• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 303
  • 7
  • 1
  • 1
  • Tagged with
  • 319
  • 319
  • 268
  • 268
  • 178
  • 130
  • 130
  • 110
  • 89
  • 84
  • 78
  • 78
  • 68
  • 67
  • 64
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
91

Análise do comportamento transitório de geradores distribuídos eólicos e fotovoltaicos conectados num mesmo alimentador / Analysis of the transient behavior of wind and photovoltaic distributed generators connected in the same electric feeder

Bainy, Rômulo Gonçalves 09 March 2015 (has links)
Made available in DSpace on 2017-07-10T17:11:49Z (GMT). No. of bitstreams: 1 Romulo Bainy2.pdf: 2925977 bytes, checksum: f7adb8982457ac4631549de0def5054e (MD5) Previous issue date: 2015-03-09 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / This work evaluated the effect of the variation of some factors over the transient behavior of a feeder from a Distribution Power System where there are Distributed Generator (DG) connected. Two types of distributed generation were evaluated, which are photovoltaic and wind power. The chosen Distribution Power System has 32 nodes and was presented by (de Abreu, 2005) and (Salim, 2010). First of all, this feeder was characterized and the nodes were separated on four clusters, comply some electric characteristics from each one. Each cluster has a chosen node that represents the center of the group from the cluster, which resulted on four candidates nodes. Than, it was time to build the scenarios for simulation, they were made by two candidate node and fault node, which means that there are six possible scenarios. To chose the fault node, there is some premises: None of GD can generate on a islanded operation; It is not necessary that all scenarios has the same fault node; and, the more important one, the fault node must have fault current similar on all scenarios. The studied factors were: Loading of the feeder; Power factor of the loads; X/R relation of lines; GFV conexion; FSIG conexion. The simulation evaluated the influence of each factors. Among the five , only two showed influence in the transient behavior of the system: the connection ratio X/R and the FSIG conexion . The other three did not shown influence. Thus, the two factors correspond to valuable study object , and should be considered when evaluating the transient behavior at Distribution System with DG. / Este trabalho avaliou a influência de alguns fatores sobre o comportamento transitório de um alimentador de um sistema de distribuição com geradores distribuídos conectados. Dois tipos de geração distribuída foram avaliados, sendo eles a fotovoltaica e a eólica. O sistema elétrico de distribuição (SED) escolhido possui 32 nós e foi apresen-tado por (de Abreu, 2005) e em (Salim, 2010). Primeiramente este alimentador foi caracterizado e os nós separados em 4 clusters, conforme algumas características elétricas de cada um. Para cada cluster um nó foi escolhido como representante das centroide, ou seja, mais similar com a identidade do grupo. O trabalho seguiu com a concepção dos cenários de simulação, estes compostos pela junção destes quatro nós em duplas, além do nó de falta, o que se traduz em seis possíveis cenários. A escolha do nó para inserção de um curto-circuito trifásico respeitou três premissas: não causar ilhamento em nenhum dos geradores distribuídos; não é necessário que o nó de falta de todos os cenários seja igual; e, a premissa mais importante, que ele deve gerar uma corrente de falta com valor similar em todos os cenários.Os fatores avaliados foram: Carregamento do Alimentador; Fator de Potência das Cargas; Relação X/R das linhas de distribuição; Conexão do GFV; Conexão do FSIG.Cada um dos fatores sofreu uma quantidade específica de variações para que seu efeito sobre o comportamento transitório fosse investigado. Dentre esses cinco, apenas dois se mostraram capazes de influenciar no comportamento transitório do sistema: a relação X/R e a conexão do FSIG. Os outros três não demonstraram grande influência, sendo sempre imperceptível o efeito de sua variação. Dessa forma, a variação dos dois fatores corresponde a valioso objeto de estudo, sendo necessário considerá-los quando se deseja avaliar o comportamento transitório de um Sistema de Distribuição com geradores distribuídos.
92

Impacto da proteção do tipo crowbar dos aerogeradores de indução duplamente excitados nos sistemas de proteção de redes de distribuição

ARIAS, Piedy Del Mar Agamez 07 April 2016 (has links)
Submitted by camilla martins (camillasmmartins@gmail.com) on 2017-02-21T18:40:07Z No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ImpactoProtecaoTipo.pdf: 1575069 bytes, checksum: a2fcaa26dea5129a1846694b720486fe (MD5) / Approved for entry into archive by Edisangela Bastos (edisangela@ufpa.br) on 2017-03-27T13:52:13Z (GMT) No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ImpactoProtecaoTipo.pdf: 1575069 bytes, checksum: a2fcaa26dea5129a1846694b720486fe (MD5) / Made available in DSpace on 2017-03-27T13:52:13Z (GMT). No. of bitstreams: 2 license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Dissertacao_ImpactoProtecaoTipo.pdf: 1575069 bytes, checksum: a2fcaa26dea5129a1846694b720486fe (MD5) Previous issue date: 2016-04-07 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / A contínua incorporação de geração distribuída às redes de energia elétrica no mundo, a partir de fontes renováveis, tem contribuído positivamente no fornecimento de energia, na eficiência energética e na redução de gases poluentes. Apesar disso, novos desafios relacionados com as mudanças na qualidade da energia, a estabilidade do sistema e os níveis de curto circuito, dentre outros, continuam sendo alvo de pesquisas. O Brasil tem adicionado nos últimos anos uma importante quantidade de gigawatts às redes graças a conexão de grandes parques eólicos. Adicionalmente, as recentes possibilidades para que os consumidores se tornem pequenos geradores e troquem energia nas redes de distribuição, visa a conexão de outra quantidade de gigawatts. Diante disto, este trabalho apresenta as análises do impacto da atuação da proteção do tipo crowbar dos aerogeradores de indução duplamente excitados (DFIG) sobre os sistemas de proteção empregados nas redes de distribuição radiais, visando avaliar a influência que exerce sobre a coordenação das funções de proteção de sobrecorrente quando ocorrem faltas na rede. Para garantir este objetivo, avaliações das contribuições às correntes de curto-circuito do DFIGs ligados à rede durante perturbação, são efetuadas no software DIGSILENT Power Factory 14.1, sob a consideração de dois casos de operação do DFIG. Um deles contempla a não inserção da proteção do tipo crowbar e o outro considera a inserção desta proteção durante uma perturbação na rede. A estratégia para implantar a proteção do tipo crowbar estabelece a inserção de resistências ao circuito do rotor do DFIG quando forem ultrapassados limites de corrente no rotor e tensão no ponto de conexão. Os resultados obtidos fornecem informações relevantes relacionadas com as mudanças nos níveis de curto-circuito, as quais devem ser contempladas nos estudos prévios à conexão de novos DFIG, devido a importância que representam para coordenar as funções de proteção de sobreccorrente sob considerações dinâmicas e em regime permanente. / The continued incorporation of distributed generation from renewable sources to electricity networks in the world, has contributed positively in the energy supply, energy efficiency and reduction of polluting gases. Nevertheless, new challenges related to the variations in power quality, system stability, short circuit levels, among others, continue to be research. The Brazil has added in recent years an important amount of gigawatts to networks through the connection of large wind farms. In addition, recent possibilities for consumers to make small generators and exchange energy in the distribution network aims to connect another quantity of gigawatts. In this context, this work presents the analysis of the impact of Crowbar protection of double feed induction generator (DFIG) on protection systems used in radial distribution networks to evaluate its influence on the coordination of overcurrent protection functions when there are faults in the network. To reach this goal, assessments of contributions to short-circuit currents of DFIG connected to the grid during disturbance, was simulated in DIGSILENT Power Factory 14.1 software where two cases where considered. The first includes the non-inclusion of crowbar protection and the second considers the inclusion of this protection during a network disturbance. The strategy implemented on crowbar protection proposed the series resistance insertion in the rotor circuit when thresholds velocity, current in the rotor and voltage at the connection point, are Exceeded. The results provide relevant short-circuit levels information that from now on must be considered during previous DFIG connection studies due to the importance they represent to coordinate overcurrent protection function under dynamic and steady state conditions.
93

Análise de um mecanismo de compensação de reativos incorporado aos inversores de um sistema fotovoltaico conectado à rede elétrica / Analysis of a reactive power compensation mechanism incorporated into inverters of a grid-connected photovoltaic system

Benedito, Ricardo da Silva 14 November 2014 (has links)
No Brasil, quando uma unidade consumidora (UC) sob regime de microgeração ou de minigeração distribuída tem parte ou a totalidade da sua demanda por potência ativa suprida pela planta geradora, mas sua demanda por potência reativa é atendida exclusivamente pela rede elétrica, verifica-se uma aparente deterioração do fator de potência dessa UC, sob a ótica da concessionária. Esse efeito decorre do fato de que o fator de potência, de acordo com a regulamentação vigente, é determinado apenas a partir das medições dos fluxos de potência ativa e reativa trocados entre a UC e a rede elétrica e não também entre a planta geradora e UC. Para consumidores do Grupo A (tensão de fornecimento igual ou superior a 2,3 kV) nessa situação, de acordo com o perfil da carga, pode haver cobrança por excedentes de reativos, constituindo-se assim uma barreira. Especificamente no caso de sistemas fotovoltaicos conectados à rede, existe a possibilidade de se utilizar os próprios inversores c.c.-c.a para suprir a demanda de reativos da UC e, dessa forma, minimizar o problema apresentado. Com o objetivo de se avaliar essa alternativa no contexto brasileiro, tendo-se em vista condições reais de operação e os limites normativos de injeção de potência reativa para inversores de sistemas fotovoltaicos, foi realizado um estudo de caso de uma planta fotovoltaica instalada no telhado do prédio da Administração do Instituto de Energia e Ambiente da Universidade de São Paulo. O estudo mostrou que a compensação realizada por meio do inversor selecionado evitou a cobrança de excedentes de reativos sem afetar de forma significativa a produtividade do sistema fotovoltaico. Do ponto de vista elétrico, verificou-se que a injeção de reativos pelo inversor não provocou variações significativas de tensão no ponto de acoplamento ou no alimentador e, ainda, se verificou considerável liberação de capacidade do sistema supridor da concessionária. Dessa forma, a análise dos resultados indica uma tendência a se considerar a compensação de reativos proporcionada pelo próprio inversor a opção mais viável para se lidar com os excedentes de reativos, comparativamente a métodos convencionais de compensação ou à situação em que nenhuma ação compensatória seja implementada. / In Brazil, when a consumer unit (CU) under a distributed microgeneration or minigeneration scheme has part or all of its demand for active power supplied by the generating plant, but its demand for reactive power is served exclusively by the grid, the power factor of this CU appears deteriorated, from the perspective of the utility. This effect is due to the fact the power factor, according to the current regulations, is determined only from measurements of the flows of active and reactive power exchanged between the UC and the grid and not also between the generating plant and UC. Users of group A (supply voltage equal to or greater than 2.3 kV) in this situation, according to the CU load profile, may be charged due the reactive power excess, thus constituting a barrier. Specifically in the case of grid-connected photovoltaic systems, there is the possibility of using the d.c.- a.c. inverters to suply the CU reactive power demand and, thus, minimizing the presented problem. In order to evaluate this alternative in the Brazilian context, keeping in view real operating conditions and regulatory limits for the reactive power injection for photovoltaic inverters, we conducted a case study with a photovoltaic plant installed on the roof of the University of São Paulo Institute for Energy and Environment administration building. The study showed that the compensation performed by the selected inverter prevented the reactive power excess charging without affecting significantly the photovoltaic system productivity. From an electrical point of view, it was found that the injection of reactive power by the inverter did not cause significant voltage variations at the coupling point or at the transformer and, additionally, there was a significant release in the utility suply system capacity. Thus, the analysis results indicates a tendency to consider the compensation provided by the inverter itself the most viable option for dealing with the surplus of reactive power compared to conventional compensation methods or to the situation in which no compensatory action is implemented.
94

Barreiras e potencialidades à difusão de geração fotovoltaica, conectada à rede de distribuição, no estado do Tocantins

Paula, Juci José de 15 July 2016 (has links)
Submitted by Silvana Teresinha Dornelles Studzinski (sstudzinski) on 2016-09-21T13:59:53Z No. of bitstreams: 1 Juci José de Paula_.pdf: 8768993 bytes, checksum: 367b45dfb9f603b93805a677e010f61d (MD5) / Made available in DSpace on 2016-09-21T13:59:53Z (GMT). No. of bitstreams: 1 Juci José de Paula_.pdf: 8768993 bytes, checksum: 367b45dfb9f603b93805a677e010f61d (MD5) Previous issue date: 2016-07-15 / Nenhuma / Em países como Alemanha, Japão, Estados Unidos e China a geração fotovoltaica ocupa lugar de destaque entre suas principais fontes geradoras de energia elétrica. No Brasil a geração fotovoltaica está sendo timidamente introduzida, contudo, ainda, não se destaca como fonte de energia elétrica em sua matriz elétrica. Há evidências de que a inércia, em seu desenvolvimento, está relacionada a barreiras econômicas, regulatórias, institucionais e de mercado. No intuito de encontrar os fatores que impedem sua difusão no estado do Tocantins, este trabalho busca através de um estudo de caso com a aplicação do método do pensamento sistêmico, gerar conhecimento sobre as principais barreiras ao uso desta fonte, objetivando atender à crescente demanda por energia elétrica e possibilitando uma popularização das fontes renováveis. Na primeira fase gerou-se um entendimento melhor sobre o tema pesquisado. Após, realizou-se entrevistas com especialistas que proporcionaram o entendimento da atual situação da difusão de sistemas fotovoltaicos no estado, confirmando a existências de barreiras e criando base para elaboração de miniestruturas sistêmicas que, posteriormente, foram consolidadas em uma única estrutura apresentando os dados encontrados. Os resultados obtidos apresentaram os problemas enfrentados pela geração distribuída fotovoltaica no estado, confirmando a existência de barreiras econômicas, institucionais, de mercado e outras, que atrapalham a difusão desta fonte. Ao final, foram propostas ações que eliminam ou minimizam estas barreiras. / In countries like Germany, Japan, the United States and China, the photovoltaic power generation occupies a prominent place among their main electric energy generating source. In Brazil, the photovoltaic power generation is being timidly introduced. However, it does not stand out as an electric power source in its energetic matrix. There are evidences that its development inertia is related to economic, regulatory, institutional and market barriers. In an attempt to find the factors that prevent its dissemination in the State of Tocantins, this research seeks to engender knowledge about the main hindrances to the use of that source, through a case study, with the application of the systemic thinking method. It aims to meet the increasing demand of electric power and making it possible a popularization of the renewable sources. In the first phase, a better understanding of the studied topic was carried out. Thereupon, some interviews with specialists were performed. They provided the comprehension of the current situation of the photovoltaic systems diffusion in the state, thus confirming the existence of obstacles and creating a basis for the preparation of systemic mini structures that, subsequently, were consolidated into a single structure, presenting the data encountered. The obtained results demonstrated the problems confronted by the distributed photovoltaic generation in the state, reaffirming the existence of economic, institutional and market barriers among others, what obstruct the spreading of that source. Actions to eliminate or minimize those obstacles were proposed.
95

Programação estocástica aplicada ao planejamento de sistemas de distribuição considerando geração distribuída e emissões de CO2 /

Lima, Tayenne Dias de January 2019 (has links)
Orientador: John Fredy Franco Baquero / Resumo: A presença de Geração Distribuída (GD) no Sistema de Distribuição de Energia Elétrica (SDEE) tem se incrementado nos últimos anos devido a mudanças na regulação e a incentivos governamentais, proporcionando benefícios técnicos e econômicos. Em particular, é esperado que a GD renovável (eólica ou solar) seja integrada adequadamente no SDEE, visando contribuir na redução de emissões de gases de efeito estufa. Entretanto, a presença da GD renovável, junto com suas inerentes incertezas, aumenta a complexidade no planejamento do SDEE. Diante do exposto, neste trabalho propõe-se um modelo de programação estocástica de dois estágios para o problema de planejamento da expansão do SDEE multi-período. As incertezas da geração renovável (associadas à irradiação solar e velocidade do vento) e demanda são representadas por meio de cenários. A função objetivo minimiza o valor presente líquido dos investimentos (subestações, circuitos, e alocação de GD), custo da energia, manutenção e operação, assim como o custo das emissões de CO2. A operação das unidades de GD é representada limitando a potência ativa/reativa que pode ser injetada segundo as curvas de capabilidade e restrições de fator de potência. O modelo proposto foi implementado na linguagem de modelamento AMPL e resolvido com o solver CPLEX. Testes utilizando um SDEE de 24 e 54 nós comprovam a eficiência do modelo. / Abstract: The presence of Distributed Generation (DG) in Electrical Distribution Systems (EDSs) has been increased in recent years due to changes in regulation and government incentives, leading to technical and economic benefits. In particular, renewable DG (wind or solar power) is expected to be properly integrated into the EDS, aiming to contribute to the reduction of greenhouse gas emissions. However, the presence of renewable DG, along with its inherent uncertainties, increases the complexity in the planning of the EDS. In this context, this work proposes a two-stage stochastic programming model for the problem of EDSs expansion planning. The uncertainties of renewable generation (associated with solar irradiation and wind speed) and demand, are represented through scenarios. The objective function minimizes the net present value of investments (substations, circuits, and DG allocation), energy cost, maintenance and operation, as well as the cost of CO2 emissions. The operation of the DG units is represented by limiting the active/reactive power that can be injected according to capability curves and power factor constraints. The proposed model was implemented in the modeling language AMPL and solved with the solver CPLEX. Tests using a 24 and 54-nodes EDS prove the efficiency of the proposed model. / Mestre
96

Desempenho de redes de distribuição com geradores distribuídos

Ochoa Pizzali, Luis Fernando [UNESP] 23 November 2006 (has links) (PDF)
Made available in DSpace on 2014-06-11T19:30:51Z (GMT). No. of bitstreams: 0 Previous issue date: 2006-11-23Bitstream added on 2014-06-13T21:01:26Z : No. of bitstreams: 1 ochoapizzali_lf_dr_ilha.pdf: 1694440 bytes, checksum: e159d13557d3d0a89139b7565f849244 (MD5) / Conselho Nacional de Desenvolvimento Científico e Tecnológico (CNPq) / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Alban / Fundação de Ensino Pesquisa e Extensão de Ilha Solteira (FEPISA) / Neste trabalho, é apresentada uma análise em regime permanente que considera a avaliação de impactos técnicos tais como perdas elétricas, queda de tensão e níveis de curto-circuito, entre outros; utilizando dados de demanda e geração variáveis no tempo ao longo de um horizonte determinado. O objetivo é encontrar um conjunto de arranjos da GD (configurações) que levem ao melhor desempenho da rede de distribuição analisada, minimizando ou maximizando cada aspecto técnico segundo o interesse da empresa de distribuição. Dada a natureza combinatória deste problema, que requer uma ferramenta de otimização capaz de manipular múltiplos objetivos, os impactos técnicos serão avaliados simultaneamente utilizando uma metodologia baseada no conceito do Non-dominated Sorting Genetic Algorithm (NSGA), conduzindo a soluções mais reais e diversificadas para a tomada de decisões, conhecidas como soluções ótimas de Pareto. / In this work a steady-state analysis considering the assessment of technical impacts such as losses, voltage drop and short-circuit levels, among others; utilizing time-variant loads and generation within a specified horizon. The objective is to find a set of configurations that lead to the best performance of the distribution network under analysis, minimizing or maximizing each technical aspect according to the utility's concerns. Given the combinatorial nature of this problem, which requires an optimization tool able to handle multiple objectives, technical impacts will be assessed simultaneously through a methodology based on the non-dominated sorting genetic algorithm (NSGA). This approach leads to a more realistic and diversified set of solutions for taking decisions, known as Pareto-optimal solutions.
97

Resposta da demanda no planejamento para integração de recursos energéticos distribuídos /

Moreira, Saulo Gomes January 2017 (has links)
Orientador: Dionízio Paschoareli Júnior / Resumo: No planejamento da integração de fontes de geração distribuída no sistema de distribuição em baixa tensão é fundamental que haja a investigação dos efeitos provocados nas condições operacionais da rede, tais como níveis de tensão e carregamento de transformadores. Com vista ao potencial aumento da geração fotovoltaica no cenário brasileiro e à iminente migração tecnológica das redes tradicionais para as chamadas redes inteligentes, a resposta da demanda se apresenta como uma das estratégias para possibilitar uma integração eficiente de recursos energéticos distribuídos. Na aplicação de um programa de resposta da demanda, especificamente para o cenário de uma distribuidora, permitiu-se concluir, através da utilização de dados reais, que no processo de planejamento de integração de novas fontes de geração de natureza fotovoltaica, a aplicação de uma estrutura tarifária com custos diferenciados horários baseados no custo marginal de capacidade do sistema, possibilita que sejam observadas melhores condições operacionais da rede. A aplicação da nova estrutura tarifária horária indica uma significativa alteração no perfil de carga esperado dos consumidores de baixa tensão o que refletiu em melhores valores de níveis de tensão e aumento da capacidade livre do transformador em integrar novas fontes distribuídas no sistema. / Abstract: In planning the integration of distributed generation sources in the low voltage distribution system, it is essential to investigate the effects caused by the network operating conditions, such as voltage levels and transformer loading. By the point of view of the potential increase in photovoltaic generation for the Brazilian scenario and the imminent technological migration of traditional networks to the so-called Smart Grids, demand response is one of the strategies to enable the efficient integration of distributed energy resources. By applying a demand response program, specifically for the scenario of a distribution company, it was possible to conclude, by using real data, that in the integration planning process of new photovoltaic based generation sources, the application of a tariff structure with hourly differentiated costs based on the system's marginal cost of capacity, allows better operational conditions of the network to be observed. The application of the new hourly tariff structure indicates a significant change in the expected load profile of the low voltage consumers, which reflected in better values of voltage levels and rising of the free capacity of the transformer to integrate new distributed sources into the system. / Doutor
98

Vantagem competitiva no mercado de geração distribuída de energia solar fotovoltaica

Marcolino, Rodrigo Teixeira 12 May 2016 (has links)
Submitted by Rodrigo Marcolino (rtmarcolino@gmail.com) on 2016-06-18T16:44:47Z No. of bitstreams: 1 estrategia-marcolino_Final.pdf: 851296 bytes, checksum: be02e4d967578bc7a0d9edbbf48ba776 (MD5) / Rejected by Ana Luiza Holme (ana.holme@fgv.br), reason: Rodrigo, O titulo está diferente da ata, só pode alterar se a banca mudou o titulo, se sim, veja com o orientador para passar na Secretaria para colocar o titulo no verso da ata. Caso não você tem que colocar o mesmo titulo da ata, no caso: VANTAGEM COMPETITIVA NO MERCADO DE GERAÇÃO COMPETITIVA DE ENERGIA SOLAR FOTOVOLTAICA Ficou faltando a folha de rosto que é a 2 pagina antes da ficha catalográfica. Ficou faltando o agradecimento Os títulos dos capítulos deve ser no meio da pagina, exemplo: Resumo, deve ser no meio da pagina A numeração das paginas só deve aparecer na introdução mas contar a partir da 1 pagina. Cordialmente. Ana Luiza Holme 37993492 on 2016-06-20T12:26:58Z (GMT) / Submitted by Rodrigo Marcolino (rtmarcolino@gmail.com) on 2016-06-25T17:38:50Z No. of bitstreams: 1 estrategia-marcolino_Final2.pdf: 891158 bytes, checksum: dbf4a01e9e4627f7069d051ed8e84c50 (MD5) / Rejected by Ana Luiza Holme (ana.holme@fgv.br), reason: Rodrigo, Favor retirar os dizeres Dissertação do Mestrado profissional das paginas 2 e 4. Os dizeres abstract deve ser no meio da pagina. Cordialmente. Ana Luiza 37993492 on 2016-06-27T12:05:53Z (GMT) / Submitted by Rodrigo Marcolino (rtmarcolino@gmail.com) on 2016-06-29T17:36:38Z No. of bitstreams: 1 estrategia-marcolino_Final.pdf: 889894 bytes, checksum: f45b71c3505b0a4fa8b1c493c9dafbca (MD5) / Approved for entry into archive by Ana Luiza Holme (ana.holme@fgv.br) on 2016-06-29T17:40:12Z (GMT) No. of bitstreams: 1 estrategia-marcolino_Final.pdf: 889894 bytes, checksum: f45b71c3505b0a4fa8b1c493c9dafbca (MD5) / Made available in DSpace on 2016-06-29T17:41:39Z (GMT). No. of bitstreams: 1 estrategia-marcolino_Final.pdf: 889894 bytes, checksum: f45b71c3505b0a4fa8b1c493c9dafbca (MD5) Previous issue date: 2016-05-12 / The market for distributed generation of solar PV is yet in an early stage of development in Brazil. The recent regulatory environment, however, points to a change in this scenario: the latest revisions of the applicable regulation brought increased economic feasibility of projects in the sector. This, along with the presence of abundant solar resource in Brazil and the present stage of development of PV technology indicate a possible increase in the penetration of the source in the country in the coming years. In this context, this study aims to analyze which resources and capabilities the company Axis Renováveis must have to achieve a competitive advantage position, through the RBT lenses. The company that was selected for this single-case study is a start-up in the sector. It is expected that, at the end of the work, the conclusions have direct implications on the company's strategy and can serve as a starting point for others in the industry. / O mercado de geração distribuída de energia solar fotovoltaica apresenta-se em estágio inicial de desenvolvimento no Brasil. A recente conjuntura regulatória, entretanto, aponta para a mudança deste cenário: as últimas revisões da regulação aplicável trouxeram aumento na viabilidade econômica de projetos no setor. Isto, somado à presença abundante de recurso solar no Brasil e ao presente estágio de desenvolvimento da tecnologia fotovoltaica indicam um possível crescimento da penetração da fonte no país nos próximos anos. Nesse contexto, o presente estudo tem como objetivo analisar quais recursos e capacidades a empresa Axis Renováveis deve possuir para alcançar uma posição de vantagem competitiva, à luz do RBT. A empresa selecionada para a condução do estudo de caso único é uma start-up atuante no setor. Espera-se que, ao final do trabalho, as conclusões tenham implicação direta na estratégia da empresa e possam servir como ponto de partida para outras empresas do setor.
99

Avaliação de locais com potencial para a implantação de geração distribuída sob a perspectiva do desenvolvimento sustentável

Lima, Gracieli Sartório Cardoso de January 2015 (has links)
Orientadora: Profa. Dra. Patrícia Teixeira Leite Asano / Tese ( doutorado)- Universidade Federal do ABC. Programa de Pós-Graduação em Energia, 2015. / A geração distribuída é a produção de energia elétrica conectada à rede de distribuição, o que caracteriza uma geração de energia descentralizada, próxima aos centros de carga e geralmente com menor potencial quando comparada à centralizada. Essa configuração é explorada em alguns países e demonstra potencial de aplicabilidade, cujo planejamento pode direcionar o desenvolvimento econômico com contribuições sociais e redução de impactos ambientais. No Brasil, no entanto, sua disseminação ainda é limitada, principalmente por implicar em grandes mudanças no atual modelo praticado pelo setor elétrico brasileiro. Desta forma, com o intuito de incentivá-la e cooperar com a elaboração de uma ferramenta de auxílio à tomada de decisão na implantação da geração distribuída, este trabalho de pesquisa tem o objetivo de desenvolver uma metodologia de avaliação de locais com potencial para a instalação de geradores distribuídos, ponderando aspectos de desenvolvimento sustentável, ou seja, com base na integração de parâmetros econômicos, ambientais e sociais. A integração dos conceitos de desenvolvimento sustentável e geração distribuída foi feita através de indicadores de sustentabilidade e matriz de interdisciplinaridade. E por se tratar de um problema com diversas variáveis, utilizou-se métodos de avaliação multicritério, como a Combinação Linear Ponderada e a Média Ponderada Ordenada. Para que fosse possível o tratamento de parâmetros com características espaciais, trabalhou-se com um sistema de informação geográfica. A metodologia foi aplicada ao estado de São Paulo, para a identificação de municípios com potencial para a instalação de geradores eólicos como geração distribuída, baseando-se em critérios de avaliação nas três dimensões de sustentabilidade. / Understanding modern problems, such as sustainable development, requires an interaction between different dimensions of a system and not just solutions in the economic field. Such asthe expansion of the electric power supply that requires an interdisciplinary approach, withmultiple interrelated parameters. The pattern of electricity consumption in each country is strongly related to its economic growth. Since this is still among the major goals of the nations, the search for higher power supply capacity is continuous. However, there is an interrelationship between electricity production and environmental impacts, whether in the extraction of primary energy resources, in deposition or emission of waste during the production of electricity or in building power supply plants, including associated social impacts. In this sense, there is the need to seek planning solutions aimed to meet the demand in a way that does not limit economic development, and at the same time has less aggressive effects on the environment and society. In this context, the aim of this paper is to present an evaluation methodology to point places with potential for the installation of distributed generators, seeking to contemplate aspects of economic, environmental and social dimension. The methodology was applied to find suitable locations for the wind generation in Sao Paulo municipalities. Evaluation variables were selected from the bibliographical study of sustainable development and sustainability indicators within the scope of energy. Among them there are: the availability of local energy resource, the presence of environmental preservation areas, the need for availability of electricity in regions with greater social difference, and access to the grid. These evaluation criteria have been worked through multicriteriaanalysis such as: Weighted Linear Combination and Ordered Weighted Average, and the spatial variables involved were treated through a Geographic Information System. This methodology can contribute to the development of a tool to aid institutions in the expansion planning of the electricity sector under the sustainable development perspective.
100

Projeto de sistema supervisório aplicado ao conversor matricial indireto em geração de energia elétrica baseada em microturbina

Romero, Javier Alexis Andrade January 2016 (has links)
Orientador: Prof. Dr. Marat Rafikov / Tese ( doutorado)- Universidade Federal do ABC. Programa de Pós-Graduação em Energia, 2016.

Page generated in 0.0997 seconds