• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 5
  • Tagged with
  • 7
  • 7
  • 7
  • 6
  • 4
  • 4
  • 4
  • 3
  • 3
  • 3
  • 3
  • 3
  • 2
  • 2
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

GA/SA-based hybrid techniques for the scheduling of generator maintenance in power systems

Dahal, Keshav P., Burt, G.M., McDonald, J.R., Galloway, S.J. January 2000 (has links)
Yes / Proposes the application of a genetic algorithm (GA) and simulated annealing (SA) based hybrid approach for the scheduling of generator maintenance in power systems using an integer representation. The adapted approach uses the probabilistic acceptance criterion of simulated annealing within the genetic algorithm framework. A case study is formulated in this paper as an integer programming problem using a reliability-based objective function and typical problem constraints. The implementation and performance of the solution technique are discussed. The results in this paper demonstrate that the technique is more effective than approaches based solely on genetic algorithms or solely on simulated annealing. It therefore proves to be a valid approach for the solution of generator maintenance scheduling problems
2

Generator maintenance scheduling in power systems using metaheuristic-based hybrid approaches

Dahal, Keshav P., Chakpitak, N. January 2007 (has links)
No / The effective maintenance scheduling of power system generators is very important for the economical and reliable operation of a power system. This represents a tough scheduling problem which continues to present a challenge for efficient optimization solution techniques. This paper presents the application of metaheuristic approaches, such as a genetic algorithm (GA), simulated annealing (SA) and their hybrid for generator maintenance scheduling (GMS) in power systems using an integer representation. This paper mainly focuses on the application of GA/SA and GA/SA/heuristic hybrid approaches. GA/SA hybrid uses the probabilistic acceptance criterion of SA within the GA framework. GA/SA/heuristic hybrid combines heuristic approaches within the GA/SA hybrid to seed the initial population. A case study is formulated in this paper as an integer programming problem using a reliability-based objective function and typical problem constraints. The implementation and performance of the metaheuristic approaches and their hybrid for the test case study are discussed. The results obtained are promising and show that the hybrid approaches are less sensitive to the variations of technique parameters and offer an effective alternative for solving the generator maintenance scheduling problem.
3

Evolutionary Generator Maintenance Scheduling in Power Systems

Dahal, Keshav P., Galloway, S.J. January 2007 (has links)
No
4

Generator maintenance scheduling models in power systems : integrated cost models for generator maintenance strategy under market environment

Al-Arfaj, Khalid Abdulaziz January 2009 (has links)
Change from a regulated to deregulated structure means that, the centralized maintenance system is not valid any more. In the surveyed published literature, there is not a single model which incorporates all maintenance cost components to analyze the effect of different maintenance strategies for generator companies (GENCOs). The work enclosed in this thesis demonstrates that there is a considerable requirement for accurately modelling cost components of the maintenance model, to be used in maintenance scheduling for deregulated power system, in order to attain a superior schedule with major financial and operational impact. This research investigates and models most cost factors that affect the maintenance activities of the deregulated GENCOs, and demonstrates the utilization of the developed cost models in maintenance scheduling. It also presents the data gathering process for the developed maintenance cost model. A generator maintenance scheduling model that considers direct and indirect maintenance costs, opportunity costs (i.e. loss of customer goodwill), effective maintenance strategies, failures, and interruptions is developed. A Genetic Algorithm (GA) based approach is employed to achieve maintenance schedules to various generators maintenance scenarios. An Analytical Hierarchy Process (AHP) approach is proposed for modelling customer goodwill. The maintenance model was redeveloped under the Reliability Centred Maintenance (RCM) strategy to analyze the effect of a maintenance strategy on maintenance costs. Case studies are presented to demonstrate the utilisation of the developed models.The investigation shows that the market prices, opportunity costs and maintenance strategy have an effect on the final maintenance schedule. The research demonstrates that the cost components are critical factors to achieve an effective maintenance schedule, and they must be considered and carefully modelled in order to reflect more realistic situation for maintenance scheduling of generator units in deregulation environment.
5

Generator Maintenance Scheduling Models in Power Systems. Integrated Cost Models for Generator Maintenance Strategy under Market Environment.

Al-Arfaj, Khalid A. January 2009 (has links)
Change from a regulated to deregulated structure means that, the centralized maintenance system is not valid any more. In the surveyed published literature, there is not a single model which incorporates all maintenance cost components to analyze the effect of different maintenance strategies for generator companies (GENCOs). The work enclosed in this thesis demonstrates that there is a considerable requirement for accurately modelling cost components of the maintenance model, to be used in maintenance scheduling for deregulated power system, in order to attain a superior schedule with major financial and operational impact. This research investigates and models most cost factors that affect the maintenance activities of the deregulated GENCOs, and demonstrates the utilization of the developed cost models in maintenance scheduling. It also presents the data gathering process for the developed maintenance cost model. A generator maintenance scheduling model that considers direct and indirect maintenance costs, opportunity costs (i.e. loss of customer goodwill), effective maintenance strategies, failures, and interruptions is developed. A Genetic Algorithm (GA) based approach is employed to achieve maintenance schedules to various generators maintenance scenarios. An Analytical Hierarchy Process (AHP) approach is proposed for modelling customer goodwill. The maintenance model was redeveloped under the Reliability Centred Maintenance (RCM) strategy to analyze the effect of a maintenance strategy on maintenance costs. Case studies are presented to demonstrate the utilisation of the developed models.The investigation shows that the market prices, opportunity costs and maintenance strategy have an effect on the final maintenance schedule. The research demonstrates that the cost components are critical factors to achieve an effective maintenance schedule, and they must be considered and carefully modelled in order to reflect more realistic situation for maintenance scheduling of generator units in deregulation environment.
6

Nature Inspired Discrete Integer Cuckoo Search Algorithm for Optimal Planned Generator Maintenance Scheduling

Lakshminarayanan, Srinivasan January 2015 (has links)
No description available.
7

A model predictive control approach to generator maintenance scheduling

Ekpenyong, Uduakobong Edet 22 September 2011 (has links)
The maintenance schedule of generators in power plants needs to match the electricity demand and needs to ensure the reliability of the power plant at a minimum cost of operation. In this study, a comparison is made between the modified generator maintenance scheduling model and the classic generator maintenance scheduling model using the reliability objective functions. Both models are applied to a 21-unit test system, and the results show that the modified generator maintenance scheduling model gives better and more reliable solutions than the regular generator maintenance scheduling model. The better results of the modified generator maintenance scheduling model are due the modified and additional constraints in the modified generator maintenance scheduling model. Due to the reliable results of the modified generator maintenance scheduling model, a robust model is formulated using the economic cost objective function. The model includes modified crew and maintenance window constraints, with some additional constraints such as the relationship constraints among the variables. To illustrate the robustness of the formulated GMS model, the maintenance of the Arnot power plant in South Africa is scheduled with open-loop and closed-loop controllers. Both controllers satisfy all the constraints but the closed-loop results are better than the open-loop results. AFRIKAANS : Die onderhoudskedule vir kragopwekkers (OSK) in kragstasies moet kan voorsien in die vraag na elektrisiteit en moet die betroubaarheid van die kragstasie teen ’n minimum operasiekoste verseker. In hierdie studie word die betroubaarheidsdoelwitfunksie gebruik om ’n gewysigde onderhoudskeduleringsmodel vir kragopwekkers te vergelyk met die konvensionele onderhoudskeduleringsmodel. Beide modelle word toegepas op 'n 21-eenheid-toetsstelsel, en die resultate toon dat die gewysigde model ’n beter en meer betroubare oplossing bied as die konvensionele model. Die beter resultate van die gewysigde model is die gevolg van die gewysigde en bykomende beperkings in die gewysigde model. As gevolg van die betroubare resultate van die gewysigde onderhoudskeduleringsmodel word die koste-ekonomie-doelwitfunksie gebruik om ’n robuuste model te formuleer. Die model sluit gewysigde bemanning- en onderhoudvensterbeperkings in, met ’n paar bykomende beperkings soos die verhoudingsbeperkings tussen die veranderlikes. Om die robuustheid van die geformuleerde OSK-model te illustreer word die instandhouding van die Arnot kragstasie in Suid-Afrika geskeduleer met oop- en geslotelus-beheerders. Beide beheerders voldoen aan al die beperkinge, maar die geslotelusresultate is beter as die ooplusresultate. / Dissertation (MSc)--University of Pretoria, 2011. / Electrical, Electronic and Computer Engineering / Unrestricted

Page generated in 0.1127 seconds