felipe_M.pdf: 8012561 bytes, checksum: 190c8af2fdbeb0b64b480b7c827d0d82 (MD5) Previous issue date: 2003 / Resumo: A finalidade desta tese de mestrado é enriquecer o conhecimento sobre modelos de otimização em sistemas hidrelétricos. Sua proposta é estudar os problemas de Despacho Ótimo e Pré-Despacho, abordando-os a partir de representações individualizadas de cada par turbina/gerador presente no conjunto de usinas em consideração. A primeira etapa deste estudo constituiu-se no levantamento das relações entre as variáveis operacionais dos pares turbina/gerador para que, a partir destas, pudessem ser formulados os modelos matemáticos de otimização necessários à resolução dos dois problemas propostos. O trabalho posterior foi modelar propriamente os dois problemas através de duas perspectivas: A primeira enxergou o sistema nas vazões turbinadas , cabendo ao modelo programar a minimização do montante de água consumido. A segunda foi direcionada para a minimização de perdas de potência, intrínsecas a cada ponto de operação. Nesta etapa incorporou-se uma série de considerações analíticas e metodológicas surgi das ao longo da elaboração dos modelos. A hipótese fundamental deste estudo é a equivalência entre as duas perspectivas, o que permitiria a adoção preferencial da segunda pois embora não seja a mais intuitiva, possibilita um arranjo matemático mais simples, tornando-a incomparavelmente mais ágil na obtenção de resultados / Abstract: This work' s main proposal is to increase the knowledge about mathematical models on hydro-plants optimizations. It is based on the economic dispatch and predispatch models, according to a new approach that inc1udes a representation of each turbine/generator set. The first part treats the relationship between the turbine generators' operation variables, in order to provide a mathematical model. Based on this first result, two predispatch approaches are proposed, in which the first one is formulated in terms of hydraulic variables, and the second one is formulated in terms of active power. The first model minimizes the total water consumption, and the second one minimizes the total losses. The fundamental hypothesis of this study is the equivalency between the two approaches / Mestrado / Mestre em Engenharia Elétrica
23

Metodologia para estimativa do pagamento por serviços ecossistêmicos do transporte de umidade amazônica para geração de energia hidrelétrica no Brasil

Ana Luiza Ximenes Neves Costa 04 August 2011 (has links)
A interação cíclica da floresta amazônica com altos índices de precipitação, providos por massas úmidas originadas no oceano Atlântico, contribui para a manutenção de um estoque úmido sobre a região, parcela do qual é constantemente transportada para a região Sul do país pelos Jatos de Baixo Nível (JBN). Esta parcela de umidade precipita sobre boa parte da região Sul, sendo indiretamente aproveitada em diversas atividades humanas; trata-se de um benefício indireto de um dos serviços ecossistêmicos da conservação da floresta amazônica. Esse trabalho apresenta um modelo de valoração do serviço ecossistêmico provido pelo transporte de umidade dos JBN, a partir de: i) previsões de vazões obtidas pela ferramenta ArcCN-Runoff; ii) dados de produtibilidade de energia de usinas hidrelétricas na região beneficiária; e iii) estimativas de custo de oportunidade da geração das usinas estudadas. Os resultados apontam que cerca de 4% da geração hidrelétrica da região Sul está associada à umidade oriunda dos JBN, com maior impacto na primavera, quando mais de 8,5% da energia hidrelétrica provém desta origem. Os resultados apontam ainda valores agregados da ordem de R$ 70 milhões para os serviços ecossistêmicos apropriados pela cadeia de valor da energia elétrica, associados à conservação da floresta amazônica e do transporte da umidade pelos JBN.
24

Modelo institucional do setor elétrico brasileiro: análise da capacidade de atração de capital privado para investimentos em geração de energia hidrelétrica. / Brazilian electric sector\'s institutional model: analysis towards the capacity to attract private capital to investments on hydroelectric power generation.

Aguiar Filho, Fernando Luiz 24 May 2007 (has links)
Em março de 2004, o governo brasileiro aprovou as leis 10.847 e 10.848, que alteram as bases da regulação do Setor Elétrico Brasileiro. As leis instituíram novas regras para a outorga de concessões para aproveitamentos hidrelétricos e para comercialização de energia entre agentes de geração, distribuidores e comercializadores de energia elétrica. Diante da contínua demanda por investimentos na expansão da capacidade de geração, este trabalho foi desenvolvido com o objetivo de inferir sobre a capacidade do modelo institucional vigente de atrair capital privado para investimentos em geração de energia hidrelétrica. A inferência é realizada a partir da análise dos resultados dos leilões de energia nova realizados em 2005 e 2006 e da simulação do investimento em um protótipo de empreendimento de geração de energia hidrelétrica. De forma geral, as mudanças regulatórias favorecem o fluxo de investimentos para empreendimentos de geração hidrelétrica. Contudo, mais do que a um modelo institucional sólido, a derivação de investimentos para este segmento estará condicionada à ação do Estado sobre o equilíbrio entre consumo, oferta e preços de energia, enquanto principal artífice da política energética nacional. / In March 2004, the Brazilian Government passed the laws 10.847 and 10.848, which changed the regulatory guidelines of electric market. The laws established new rules for granting hydroelectric exploitation rights and for energy purchasing, among distributors, new generators and free consumers. In front of the new regulatory basis and the Brazilian demand for installed capacity increase, this research aims to infer the capacity of regulatory basis to attract private recourses for investments on hydroelectric power projects. The inference will be developed based on the results of auctions of electricity from new power plants, occurred in 2005 and 2006, and on the simulation of the investment on a prototype of a hydroelectric project in Brazil. The final remarks show that the new electric model favor the investment flow to hydroelectric power plants. However, more than to a solid institutional model, the investments on this segment will be conditioned to the Government action on the equilibrium between energy consuming, offering and prices, as the main agent of the national energy politics.
25

Elaboração de uma metodologia para análise de viabilidade técnica e econômica para implantação de usinas hidrelétricas com aproveitamentos de baixa queda /

Rodrigues, Anderson Camisotti. January 2014 (has links)
Orientador: Luiz Roberto Carrocci / Coorientador: José Antonio Perrella Balestieri / Banca: Eliana Vieira Canettieri / Banca: Daniela Helena Pelegrine / Resumo : Neste trabalho, é apresentada uma metodologia que permite avaliar a viabilidade técnica e econômica de empreendimentos de geração de energia com base em aproveitamentos hídricos ditos de baixa queda. A metodologia ora apresentada é também desenvolvida em formato de ferramenta computacional e tem por objetivo principal abordar os diversos aspectos relevantes neste processo de avaliação, que seja de fácil aplicação, rápida e automatizada e traga uma visão ampla das possibilidades de soluções para determinado estudo de caso. A dissertação aborda um assunto de amplo interesse para o atual mercado de geração de energia, pois é sabido que existe uma tendência de que cada vez mais exista a necessidade de explorar este tipo de aproveitamento hídrico, principalmente na região norte brasileira / Abstract: In this work, it is presented a methodology for assessing the technical and economical feasibility study of low head hydropower generation projects. The presented methodology is also developed in a computational tool way and has as a main goal to approach the various relevant aspects in this evaluation process, to be easy for use, fast and automated and bring a broad vision of the possibilities for solutions to a particular case study. The dissertation approaches a subject of broad interest to the current power generation market, because it is known that more and more there is a trend that this kind of water resources needs to be exploited, mainly in the northern Brazilian region / Mestre
26

Conflitos no uso das águas transfronteiriças: o caso da Itaipu Binacional / Conflicts in the use of cross-border waters: the case of binational Itaipu

Inacio Junior, Paulo 30 October 2018 (has links)
Esta dissertação tem o objetivo de examinar o comportamento do estado brasileiro diante das manifestações de insatisfação do Paraguai com o Tratado de Itaipu que reivindicou renegociações sobre o uso da água e a distribuição da geração elétrica. Elas resultaram em revisões de partes do Tratado ao longo da década de 2000. O subsistema platino está dividido em dois tempos, o primeiro de ocupação da fronteira, no período da construção da usina em que a ordem regional rivalizava com a Argentina, e o segundo a partir da década de 2000, quando se consolida uma nova ordem regional voltada à integração. A Itaipu Binacional usa as águas transfronteiriças da bacia onde os dois Estados fazem fronteira e sua existência depende do alinhamento de interesses entre os Estados ribeirinhos no projeto binacional. Isto demonstrou a superação da função de separação política, no entanto tornou mais evidente as desigualdades entre as Partes. As assimetrias no uso das águas transfronteiriças revelam relações de poder entre os Estados ribeirinhos e sugere a existência de agente hidro-hegemônico. No diálogo entre Geografia Política, Geopolítica e Relações Internacionais, defende-se a ideia de que o uso compartilhado da água transfronteiriça impõe uma realidade de interdependente que adapta o comportamento dos Estados, a distribuição de poder e as suas fontes, mas, mesmo assim, mantém a racionalidade estratégica autointeressada. Para viabilizar a investigação foram analisados documentos elaborados pelo Itamaraty e pela Itaipu Binacional, além de fontes secundárias. / This dissertation aims to examine the behavior of the Brazilian state in face of the manifestations of dissatisfaction of Paraguay with the Treaty of Itaipu that demanded renegotiations on the use of water and the distribution of electricity generation. They resulted in revisions of parts of the Treaty throughout the 2000s. The Platinum subsystem is divided into two periods, the first to occupy the frontier, during the construction of the plant in which the regional order rivaled Argentina, and the second from the 2000s, when a new regional order for integration was consolidated. Itaipu Binacional uses the transboundary waters of the basin where the two States border and their existence depends on the alignment of interests among the riparian states in the binational project. This has demonstrated the overcoming of the political separation function, but has made more evident the inequalities between the Parties. Asymmetries in the use of transboundary waters reveal power relations among riparian states and suggests the existence of a hydrohegemonic agent. In the dialogue between Political Geography, Geopolitics and International Relations, the idea is defended that the shared use of transboundary water imposes an interdependent reality that adapts the behavior of States, the distribution of power and its sources, maintains the self-interested strategic rationality. In order to facilitate the investigation, documents prepared by Itamaraty and Itaipu Binacional were analyzed, as well as secondary sources.
27

Produzir energia, (pro) mover o progresso: o Complexo Hidrelétrico Urubupungá e os caminhos do setor energético / Producing energy, (pro)moving the progress: the Urubupungá Hydroelectric Complex and the ways of the energetic sector

Martin, Andrey Minin [UNESP] 24 May 2016 (has links)
Submitted by ANDREY MININ MARTIN null (andrey_mm@hotmail.com) on 2016-07-05T15:09:13Z No. of bitstreams: 1 Tese Andrey Martin_UNESP 2016.pdf: 5746818 bytes, checksum: 15e4affba34a9ac0ee840e4d35b09583 (MD5) / Approved for entry into archive by Ana Paula Grisoto (grisotoana@reitoria.unesp.br) on 2016-07-07T19:50:56Z (GMT) No. of bitstreams: 1 martin_am_dr_assis.pdf: 5746818 bytes, checksum: 15e4affba34a9ac0ee840e4d35b09583 (MD5) / Made available in DSpace on 2016-07-07T19:50:56Z (GMT). No. of bitstreams: 1 martin_am_dr_assis.pdf: 5746818 bytes, checksum: 15e4affba34a9ac0ee840e4d35b09583 (MD5) Previous issue date: 2016-05-24 / Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP) / Objetiva-se neste trabalho analisar o Complexo Hidrelétrico Urubupungá, localizado na região fronteiriça entre os estados de São Paulo e Mato Grosso do Sul, constituído por duas hidrelétricas, a Usina Hidrelétrica Engenheiro Souza Dias (Jupiá) e a Usina Hidrelétrica Ilha Solteira. Planejado e executado entre as décadas de 1950 e meados da década de 1970, este empreendimento consolida-se por meio da criação da Comissão Interestadual da Bacia do Paraná-Uruguai, a CIBPU, projeto de planejamento regional articulado por sete estados nacionais, tendo como influência as experiências norte-americanas do Tennessee Valley Authority, TVA. Com o início das obras, a condução do empreendimento centraliza cada vez mais novos organismos, como as Centrais Elétricas de Urubupungá, CELUSA S/A e a partir de 1966 as Centrais Elétricas de São Paulo, CESP, atualmente denominada Companhia Energética de São Paulo. Tais transformações projetam novos interesses de determinados grupos e espaços com as potencialidades advindas da produção energética, ampliando diretamente a forma de se pensar como a constituição deste complexo atrela-se a determinados projetos políticos, econômicos e sociais para uma vasta região do país. Para tal análise, permeado por um debate teórico-metodológico entre progresso, desenvolvimento, história e memória, ligados a um corpo documental amplo, de documentos de comissões e empresas, periódicos de circulação nacional e aparatos audiovisuais, apresentamos como uma série de narrativas se engendraram na execução e no estabelecimento do empreendimento, articulando seu ideário de progresso e uma nova imagem para região, antes, durante e posteriormente a sua realização. Desta forma, interesses privados, disputas pela legitimidade, pelo poder e, assim, memórias foram gestadas ao longo deste período e marcaram a construção do complexo hidrelétrico até seu término na década de 1970, estabelecendo ligações com marcos de memória do passado e deixando desdobramentos para o futuro. / This work aims to analyze the Urubupungá Hydroelectric Complex, located in the border region between the States of São Paulo e Mato Grosso do Sul, it is consisted by two hydroelectric plants, the Engenheiro Souza Dias Hydroelectric Plant (Jupiá), and the Ilha Solteira Hydroelectric Plant. Planned and executed between the decade of 1950 and mid of 1970, this enterprise consolidated itself through the creation of an Interstate Committee of the Paraná-Uruguai basin, that was called CIBPU, and was a regional planning project articulated by seven national States, under the influence the North-American experiences of the Tennessee Valley Authority, TVA.With the beginning of the works, the enterprise focuses more and more on the new organisms, such as Urubupungá Electrics Centrals, CELUSA S/A, and from 1966, The São Paulo Electrics Centrals, CESP, currently named as Energetic Company of São Paulo. These transformations design new interests of certain groups and spaces to the arising potential from the energy production, directly widening the way of thinking about how the complex creation is connected to certain political, economic, and social projects to a wide area of the country. For this analysis, permeated by a theoreticalmethodological debate about progress, development, history and memory linked to an extensive documental source of commissions and companies documents, national periodicals, audio-visual apparatus, it was presented how a series of narratives were engendered in the enterprise implementation and establishment, articulating its ideals of progress and a new image for the region, before, during, and after its completion. In this way, private interests, disputes for the legitimacy and power, and so, memories were made throughout this period and marked the Hydroelectric Complex construction until its completion in early 1970, establishing connections with landmarks of memory from the past and developments for the future. / FAPESP: 2012/16777-1
28

Análise técnica e econômica de retificadores de corrente para produção de hidrogênio eletrolítico = estudo de caso aproveitando a EVT da UHE de Itaipu / Technical and economical analysis of power rectifiers for electrolytic hydrogen production : case study considering the spilled turbinable energy of Itaipu Hydroelectric Power Plant

Gambetta, Francielle 17 August 2018 (has links)
Orientador: Ennio Peres da Silva / Dissertação ( mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Química / Made available in DSpace on 2018-08-17T04:55:49Z (GMT). No. of bitstreams: 1 Gambetta_Francielle_M.pdf: 4780185 bytes, checksum: f2071d96fca67109088a5766792577eb (MD5) Previous issue date: 2010 / Resumo: Para países com disponibilidade de energia elétrica relativamente barata, como o Brasil, o custo de instalação é o fator mais importante para a produção de hidrogênio eletrolítico, representando mais de 50% do custo total. O retificador de corrente é um dos principais equipamentos que compõem um sistema de eletrólise da água e é objeto de estudo desta dissertação. A partir de uma análise técnica, concluiu-se que, atualmente, o sistema de retificação mais adequado ao processo de produção de hidrogênio eletrolítico é o sistema a tiristor, principalmente por apresentar maior eficiência e confiabilidade operacional. Por meio de uma análise de mercado, concluiu-se que o mercado nacional, em sua maioria, está apto a fornecer retificadores industriais apenas para aplicação em eletrolisadores unipolares, já o mercado internacional possui uma vasta gama de retificadores com diversos níveis de tensão e corrente de saída, sendo capaz de fornecer estes equipamentos tanto para alimentar eletrolisadores industriais unipolares quanto bipolares. O custo do hidrogênio foi calculado tomando como base estudos anteriores e utilizando a Energia Vertida Turbinável (EVT) da UHE de Itaipu, o que resultou em US$ 2,66/kg para uma planta com capacidade de produzir 4.365 m3/h de hidrogênio. A influência do custo do retificador sobre o custo de produção é de 10,8% e, assim, uma diminuição de 50% no custo deste equipamento promoveria uma redução de 5,4% no custo do hidrogênio eletrolítico. Apesar de pequena, esta redução pode ser determinante em muitos casos. Assim, a introdução de uma linha de pesquisa em um pólo tecnológico para o desenvolvimento destes equipamentos é interessante, pois além de contribuir com a redução do custo do hidrogênio eletrolítico, representa uma oportunidade de crescimento econômico que pode colocar o Brasil em destaque de forma positiva dentro dos cenários energético e econômico mundiais / Abstract: For countries with relatively cheap electricity availability, such as Brazil, the cost of installation is the most important factor for the production of electrolytic hydrogen, representing more than 50% of the total. The power rectifier is one of the main devices comprising the water electrolysis system and it is the object of study in this dissertation. From a technical analysis, it was concluded that currently the most suitable system for electrolytic hydrogen production is the thyristor system, mainly due to its higher efficiency and operational reliability. Through market analysis, it was concluded that most of rectifiers available in the domestic market are designed only for use in industrial unipolar electrolysers. On the other hand, the international market has a wide range of rectifiers with different levels of voltage and current output, being capable of providing such equipment for both industrial unipolar and bipolar electrolysers. The cost of hydrogen was calculated using previous studies of the Spilled Turbinable Energy (STE) of Itaipu Hydroelectric Energy Plant, and resulted in US$ 2.66/kg for a plant with capacity to produce 4,365 m3/h of hydrogen. The influence of the rectifier cost on the gas production cost is 10.8%, and thus a decrease of 50% in the cost of such equipment would promote a reduction of 5.4% in the cost of the electrolytic hydrogen. Although small, this reduction can be decisive in many cases. Thus the introduction of a research line at a technological center for the development of this equipment is interesting, which also contributes to lowering the cost of electrolytic hydrogen and is an opportunity for economic growth to highlight Brazil in the worldwide energy and economic scenery / Mestrado / Mestre em Planejamento de Sistemas Energéticos
29

Avaliação da aplicabilidade da teoria da gestão da cadeia de suprimentos no setor eletrico / Supply chain management, energy planning, electricity energy restructuring

Leal, Lydiane Abdon 28 July 2005 (has links)
Orientador: Paulo Sergio Franco Barbosa / Tese (doutorado) - Universidade Estadual de Campinas, Faculdade de Engenharia Mecanica / Made available in DSpace on 2018-08-06T12:45:30Z (GMT). No. of bitstreams: 1 Leal_LydianeAbdon_D.pdf: 3076127 bytes, checksum: 6c066308941582d2a02f33339ba32a55 (MD5) Previous issue date: 2005 / Resumo: As relações institucionais e processos decisórios ao longo da cadeia de suprimentos do setor elétrico brasileiro sofreram grandes mudanças durante o processo de reforma, exigindo que a reestruturação da mesma seja adequada às novas exigências de um ambiente misto (estatal e privado) com forças de mercado, presença de empresas estatais e atuação de órgão regulador. Um dos aspectos importantes no processo é a interação entre a regulação exercida pelo estado e a gestão competitiva, fazendo com isso que haja necessidade de um equilíbrio dinâmico entre estes dois elementos. Uma maneira de vislumbrar este equilíbrio e aumentar a eficiência do sistema energético, com os setores da cadeia tornando-se negócios distintos, seria a gestão integrada e a proposição de iniciativas de fomento à cooperação ao longo da cadeia (estendida) de suprimentos, que se apresenta com enormes desafios devido à complexidade para articular agentes de diferentes naturezas e interesses distintos. Neste contexto, o presente trabalho tem como objetivo mostrar como a cadeia de suprimentos da indústria de eletricidade no Brasil está configurada, descrevendo suas transformações frente ao processo regulatório decorrente da reforma do setor elétrico e suas consequências em termos de impacto sobre a cadeia como um todo. A metodologia consiste em utilizar análises qualitativas e quantitativas, para mostrar que a análise sistêmica da cadeia de suprimentos de energia elétrica no Brasil caracteriza-se como instrumento conceitual e metodológico muito apropriado à identificação de potencialidades e fragilidades, as quais comprometem a eficiência do mercado competitivo. Com a descrição de todos estes aspectos a pesquisa pretende mostrar reais contribuições para as necessidades de planejamento na área, destacando-se o esforço na busca de integração e articulação dos componentes e processos do sistema energético mais relevantes à tomada de decisão, bem como a introdução de novos conceitos que se vislumbram promissores para o avanço do conhecimento na área / Abstract: The decision processes and institutional relationships along the stages of the brazilian electricity energy supply chain have been strongly changed during the reform process, thus requiring that restructuring be well fitted to the new hybrid environment (state and private) with market players, state companies and a regulator. One of the most important aspects in this process is the interaction among the state regulation and the competitive management, thus requering a dynamic equilibrium between these two players. A possible way to achieve this equilibrium and also increase the efficiency of the energy system, with separate businesses for each stage of the supply chain, could be the integrative management and the proposal of a set of initiatives to encourage the cooperation along the extended supply chain stages. In this context, this research work aims at presenting the current configuration of the brazilian electricity supply chain, with a description of the main changes after deregulation of the electric sector, as wel as its impacts on the supply chain as a whole. The proposed methodology includes qualitative and quantitative analysis, in order to show that the systemic analysis of the electricity energy supply chain is a conceptual framework very apropriated to the identification of potentialities and weakness that can pose risks to the efficiency in the competitive markets. With the description of all these aspects, this researck work aims at bring real contributions to the current planning needs in the area, with specific emphasis on the efforts to achieve integration and conexion among the most relevant components and processes of the energy system to decision making process, as well as the introduction of new concepts with potential to extend the present knowledge in this area / Doutorado / Planejamento de Sistemas Energeticos / Doutor em Engenharia Mecânica
30

Modelo de suporte a decisão para a otimização da operação de sistema de Usinas Hidreletricas / A decision support tool the optimization of the operation of a system of hydro-eletric plants

Franco, Hermas Teixeira, 1954- 24 February 2006 (has links)
Orientador: Alberto Luiz Francato / Dissertação (mestrado) - Universidade Estadual de Campinas, Faculdade de Engenharia Civil, Arquitetura e Urbanismo / Made available in DSpace on 2018-08-09T18:59:36Z (GMT). No. of bitstreams: 1 Franco_HermasTeixeira_M.pdf: 12981499 bytes, checksum: 1cc917f0c21b08e2633be79cc8d29042 (MD5) Previous issue date: 2006 / Resumo: Este trabalho tem como objetivo construir uma ferramenta de suporte à decisão que permita avaliar de maneira fácil e rápida as alternativas existentes para a otimização energética do aproveitamento conjunto da operação multipla de um "Sistema Reservatório" já existente com vistas à maximização dos benefícios deste sistema. Definiu-se (para uso neste trabalho) a expressão "Sistema Reservatório"? como sendo um conjunto de reservatórios hídricos que propõe-se administrar. Definiu-se ainda (no âmbito deste trabalho) como benefícios a energia potencial gravitacional total (dentro do horizonte de planejamento) dos recursos hídricos compreendidos neste estudo. Para avaliar estas alternativas de otimização foi desenvolvido um especial sistema de suporte à decisão para ser usado pelos operadores do sistema podendo subsidiar o processo da tomada das decisões. Procurou-se construir esta ferramenta de tal forma que fosse constituida por um sistema computacional em ambiente gráfico (Windows ®) com interface amigável ao usuário (F-GUI - Friendly Grafic User Interface), para ser usada de forma contínua e que fosse também de fácil implantação. O arcabouço teórico utilizado pelo sistema foi o da concepção de Sistema de Suporte à Decisão para a modelagem do sistema em estudo, tendo usado a técnica de Programação Não Linear para a etapa da otimização. As funções da otimização multi-objetivo inerentes à produção de energia elétrica ou reservação de volumes d'água para a mesma finalidade, são tratadas pelo método das ponderações, ficando a cargo dos operadores do sistema a calibração dos fatores sob diferentes situações de carga. Este trabalho utilizou os dados disponibilizados pela AES Tietê referentes a cinco reservatórios-usinas sequenciais no Rio Tietê, três reservatórios-usinas sequencias no Rio Pardo, um reservatório-usina no Rio Grande e um reservatório-usina no Rio Mogi-Guaçu, todos situados na região Sudeste do Brasil / Abstract: This dissertation has the objective of build a Decision Support Tool that gives a quick and easy way to analyze all the different alternatives to manage integrated a complex of hydroelectric reservoirs seeking the maximization of the benefits of the complex. The benefits of the complex were defined as the total potential gravitational energy of the hydraulic resources included in the system in the period of the planning horizon. This tool had being built looking for a computer Friendly Graphic User Interface based in the Microsoftã Windows Operational System to make easy the use of the tool day by day and also the initial installation in the users computers. The theory used were the conception of the Decision Support Tool in the modeling phase study and the Non Linear Programming in the optimization phase. This dissertation has used the data provided by the owner of the power generation complex -AES Tiete- that include five reservoirs in the Tiete river basin, three reservoirs in the Pardo river basin, one reservoir in the Grande river basin and one reservoir in the Mogi-Guaçu river basin, all of them in the southeast region of Brasil, South America / Mestrado / Recursos Hidricos / Mestre em Engenharia Civil

Page generated in 0.0823 seconds