• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 336
  • 14
  • 12
  • 3
  • Tagged with
  • 366
  • 366
  • 251
  • 211
  • 72
  • 56
  • 50
  • 48
  • 41
  • 38
  • 37
  • 35
  • 35
  • 34
  • 32
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
111

Um modelo para o incentivo da transferência de conhecimentos entre equipes de desenvolvimento de produtos

Frank, Alejandro Germán January 2012 (has links)
Esta tese fundamenta-se na necessidade que as empresas têm de aproveitarem os conhecimentos gerados nos projetos de produto de maneira que possam ser reutilizados em novos projetos a serem desenvolvidos, reduzindo assim esforços de desenvolvimento e melhorando o potencial inovador das equipes de produtos. Neste sentido, assume-se que existem fatores próprios do processo de desenvolvimento de produtos que podem ajudar a incentivar a TC. Porém muitos desses fatores e suas relações com outros fatores são pouco aprofundadas na literatura acadêmica. Em razão disso, esta tese propõe desenvolver um modelo para o incentivo da transferência de conhecimentos (TC) entre equipes de desenvolvimento de produto baseado na explicação das relações existentes entre os diversos fatores que influenciam a TC. A proposta desta tese está baseada em uma abordagem de pesquisa que combina aspectos qualitativos (como grupos focados, entrevistas e estudos de caso) e quantitativos (como pesquisas survey com análise multivariada de dados) aplicados em diferentes empresas (cerca de 80 nas etapas de levantamento e cinco nas etapas de aprofundamento). Por meio da utilização desses métodos obtiveram-se os seguintes resultados: (i) a proposição de um novo modelo para as etapas do processo da TC, baseado no estudo comparativo dos modelos existentes na literatura, que ajuda a entender como ocorre a TC desde o momento em que um conhecimento é reconhecido como útil para outros projetos até o momento em que o mesmo é aplicado em um novo projeto; (ii) a construção de uma taxonomia que classifica os fatores da TC em diferentes categorias, ajudando a entender melhor como os mesmos estão organizados; (iii) o estudo das características do contexto das empresas que define a prioridade que estas atribuem aos diferentes fatores da TC; (iv) a proposição de um modelo para os relacionamentos entre os fatores, que explica de maneira sistêmica a interação que ocorre entre os mesmos e (v) a proposição de um modelo para o relacionamento entre os fatores e as etapas da TC, que explica quais fatores agem de maneira direta ou indireta sobre as diferentes etapas da TC. Do ponto de vista acadêmico, os resultados ajudam a expandir o entendimento teórico sobre a TC no desenvolvimento de produtos, seguindo a corrente teórica da inovação contínua; e (ii) do ponto de vista profissional, os resultados permitem direcionar ações de melhoria da TC entre projetos, focalizando especificamente nas necessidades particulares de cada empresa. / This thesis proposes a model to foster knowledge transfer (KT) between new product development (NPD) teams. This proposal is based on companies’ need for taking advantage of knowledge generated in prior product projects by reusing it in new projects, thus reducing development efforts and improving team innovativeness. In this sense, this thesis assumes that there are organizational factors that present a general pattern of behavior and that can help to foster KT in NPD. However, an important challenge is to understand how these factors influence KT. Thus, the proposed model explains the relationships that exist among KT influence factors, as well as the relationships between these factors and the KT process stages. Furthermore, this thesis studies such relationships given different companies’ characteristics. This proposal is based on a mix-method research approach by combining qualitative studies (e.g. focus group, individual interviews, and study cases) and quantitative studies (e.g. surveys with multivariate data analysis) applied to different companies (circa 80 in the survey stage and five in the case studies). The following results were obtained, which contributed to the general proposal of the thesis: (i) a new model that explains KT process stages, based on a comparative study of prior models proposed in the academic literature; (ii) a taxonomy for KT influence factors; (iii) an analysis of firm contextual characteristics that help define the influence factors priorities; (iv) a model that explains the relationships among KT influence factors; and (v) a model that explains the relationship between KT influence factors and KT process stages. Considering these results, two main contributions of this thesis are highlighted: (i) from the academic point of view, results obtained help to extend the theoretical understanding about KT in NPD, based on the continuous innovation theoretical stream; (ii) from the practical point of view, results obtained allow to guide KT improvement in NPD, focusing on the specific needs of each company.
112

Modelo de implantação da estratégia através do uso combinado do método Hoshin Kanri e do gerenciamento de projetos

Pavão, Rafael January 2013 (has links)
Esta dissertação propõe um modelo de implantação da estratégia através do método Hoshin Kanri, combinado ao gerenciamento de projetos, para organizar os processos do desdobramento das diretrizes e iniciativas, aumentando, desta forma, o sucesso na execução da estratégia empresarial. Elaborar a estratégia é um passo importante, contudo não basta ter um bom plano, é preciso executá-lo com sucesso, desenvolvendo as iniciativas certas, dentro do prazo e no custo necessário para atingir os objetivos estratégicos. Neste contexto, as empresas que detém uma metodologia consistente, para definição do plano de projeto de iniciativas estratégicas, podem minimizar os riscos de não alcançarem seus objetivos. Desta forma, é apresentada uma revisão bibliográfica sobre o método Hoshin Kanri e o gerenciamento de projetos. Também é proposto um modelo composto de cinco passos, utilizando elementos de cada método e aplicado com sucesso em uma agroindústria, evidenciando que é possível implementar a estratégia por meio do uso combinado do Hoshin Kanri e do Gerenciamento de Projetos. / This dissertation aims to propose a model for the management of strategy implementation through the Hoshin Kanri method, combined with project management, to organize the processes of policy deployment and initiatives, increasing thus the successful execution of business strategy. Develop a strategy is an important step, but not enough to have a good plan, you need to run it successfully, developing the right incentives, on time and cost necessary to achieve the strategic objectives. In this context, companies that hold a consistent methodology for defining the project plan of strategic initiatives can minimize the risk of not achieving their goals. Thus, we present a literature review on the Hoshin Kanri method and projects management. Also proposed is a model consists of five steps, using elements of each method and successfully applied in an agro-industry, showing that it is possible to implement the strategy through the combined use of Hoshin Kanri and Project Management.
113

Desenvolvimento de um modelo para implantação gradual dos princípios de IPD e práticas de LPDS na gestão de projetos de instalações da indústria de base brasileira / Development of a model for the gradual implementation of IPD principles and LPDS practices in the management of industrial capital projects in Brazil

Ioppi, Vinícius January 2015 (has links)
A abordagem tradicional de gestão de projetos trata como similares todos os projetos, sem considerar o contexto de cada um, e carece de uma fundamentação teórica mais ampla e aprofundada. Nesta abordagem, projetos mais complexos, nos quais, muitas vezes, as soluções somente emergem ao longo do projeto, são gerenciados da mesma forma que projetos simples, com objetivos claros e soluções evidentes. Como consequência, os projetos, em sua maioria, não têm atingido seus propósitos, deixando assim de agregar valor às organizações, além de gerar litígios entre clientes e empresas executoras. Alternativamente à abordagem tradicional, o presente trabalho abordou um modelo de Sistema de Gestão de Projeto (SGP) para os projetos de instalações industriais baseado nos princípios de Integrated Project Delivery (IPD), associado às práticas de Lean Project Delivery System (LPDS) e termos comerciais voltados a contratos relacionais. É uma forma de gerir projetos de maneira mais colaborativa entre as partes, através da construção de times integrados, compartilhamento de riscos e benefícios, redução das perdas no processo e geração de valor. Inicialmente, o presente trabalho buscou caracterizar as práticas correntes da gestão de projetos de instalação industrial, por meio de um estudo de caráter exploratório realizado numa indústria de base. Posteriormente, foram realizadas entrevistas com agentes chaves de clientes e executores, com o objetivo de coletar a experiência destes agentes com as práticas correntes. Adicionalmente às entrevistas, foram realizados dois estudos de caso breves em projetos de construção. Através da análise das entrevistas e casos estudados, foi possível levantar as principais barreiras e oportunidades para implantação desta nova abordagem no contexto industrial brasileiro. Por fim, o presente trabalho desenvolveu um modelo para a implantação gradual desta nova abordagem para gestão dos projetos de instalações da indústria de base, levando em consideração o contexto atual e o patamar a ser alcançado. / The traditional project management approach treats projects similarly without enough consideration of the context, and needs a broader and deeper theoretical foundation. In this approach, complex projects, in which solutions only emerge along the process, are managed similarly to simple projects, which have clear objectives and known solutions. Moreover, processes are assumed to be sequential and fragmented, and being divided in many small parts. Consequently, the majority of projects do not achieve their purposes, being ineffective in terms of generating value for stakeholders, and there is often litigation between client and contractors. As an alternative to the traditional approach, this study discusses a new form of Project Delivery System (PDS) to be used in industrial installation projects, based on Integrated Project Delivery (IPD) principles, associated with Lean Project Delivery System (LPDS) practices, and the commercial terms of relational contracts. In this PDS, project management is based on collaboration and integration among parts, and risks and benefits are shared, reducing process waste and improving value generation. Initially, this study sought to understand the existing project management practices in industrial installation projects, through an exploratory study on a base industry. Then, a set of interviews was carried out with key stakeholders, such as clients and subcontractors, with the aim of collecting data about their experience with existing practices. Additionally, two brief case studies in construction projects that had some innovative project management practices were undertaken. Based on the interviews and cases studies, the main barriers and opportunities for use the new PDS approach in the Brazilian industrial context were identified. Finally, a model for the gradual implementation of the proposed PDS in base industry projects was built, considering the current state and the desired state of project management practices.
114

Gestão de projetos estratégicos: um estudo de caso. / Strategic projects management: a case study.

Oliveira, Alexandre Ferreira de 15 March 2007 (has links)
Este trabalho trata de questões relativas à gestão dos projetos associados com a implementação do planejamento estratégico das empresas. Embora nos dias atuais o planejamento estratégico seja uma ferramenta essencial para auxiliar as empresas a estabelecer, sustentar e ampliar suas vantagens competitivas, pesquisas mostram que sua implementação é bastante deficiente, sendo um dos principais problemas a falta de estrutura e metodologias adequadas para gerenciar a execução dos projetos estratégicos definidos a partir do planejamento. Os objetivos do presente trabalho são, através de um estudo de caso, elucidar em que aspectos - e de que forma - o gerenciamento de projetos estratégicos pode ser aprimorado e contribuir para a compreensão das principais questões e problemas relacionados à implementação e gestão deste tipo de projeto. O estudo de caso foi realizado numa empresa de manufatura da área de tecnologia de informação onde apenas 50% dos projetos estratégicos são concluídos e atingem o objetivo esperado. Neste estudo realizou-se na empresa o levantamento dos processos de planejamento estratégico, de gerenciamento dos projetos estratégicos, dos resultados destes projetos, dos fatores críticos para o sucesso na implementação dos mesmos e da maturidade e excelência nas práticas de gestão de projetos. Com a análise dos dados levantados na pesquisa concluiu-se que, apesar da empresa possuir uma pequena estrutura dedicada ao gerenciamento dos projetos estratégicos, a falta de uma metodologia melhor estruturada para este gerenciamento era a principal responsável pelo baixo índice de sucesso na execução dos projetos. A partir das análises dos dados coletados e das conclusões tiradas a respeito das principais deficiências presentes nos processos de gerenciamento apresenta-se no trabalho uma proposta preliminar para a estrutura básica de uma metodologia para gerenciamento dos projetos estratégicos da empresa estudada, com o objetivo de sanar ou minimizar as deficiências gerenciais encontradas. / This research handle themes related to project management associate with strategic planning implementation in the companies. Although in the current days the strategic planning is an essential tool to aid the companies to establish, to sustain and to enlarge their competitive advantages, researches show that implementation is quite deficient, being one of the main problems the structure lack and appropriate methodologies to manage the execution of the defined strategic projects starting from the planning. The objectives of the present work are, through a case study, to elucidate in which aspects - and which form - the management of strategic projects can be perfected and to contribute for the understanding of the main subjects and problems related to the implementation and management of this kind of project. The case study was accomplished in a manufacturing company of information technology area where only 50% of the strategic projects are ended and reached the expected objective. In this study was performed in the company a survey of the processes of strategic planning, management of strategic projects, results of these projects, critical factors for the success in the implementation and maturity and excellence in the practices of projects management. With the analysis of the data in the research was concluded that, in spite of the company has a small structure dedicated to the management of the strategic projects, the lack of a better structured methodology for project management was the main responsible for the low success index in the execution of the projects. Starting from the analyses of the collected data and of the conclusions regarding the main present deficiencies in the management processes, shows up in the work a preliminary proposal for the basic methodology structure for management of the strategic projects of the studied company, with the objective of to cure or to minimize the found managerial deficiencies.
115

Gerenciamento de riscos em projetos na indústria da construção no Estado do Rio Grande do Sul

Albarello, Cristiane Botezini January 2014 (has links)
A indústria da construção é significativa para o desenvolvimento socioeconômico dos países em âmbito mundial e o gerenciamento de projetos consiste na principal atividade das empresas de distintos segmentos que integram o setor. No entanto, caracteriza-se por elevada exposição a riscos de diversas naturezas, os quais influenciam diretamente o sucesso dos projetos, havendo evidências de que práticas de gerenciamento de riscos formais não têm sido efetivamente adotadas pelas empresas. Este estudo apresenta os resultados de uma pesquisa survey, a partir da análise de 178 questionários respondidos no período de novembro de 2013 a março de 2014. A pesquisa objetivou analisar o gerenciamento de riscos nas empresas da indústria da construção, no Estado do Rio Grande do Sul, para compreender a exposição em projetos, propondo três objetivos específicos: conhecer a atitude frente aos riscos das empresas participantes, para compreender a exposição em projetos de construção com base na teoria da utilidade; identificar se as empresas participantes gerenciam riscos de maneira formal ou informal, a fim de verificar as práticas, os processos e as técnicas frequentemente aplicados; explicitar os principais riscos enfrentados nos projetos de construção, no cenário atual e na percepção das empresas participantes. Houve, pelo menos, duas justificativas para a realização deste estudo: a adoção de práticas formais no gerenciamento de riscos tem sido referenciada como cada vez mais emergente para a indústria da construção; e pesquisas survey sobre gerenciamento de riscos em projetos são relevantes para prover informações significativas tanto de interesse científico acadêmico quanto para o contexto da prática empresarial. A partir da análise dos resultados, confirmou-se na literatura especializada estudada que a indústria da construção tende a perceber riscos como efeitos negativos no desempenho dos projetos. A atitude da amostra, frente aos riscos, mostrou-se neutra, tendendo à ousadia, havendo maior motivação das empresas para exporem-se a situações arriscadas diante da percepção de margens de ganho mais elevados nos contratos, ao passo que as empresas demonstraram menor tolerância diante da percepção de maiores perdas nos contratos. A maioria das empresas participantes sinalizou adotar gerenciamento informal de riscos, embora contrapondo à literatura estudada, menos da metade destas sinalizaram adotar alguma reserva de contingência orçamentária para os riscos dos projetos de construção. Das empresas que sinalizaram adotar gerenciamento formal de riscos, evidenciou-se que, em geral, há baixa frequência de aplicação de práticas, processos sistematizados e técnicas de gerenciamento de riscos, conforme recomendam os principais documentos referenciados na área. Identificou-se, ainda, que os fatores de riscos de maior probabilidade e impacto nos projetos, no cenário atual e na percepção das empresas amostradas, consistiram em: dificuldades na regulamentação ambiental; falhas na garantia da segurança do trabalho; e escassez de profissionais e/ou profissionais qualificados. Além de que, os maiores níveis de riscos inerentes à complexidade dos projetos em execução foram atribuídos aos elementos: experiência profissional; restrição extrema de tempo; e número de partes e interdependências. / The construction industry is significant for the socioeconomic development of countries worldwide, and managing projects is the main commercial activity of different segments comprising the business sector. However, it is characterized by high exposure to risks of various natures, which influence directly the success of the projects. Besides, it has been evident that management practices of formal risks have not been effectively adopted by companies. This study presents the results of a survey from the analysis of 178 questionnaires answered from November, 2013 to March, 2014. This paper analyzes the risk management projects in the construction industry in the state of Rio Grande do Sul, proposing three specific objectives: to know how companies react from the risks, in order to understand their exposure to construction projects based on the theory of utility; to identify if the participating companies manage the risks formally or informally, in order to check the practices, processes, and techniques frequently applied; to explain the main risks faced in building projects in the current scenario and the perception of the participating companies. There were, at least, two reasons for this study: the adoption of formal practices in risk management has been referenced as more and more emerging for the construction industry; besides, surveys on risk management in projects are pertinent to provide relevant information, as for the academic field as for businesses. However, little has been done in the Brazilian construction industry. The analysis of the results confirmed the theory studied, that is, that the construction industry tends to perceive risks as negative effects on project performance. The attitude of the sample proved to be neutral, almost daring, with greater motivation of companies to expose themselves to risky situations on the perception of higher profit from the contracts, while less tolerant when facing larger losses. Most participating companies signaled to adopt informal risk management, although, in contrast to the theory, less than half of those, signaled to adopt reserve of budget contingency for the risks. The companies which adopted formal risk management confirmed, in general, the low frequency of practices, processes and techniques of systematic risk management, as recommended by the related literature. It was also found that the risk factors of highest probability and impact on the projects, in the current scenario, and in the perception of the sampled companies were: difficulties in environmental regulation; failures in ensuring safety; and shortage of professional and/or qualified workforce. Apart from that, the highest levels of risk inherent in the complexity of projects in execution were assigned to the following elements: professional experience, extreme time constraint, and number of parts and interdependencies.
116

Gestão de projetos de pesquisa e o princípio da eficiência na importação de equipamentos: o caso da Fundação Universidade Federal do Vale do São Francisco – Brasil

Bagagi, Leone Coelho 16 May 2016 (has links)
Submitted by Tatiana Lima (tatianasl@ufba.br) on 2016-08-08T21:51:18Z No. of bitstreams: 1 Bagagi, Leone Coelho.pdf: 2302463 bytes, checksum: 299b57fbb28fdf1d6ea2abac2a0ae6fa (MD5) / Approved for entry into archive by Maria Angela Dortas (dortas@ufba.br) on 2016-08-12T20:12:32Z (GMT) No. of bitstreams: 1 Bagagi, Leone Coelho.pdf: 2302463 bytes, checksum: 299b57fbb28fdf1d6ea2abac2a0ae6fa (MD5) / Made available in DSpace on 2016-08-12T20:12:32Z (GMT). No. of bitstreams: 1 Bagagi, Leone Coelho.pdf: 2302463 bytes, checksum: 299b57fbb28fdf1d6ea2abac2a0ae6fa (MD5) / Este trabalho objetiva analisar a gestão de projetos de pesquisa e inovação no processo de importação de equipamentos para fomentar e apoiar a pesquisa na Fundação Universidade Federal do Vale do São Francisco, enfocando o princípio da eficiência. Trata-se de um estudo de caso único, no qual foram utilizadas como técnicas de coleta de dados: pesquisa documental, observação não participante e entrevistas semiestruturadas com gestores e professores/pesquisadores. Foi realizada análise de conteúdo com auxílio do software Nvivo. Os resultados revelam que a gestão de projetos de pesquisa e inovação na universidade se caracteriza pelo desenvolvimento de pesquisas com recursos próprios, mediante editais internos e aqueles apoiados financeiramente por agências federais e estaduais de fomento. As suas ações correspondem à capacitação e à difusão do conhecimento por meio de publicações dos trabalhos científicos e registro de patentes. No que se refere ao alcance do princípio da eficiência no processo de importação de equipamentos, para o desenvolvimento de pesquisa científica e tecnológica, foram encontrados limites relativos aos entraves nos sistemas administrativos e jurídicos legais, falta de núcleo de apoio à gestão de projetos e insuficiência de recursos financeiros e humanos. Como proposição, apresenta-se a criação de um núcleo de apoio à gestão de projetos de pesquisa para suporte aos pesquisadores e ampliação da captação dos recursos, por meio da diversificação das fontes de financiamentos e das redes de relacionamentos com as fundações de apoio e outras instituições, para atenuar ou elidir as limitações identificadas. / This study aims to analyze management of research and innovation projects in equipment import process to foment and support the research in Vale do São Francisco University, focusing on efficiency principle. This is a single case study, in which were used data collection techniques: documental research, non-participant observation and semi-structured interviews with managers and professors/researchers. Content analysis was performed using NVivo software. The results show that management of research projects and innovation at the university is characterized by research development with its owns resources, through internal notices and those financially supported by federal and state funding agencies. The actions correspond to training and dissemination of knowledge through publications of scientific papers and patent registration. Regarding the scope of efficiency principle in equipment import process for development of scientific and technological research, were found limits in administrative and legal systems, lack of core support for project management and financial and human resource failures. As a proposition, it shows the creation of a core of support for research project management to support researchers and expansion of funding raising, through diversification of sources of funding and relationships with support foundation networks and other institutions to mitigate or circumvent the limitations identified.
117

Sistematização da gestão de portfólio na fase de planejamento estratégico de produtos

Moeckel, Alexandre 24 October 2012 (has links)
Tese (doutorado) - Universidade Federal de Santa Catarina, Centro Tecnológico, Programa de Pós-Graduação em Engenharia Mecânica, Florianópolis, 2009. / Made available in DSpace on 2012-10-24T06:51:55Z (GMT). No. of bitstreams: 1 272136.pdf: 6090700 bytes, checksum: 9eae821f0329eebdd46659158cca411d (MD5) / O objetivo deste trabalho é sistematizar conceitos e práticas para apoiar a gestão da informação na fase de planejamento estratégico de produtos, notadamente na gestão de portfólio. Neste contexto é comum a tomada de decisões de grande impacto sem o devido entendimento, seja pelo acesso à informação de baixa qualidade, por desconhecimento de causa ou imposição de idéias. A pesquisa tem natureza aplicada, abordagem qualitativa, quanto aos objetivos é descritiva, e quanto aos procedimentos técnicos caracteriza-se como levantamento. Foram envolvidos profissionais de planejamento e gestão de projetos, de listas de discussão em maioria vinculadas a capítulos brasileiros do Project Management Institute (PMI). É analisada a conjuntura das fases iniciais do processo de desenvolvimento de produtos; são identificados requisitos de uma estrutura de apoio ao pré-desenvolvimento de produtos, bem como recursos de groupware aplicáveis a esta macrofase; verifica-se como se dá o planejamento estratégico de produtos e a gestão de portfólio em empresas brasileiras, com atenção especial para os aspectos qualidade da informação, gestão do conhecimento e colaboração; e são propostas adequações nas atividades realizadas na fase de planejamento estratégico de produtos e nos processos envolvidos na gestão de portfólio. A essência das propostas foi avaliada e aprovada, por meio de enquete associada à navegação por um ambiente Web, que foi implementado para descrever o conteúdo envolvido. Dentre as contribuições originais deste trabalho, merece destaque a consideração da qualidade da informação no contexto decisório do planejamento estratégico de produtos, tendo em vista que o problema de acessar informação insuficiente, equivocada ou desatualizada é pouco abordado na literatura sobre o desenvolvimento de produtos.
118

O projeto do sistema de produção no contexto de obras complexas / Production system design in the context of complex projects

Rodrigues, Alana Araújo January 2006 (has links)
A complexidade dos empreendimentos da construção civil tem sido abordada por diversos autores. Ao contrário da visão tradicional de que estes empreendimentos têm características predominantemente lineares, previsíveis e que seus processos podem ser gerenciados de forma independente, a noção de complexidade traz uma nova luz à gestão da construção. Assim, os empreendimentos da construção devem ser entendidos como compostos por um grande número de processos, inter-relacionados, nos quais melhorias isoladas não resultam normalmente em melhorias substanciais do todo. Neste contexto, o projeto do sistema de produção (PSP), é um processo gerencial que pode contribuir para melhorar o desempenho de empreendimentos de construção, devendo anteceder a etapa de produção. Entretanto, na indústria da construção, esta atividade é pouco difundida, sendo em geral desconsiderada nos empreendimentos. O objetivo geral desta dissertação é propor um modelo de projeto do sistema de produção (PSP) levando em consideração as características complexas dos empreendimentos. O método de pesquisa foi dividido em três etapas. Inicialmente foi realizado o estudo exploratório, cujo objetivo foi obter um melhor entendimento dos empreendimentos estudados. A segunda etapa envolveu quatro estudos empíricos, cujo objetivo foi desenvolver o projeto do sistema de produção para diferentes fases dos empreendimentos, analisar as vantagens e dificuldades da implementação do PSP, assim como analisar a relação entre o PSP e o planejamento e controle da produção. Na etapa final foi proposto um modelo de projeto do sistema de produção no contexto de obras complexas. Nesta etapa também foram discutidos o escopo de decisões do PSP e as ferramentas utilizadas. Entre as principais conclusões deste estudo está a necessidade de antecipar a elaboração do PSP, iniciando ainda na fase de orçamento. O PSP não deve ser deve ser excessivamente detalhado no início do empreendimento, sendo necessária a sua revisão ao longo da etapa de produção, à medida que mais informações tornam-se disponíveis. Dessa forma, o PSP apóia a tomada de decisões relativas à organização da produção e suas decisões servem como informações de entrada para o planejamento e controle da produção (PCP). / The complexity of construction projects have been discussed by many authors. In opposition to the traditional view that those projects are linear and predictable, and that their processes can be managed separately, the notion of complexity cast a new light into construction management. Therefore, construction projects should be seen as composed by a large number of interrelated processes, in which isolated improvements do not usually bring major improvements on the whole. Production System Design is a managerial process that can contribute for improving the performance of construction projects, It should be carried out before the production stage. However, this activity is not widely disseminated in the construction industry and it is neglected in most projects. The objective of this dissertation is to propose a model for the Production System Design (PSD), considering the inherent complexity of construction projects. The research method was divided into three stages. In the first stage, an exploratory study was undertaken aiming to improve the understanding of the types of construction projects to be investigated. The second stage consisted of four empirical studies, in which the production system design for different project phases were produced, and the advantages and difficulties for its implementation were analyzed. Moreover, the relationship between the production system design and the production planning and control process was investigated. In the final stage of the study, a model for designing production systems in complex projects was proposed, including the definition of its scope and the tools that can be used. This research work suggests that there is a need to carry out the production system design before the cost estimating phase. Such design should not be detailed in the early stages of the project, and ought to be revised during the production stage, as more information is made available. Moreover, the production system design supports the decision making process related to the organization of production and provides input information for production planning and control
119

Proposta de metodologia para identificação de oportunidades de projetos destinada a organizações sociais

Silveira, Patrícia da January 2007 (has links)
O foco da pesquisa consiste em identificar oportunidades e propor projetos no âmbito das organizações sociais. A partir da revisão literária, foi possível estabelecer uma metodologia contemplando elementos identificados no contexto social. Através da aplicação da metodologia em uma organização comunitária, foi feita a revisão e o aprimoramento da proposta. A proposta está estruturada em dez etapas, agrupadas em quatro macro-etapas: (i) planejamento das etapas, (ii) coleta de informações, (iii) identificação de oportunidades e ( iv) concepção de projetos. O estudo aplicado contemplou a utilização de instrumentos de coleta de informações como questionários, entrevistas em profundidade e grupos focados. As informações coletadas originaram oportunidades de projetos que foram priorizadas e, por sua vez, geraram seis propostas de projetos. As conclusões revelaram que a metodologia apresentada oferece uma visão mais completa dos elementos a serem considerados na concepção de projetos voltados a organizações sociais e viabiliza o envolvimento maciço dos membros destas organizações. / The focus of this research consists of identifying opportunities into projects of development in the scope of social organizations. From a literature review, it was possible to establish a methodology considering elements identified in the social context. The revision and improvement of the proposal was performed through the application of the methodology in a communitarian organization. The proposal is structuralized in ten stages, grouped at four macro-stages: (i) planning of the stages, (ii) collection of information, (iii) identification of opportunities and (iv) conception of projects. The applied study was conducted using instruments of data collection of information, such as questionnaires, individual interviews and focus groups. The collected information originated project opportunit ies that were prioritized and, in turn, generated six proposals of projects. The conclusions disclosed that the presented methodology offers a more complete vision of the elements to be considered in the conception of projects orientated to social organizations and makes possible the massive involvement of the members of these organizations.
120

Modelo econômico-probabilístico de análise de risco em projetos de TI

Miorando, Rogerio Feroldi January 2010 (has links)
Esta tese apresenta um modelo econômico-probabilístico de análise de risco para projetos de TI que busca integrar a análise de riscos à análise econômica dos projetos. Este trabalho pretende atender uma carência observada na literatura referente a modelos de análise de risco para projetos de TI que avaliem o impacto econômico dos fatores de risco envolvidos. Para tanto, o modelo busca quantificar o valor e a probabilidade de possíveis desvios do fluxo de caixa, fornecendo uma análise econômico-probabilística dos retornos esperados para o projeto. São identificadas as principais categorias e fatores de risco envolvidos em projetos de TI e os mesmos são associados aos grupos do fluxo de caixa, estabelecendo uma estrutura de avaliação do impacto econômico dos fatores de risco e suas probabilidades de ocorrência. A partir do preenchimento da estrutura de avaliação, é realizado o cálculo dos valores dos grupos do fluxo de caixa e do valor presente líquido do projeto ajustados ao risco, através do uso de simulação estocástica. O modelo fornece como resultado a distribuição de probabilidade para o resultado econômico do projeto. A aplicação do modelo é ilustrada através da análise de um projeto de desenvolvimento de um sistema ERP. O uso do modelo proposto forneceu o retorno econômico do projeto ajustado ao risco, através da distribuição de probabilidades para o seu VPL, e a variabilidade que cada fator de risco analisado provoca no retorno do projeto. Após a avaliação do projeto original, seguindo os princípios de Opções Reais, o modelo também avaliou uma opção alternativa de condução do projeto, que permitiu aumentar seu valor médio e reduzir o risco associado. / This thesis presents an economic probabilistic model of risk analysis for IT projects. The proposed model combines risk analysis and economic analysis of the projects. This work intends to fill in a gap observed in the literature regarding models for IT projects risk analysis that assess the economic impact of the risk factors involved. The proposed model aims to quantify the value and the probability of possible cash flow deviations, providing an economic-probabilistic analysis of returns expected from the project. The main categories and risk factors involved in IT projects are identified and associated with cash flow groups, establishing a structure for the economic impact assessment of risk factors and their probability of occurrence. Supported by the proposed structure of evaluation, the calculation of the values of the cash flow groups and the project net present value (NPV), adjusted to the risk, is performed using stochastic simulation. As a result, the model provides the probability distribution for the economic result of the project. The application of the model is illustrated through the analysis of a project for an ERP system development. The use of the proposed model provided the economic return of the project adjusted to the risk (through the probability distribution of its NPV) and the variability that each risk factor analyzed causes in the return of the project. After the evaluation of the original project, following the principles of Real Options, an alternative option for the conduction of the project was also evaluated using the proposed model. The alternative allowed the increase of its average value and the decrease of the associated risk.

Page generated in 0.0693 seconds