• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • Tagged with
  • 6
  • 6
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

A review of the fluvial geomorphology monitoring of the receiving streams of the Mooi-Mgeni [River] Transfer Scheme Phase 1.

Hunter, Alistair Malcolm Scott. January 2009 (has links)
The Mgeni River is the major water resource for the eThekwini Metropolitan and Msunduzi Municipalities. At the end of 2002, the Mooi-Mgeni Transfer Scheme Phase 1, which transfers water from the Mooi River into the Mgeni catchment to augment the water supply to this region, was completed. The interbasin transfer of water resulted in the loss of habitat, erosion of the stream channel and transformation of the riparian zone in the receiving streams. Stream regulation resulting in an altered flow regime is considered the greatest threat to a riverine environment. An Environmental Management Plan (EMP), incorporating fluvial geomorphological monitoring procedures, was implemented to monitor the impact of the transfer on the receiving streams, the Mpofana and Lions Rivers, and to determine the rate and magnitude of erosion. A comparison of the geomorphological monitoring procedure of the EMP with best practice geomorphological monitoring derived from a review of the national and international stream geomorphological literature was conducted in this study. In addition, the implementation of the EMP geomorphological monitoring procedures was described and onsite observations of physical impacts on the receiving streams were completed. The geomorphological monitoring of the EMP included the use of erosion pins, survey of stream cross-sections and fixed-point photography. Photographs and data were collected from February 2003 to June 2006. The comparison of these monitoring methods against stream assessment best practices revealed the strengths and weaknesses of the geomorphological monitoring implemented in the receiving streams. Several key weaknesses were revealed. Firstly, an inadequate number of stream cross sections was included in the monitoring procedures. Secondly, although the erosion pins indicated some general trends in the erosion of the stream channel, they did not give a true impression of the rate and magnitude of change in slope and channel width of the stream, and the location of the erosion pins sites did not take into account the actual direction of flow during transfer as erosion pin sites were selected during low flow conditions. In addition, it was difficult to determine whether the erosion pins had been lost due to erosion or to turbulence. The results were difficult to assess and did not show whether the erosion was localised at the pins or the section of bank or stream profile. Thirdly, analysis of platform changes in the stream channel (e.g. through a comparison of aerial photograph sets) was lacking and no attempt was made to integrate the results from the different methods. Overall, the study concluded that the geomorphological monitoring of the EMP was limited, and it did not highlight the rate and magnitude of erosion in the receiving streams. Based on the findings of this study, recommendations are provided for geomorphological monitoring of the receiving streams of the Mooi Mgeni Transfer Scheme. / Thesis (M.Env.Dev.)-University of KwaZulu-Natal, Pietermaritzburg, 2009.
2

Detecting Geomorphic Change and Stream Channel Evolution on the Sandy River, Oregon, Using Lidar Following Dam Removal in 2007

Anthony, Lowell Henry 06 March 2019 (has links)
Following the removal of Marmot Dam on the Sandy River, Oregon, several Lidar flights were flown over the area of the former reservoir. The resultant sequential DEMs permitted calculation of reach-scale volumetric erosion and aggradation following dam removal. This allows for change detection across the entire affected reach of the former impoundment rather than just at several cross sections. In the first year there was a net loss of blank sediment in the dewatered reach. Subsequent flights show continued degradation of 145,649 m3 as well as aggradation of 6,232 m3. Sediment transport reached quasi-equilibrium in 2012 with a net change of 65 m3. In addition, this technique allows the extraction of cross-section information which shows that the channel continues to be actively migrating in some areas while also being constrained by bedrock features from past volcanism in some reaches. This study further shows the capability of lidar to measure rates of aggradation and degradation for an entire river system instead of reach specific extrapolations and that repeat lidar flights can more than adequately assess the changing nature of entire stream reaches more rapidly and more cost effectively than traditional field techniques. In addition: The utility of Lidar to do river management with repeat returns, having successive lidar acquisitions run on the watershed level will help us to gain insight into the correlation to precipitation events and geomorphological change in a given reach. Lidar can be used to assess the validity of channel evolution models. Sequential runs of lidar can be used to adjust the overall effectiveness of current CEM's and create new ones that consider reach specific geomorphology. Dam removal projects should incorporate initial lidar flights prior to removal and follow acquisitions based on known CEM's for the region and overall region-specific physiography. Sequential lidar should be used for hazard mitigation and geohazards analysis with an acquisition timeframe that is appropriate for the region's physiography, geology, geomorphology and the return interval of the hazard being monitored.
3

A measurement technique for refractory erosion/corrosion in molten metals /

Holford, W. David (William David) January 1985 (has links)
No description available.
4

A measurement technique for refractory erosion/corrosion in molten metals /

Holford, W. David (William David) January 1985 (has links)
No description available.
5

Wind erosion modelling system parameters to determine a practical approach for wind erosion assessments

Liebenberg-Enslin, Hanlie 15 July 2014 (has links)
Ph.D. (Geography) / The focus of Aeolian research has mainly been on wind-blown dust from desert and arid areas. Numerous dust emission schemes have been developed over the years aimed at accurately estimating dust emission rates from various soil types and land use surfaces. Limited research has been done on wind-blown dust from smaller area sources – such as mine tailings and ash storage facilities. Lately, the concern about the environmental and health impacts, caused by dust from mine tailings storage facilities and ash disposal sites, has become more prominent, calling for better methods in determining dust emissions and their related impacts. This thesis established a practical approach for wind-blown dust emissions estimation and dispersion modelling from mine waste and ash storage facilities for the purpose of legal compliance assessment. Extensive research on the physics of wind erosion has been done over the past decade, compelling the re-evaluation of previously applied techniques. The latest and most widely applied dust emission schemes are evaluated to determine, through systematic testing of parameterisation and validation, using empirical mine waste and coal ash data, a best-practice prescription for quantifying wind-blown dust emissions and determining effects on a local scale using commercially available dispersion models. The applicability of two dust-flux schemes, (one developed by Marticorena and Bergametti (1995) and the simplified Shao 2004 scheme, as reported in 2011) for the quantification of wind-blown dust emissions, were tested using site specific particle size distribution data, bulk density and moisture content from six gold- and one platinum- tailings storage facilities and from two ash storage facilities. The availability of the required input parameters and the uncertainty associated with these parameters, were tested. The dependency of the Shao et al. (2011) model on plastic pressure (P) and the coefficient cy, both of which are not easily determined, added to the uncertainty of the emission rates. In this study, P and cy were both interpolated using the range limits provided by Shao (2004) for natural soils. By calculating P, using the salt and calcium carbonate content, similar values were obtained. The minimally disturbed dust fraction, as required by the Shao et al. (2011) scheme were derived from particle size distribution analysis but found to be more representative of the fully disturbed particle size faction (𝜂fi) and therefore needed to be corrected to represent the minimally disturbed particle size faction (𝜂mi) through the application of a correction factor, CF𝜂mi. Specific attention was given to the quantification of the threshold friction velocity (u*t) and the threshold velocities (u*), and how these two parameters relate to each under variable wind speed and time durations. This was tested using sub-hourly averaged meteorological data, one set reflected 5-minute intervals and the other 10-minute intervals. Dependent on the frequency and strength of the sub-hourly wind gusts, the resulting dust-flux rates were found to vary significantly when based on hourly averaged wind data in comparison with 5- and 10-minute wind data. Dispersion models are useful tools in air quality management. Whereas ambient monitoring provides actual ambient concentrations for specific pollutants at set locations, atmospheric dispersion models can be used to simulate any number of pollutants and determine the impacts at any location within the modelling domain. These dust-flux schemes of Marticorena and Bergametti (1995) and Shao et al. (2011) have been coupled with the US EPA regulatory Gaussian plume AERMOD dispersion model for the simulation of ground level concentrations resulting from wind-blown dust from mine tailings facilities. For this study, two Case Studies were evaluated; one included two of the gold mine tailings and the second focused on the platinum tailings. Simulated ambient near surface concentrations were validated with ambient monitored data for the same period as used in the model. For the Marticorena and Bergametti (1995) dust-flux scheme, only z0 had to be adjusted to provide a good fit with measured data – whereas the Shao et al. (2011) scheme resulted in significantly higher concentrations, resulting in an over-prediction of the measured data. By applying the correction factor, CF𝜂mi, to the minimally disturbed dust fraction, the predicted concentrations improved considerably. The coupling of the dust-flux schemes with a regulatory Gaussian plume model provided simulated ground level PM10 concentrations in good agreement with measured data. The best correlation was found under conditions of high wind speeds when the prevailing wind was from the direction of the tailings storage facility. This thesis demonstrates that simulated impacts from complex source groups can be performed, within an acceptable range of certainty, using widely applied dust-flux schemes. These dust-flux schemes, developed primarily for large-scale desert and arid areas, have been demonstrated to be applicable also to small-scale sources, of the order of 1 km2, and can be coupled to regularly available dispersion models for impact evaluations of wind-blown dust. The value of this improved approach to the mining and mineral processing industries are substantial, allowing for more accurate health risks and adverse environmental assessments from wind-blown dust from large material storage piles, a source category that has hitherto been difficult to quantify.
6

Evaluation of erosion rates and their impact on riverbank stability

Jianfar, Arjan 02 September 2014 (has links)
A research program was undertaken to quantify the effect of flow induced erosion on the stability of natural river banks along the Red River in Manitoba. The Erosion Measurement Device (EMD) was designed and built in the Geotechnical Laboratory of University of Manitoba to approximate the erosion rate profiles of soil samples from nine sites along the RedRiver. Two simulations of a natural flood event and one of the same flood with the operation of the Floodway were then used to determine the difference in the lower toe erosion and the slopes reduction of the global factor of safety. These results indicate that the operation of the Floodway does not have negative impact on the stability of river banks upstream of the Floodway inlet.

Page generated in 0.1005 seconds