Spelling suggestions: "subject:"gestão por processo"" "subject:"festão por processo""
1 |
Gerenciamento por processos na administração pública : o caso da UFSCarPaula, Vérica Marconi Freitas de 27 June 2008 (has links)
Made available in DSpace on 2016-06-02T19:51:36Z (GMT). No. of bitstreams: 1
1867.pdf: 2536498 bytes, checksum: 028bb5763cce118bdc77627f4c802cf1 (MD5)
Previous issue date: 2008-06-27 / The focus on management practices - especially the ones that improve the fulfillment of the
demands and needs of people involved with the organization - has grown due to the increase
in competition, causing changes in the organizations conventional way of working. In the
public sector, management has been modified and still is. Literature shows that the present
model of Public Management does not fulfill completely the needs and growing demands of
the citizens. As a consequence, it is possible to find some areas in which managerial practices
have already been adopted. Therefore, this study analyses the viability of applying the
strategy of management by processes in Public Management. This strategy has been applied
to private companies with strong positive results. The empirical part of the study was
developed at UFSCar (Federal University of São Carlos), aiming at identifying the present
context and the main aspects (favorable or not) involved in introducing the strategy of
management by processes in four selected processes. / A atenção a práticas gerenciais, especialmente as que podem auxiliar na melhoria do
atendimento às demandas dos envolvidos com a organização, foi impulsionada pelo
acirramento da concorrência, acarretando mudanças na forma convencional de trabalhar das
organizações. No que se refere ao setor público, sua gestão também foi e continua sendo
modificada. A literatura indica que, de maneira geral, o modelo atual da Administração
pública não atende às necessidades e demandas crescentes dos cidadãos em sua plenitude. Em
decorrência disso, já existem vários focos de adoção de práticas gerenciais na administração
pública. Com base nisso, este trabalho analisa a viabilidade de aplicação, na administração
pública, de uma estratégia muito difundida e comentada, que demonstrou fortes resultados em
algumas organizações privadas: o gerenciamento por processos. A parte empírica desse
estudo foi realizada na Universidade Federal de São Carlos - UFSCar, com o objetivo de
identificar a situação atual e os principais pontos favoráveis e desfavoráveis ao gerenciamento
por processos de quatro processos selecionados.
|
2 |
Modelo de gestão de informação com foco na fidelização dos clientes: um estudo de caso na Comercial Eletro Motores CEMde Melo Lucena, Rodrigo 31 January 2011 (has links)
Made available in DSpace on 2014-06-12T17:35:16Z (GMT). No. of bitstreams: 2
arquivo2625_1.pdf: 1191140 bytes, checksum: 222376f1549c31f333ac08d49861bebd (MD5)
license.txt: 1748 bytes, checksum: 8a4605be74aa9ea9d79846c1fba20a33 (MD5)
Previous issue date: 2011 / Tem se tornado cada vez mais difícil estabelecer uma relação de fidelidade com os
clientes, seja pela quantidade de ofertas dos mais diversos concorrentes, seja pela falta de
estrutura da própria empresa, proporcionando aos clientes algum tipo de desapontamento, ou
apenas pela intenção do cliente de experimentar, mesmo na condição de satisfação, o
produto/serviço do concorrente. A Comercial Eletro Motores (CEM), apesar de ser a única
assistência técnica autorizada da WEG em Maceió, tem sentido necessidade de desenvolver o
relacionamento com seus clientes, pois a infidelidade por parte dos mesmos tem se tornado
considerável. Portanto, o objetivo do trabalho é propor uma metodologia capaz de instituir um
modelo de CRM que possibilite aos clientes da CEM o acompanhamento da prestação de
serviços em seus equipamentos por meio da internet. Desta forma, foi aplicada uma pesquisa
com alguns de seus clientes, que proporcionou informações necessárias para verificar a
receptividade de tais clientes em utilizar tal ferramenta de CRM se porventura, a mesma fosse
criada. Sabendo que um dos grandes problemas da CEM está relacionado à sua estrutura de
processo, com ausência de padronização na linha de produção, a metodologia proposta
também tem como base, a utilização da gestão por processo. Considerando que houve uma
receptividade por parte dos clientes em utilizar a ferramenta de CRM, onde 50% do total de
pesquisados apontaram ter pleno interesse em utilizá-la, e 21,4% possuem significativo
interesse, tal trabalho mostrou-se relevante, apontando uma metodologia que viabiliza a
formatação dessa ferramenta de CRM
|
3 |
Análise das disfunções e benefícios que ocorrem na implantação e uso do modelo de referência no processo de desenvolvimento de produto / Dysfunctions and benefits analysis that occur at the implementation and use of the reference model in the new product developmentLhama, Paula Gabriela 23 August 2013 (has links)
O desempenho do Processo de Desenvolvimento de Produto (PDP) depende de como a empresa gerencia seu processo. A adoção de um modelo de referência para o PDP tem se mostrado uma boa prática, pois aumenta a capacidade de a empresa em controlar as mudanças no processo, avaliar seu desempenho, propor melhorias além de permitir uma maior compreensão do processo como um todo, padronizando e controlando todas as fases do PDP. Isso proporciona um melhor aproveitamento de recursos e, consequentemente, menor tempo de desenvolvimento e maior satisfação do cliente. Entretanto, muitas empresas não obtêm os resultados esperados durante e/ou após a implantação do modelo de referência específico, uma vez que nem todas estão preparadas culturalmente para adotar um processo estruturado. Na literatura, há poucas pesquisas que relatam, por meio de estudos de casos, quais os problemas e impactos que as organizações enfrentam ao aplicar um modelo de referência específico. O presente estudo tem por objetivo analisar as disfunções e benefícios que ocorrem no modelo de referência específico no PDP. Para isso, foram pesquisadas inicialmente as disfunções e benefícios na literatura e realizado estudo de caso em duas empresas. Os resultados mostram que as disfunções encontradas na literatura em sua maioria não foram confirmadas nas empresas, devido às particularidades de cada uma. E foi constatado por meio de entrevistas que algumas disfunções estiveram presentes apenas durante a implantação do modelo de referência específico. Diferentemente do panorama das disfunções, os benefícios apresentados, em sua maioria, foram confirmados em ambas as empresas. / New Product development (NPD) performance depends on how the company manages its process. The adoption of a reference model for NDP has been shown to be a good practice, because increases a companys capacity in controlling the alterations in the process, evaluate its performance, propose improvements besides allowing a greater comprehension of the process as a whole, creating a pattern and controlling all NPDs phases, which gives a better utilization of the resources, and consequently less time to market and better client satisfaction. However, many companies do not get the expected results during and/or after implementation of the specific reference model, once not all are culturally prepared to adopt a structurally process. In the literature there are few researchers that report by means of case studies which are the problems and impacts that companies face when applying a specific reference model. The objective of this study is to analyze the dysfunctions and benefits that occur in the NPD specific reference model. To do this end, it was initially searched the dysfunctions and the benefits in the literature and performed a case study in two companies. Results show that most of the dysfunctions found in the literature were not confirmed in the companies, because of the specificities of each one. In addition, it was observed by means of a focused interview that some of the dysfunctions were present only during the specific reference models implementation. Differently of the dysfunctions scenery, most of the shown benefits were confirmed in both companies.
|
4 |
Análise das disfunções e benefícios que ocorrem na implantação e uso do modelo de referência no processo de desenvolvimento de produto / Dysfunctions and benefits analysis that occur at the implementation and use of the reference model in the new product developmentPaula Gabriela Lhama 23 August 2013 (has links)
O desempenho do Processo de Desenvolvimento de Produto (PDP) depende de como a empresa gerencia seu processo. A adoção de um modelo de referência para o PDP tem se mostrado uma boa prática, pois aumenta a capacidade de a empresa em controlar as mudanças no processo, avaliar seu desempenho, propor melhorias além de permitir uma maior compreensão do processo como um todo, padronizando e controlando todas as fases do PDP. Isso proporciona um melhor aproveitamento de recursos e, consequentemente, menor tempo de desenvolvimento e maior satisfação do cliente. Entretanto, muitas empresas não obtêm os resultados esperados durante e/ou após a implantação do modelo de referência específico, uma vez que nem todas estão preparadas culturalmente para adotar um processo estruturado. Na literatura, há poucas pesquisas que relatam, por meio de estudos de casos, quais os problemas e impactos que as organizações enfrentam ao aplicar um modelo de referência específico. O presente estudo tem por objetivo analisar as disfunções e benefícios que ocorrem no modelo de referência específico no PDP. Para isso, foram pesquisadas inicialmente as disfunções e benefícios na literatura e realizado estudo de caso em duas empresas. Os resultados mostram que as disfunções encontradas na literatura em sua maioria não foram confirmadas nas empresas, devido às particularidades de cada uma. E foi constatado por meio de entrevistas que algumas disfunções estiveram presentes apenas durante a implantação do modelo de referência específico. Diferentemente do panorama das disfunções, os benefícios apresentados, em sua maioria, foram confirmados em ambas as empresas. / New Product development (NPD) performance depends on how the company manages its process. The adoption of a reference model for NDP has been shown to be a good practice, because increases a companys capacity in controlling the alterations in the process, evaluate its performance, propose improvements besides allowing a greater comprehension of the process as a whole, creating a pattern and controlling all NPDs phases, which gives a better utilization of the resources, and consequently less time to market and better client satisfaction. However, many companies do not get the expected results during and/or after implementation of the specific reference model, once not all are culturally prepared to adopt a structurally process. In the literature there are few researchers that report by means of case studies which are the problems and impacts that companies face when applying a specific reference model. The objective of this study is to analyze the dysfunctions and benefits that occur in the NPD specific reference model. To do this end, it was initially searched the dysfunctions and the benefits in the literature and performed a case study in two companies. Results show that most of the dysfunctions found in the literature were not confirmed in the companies, because of the specificities of each one. In addition, it was observed by means of a focused interview that some of the dysfunctions were present only during the specific reference models implementation. Differently of the dysfunctions scenery, most of the shown benefits were confirmed in both companies.
|
5 |
Utilização da gestão por processos de negócio nas organizações do setor metalmecânico de Caxias do SulBertéli, Michele Otobelli 28 March 2013 (has links)
A gestão por processos de negócio (BPM) surgiu para facilitar a integração e coesão dos diversos setores da organização, centrados em seus processos e buscando gerar maior valor ao cliente. O objetivo desta dissertação é de investigar a utilização de BPM nas organizações de pequeno, médio e grande porte do setor metalmecânico de Caxias do Sul, pertencente a um dos maiores pólos metalmecânicos do estado do Rio Grande do Sul. Uma pesquisa do tipo survey, com questionário adaptado de Paim (2007), foi aplicada numa amostra de 106
empresas. O resultado aponta que 47,2% das empresas utilizam BPM como o estilo de gestão predominante, sendo que para fomentar este estilo investiram na faixa de R$ 0,00 a R$ 100 mil nos últimos quatro anos. Na média, o grau de gestão por processos praticado pelas empresas respondentes foi de 2,98 entre o grau 1 (não pratica) e o grau 5 (pratica habitualmente). Entre os motivos pelos quais as empresas decidiram utilizar BPM destaca-se a melhoria dos processos internos (22,4%). Uma das conclusões é que mesmo as organizações que dizem utilizar gestão por processos estão numa fase de transição, migrando de uma gestão funcional. A adoção de BPM de maneira holística, como definido pela literatura, ainda não é plenamente observada no cenário desse estudo. / Submitted by Marcelo Teixeira (mvteixeira@ucs.br) on 2014-04-29T13:03:25Z
No. of bitstreams: 1
Dissertacao Michele Ortobeli.pdf: 2871571 bytes, checksum: 0e18db5997ceb7f6fcd1ae95cd3ab969 (MD5) / Made available in DSpace on 2014-04-29T13:03:25Z (GMT). No. of bitstreams: 1
Dissertacao Michele Ortobeli.pdf: 2871571 bytes, checksum: 0e18db5997ceb7f6fcd1ae95cd3ab969 (MD5) / Business Process Management (BPM) emerged to facilitate integration and cohesion of different areas of an organization, which focuses on creating greater value to customer. This master thesis aims to investigate BPM application in small, medium and large metalworking companies located in Caxias do Sul, one of the largest metalworking regions of the State of Rio Grande do Sul, Brazil. A survey instrument, adapted from Paim (2007), was applied on a sample of 106 companies. Results show that 47.2% of the companies have used BPM as a
predominant management style and in order to foster this style they have invested in the range of R$ 0,00 to R$ 100.000,00 in the last four years. Moreover, the average degree of BPM practiced by respondent companies was 2.98, where 1 means no practice at all and 5 indicates solid practice. Improvement of internal processes was most appointed (22.4%) as the reason why companies decided to use BPM. One of the major conclusions of the research is that even organizations that say to be involved with BPM are in a transition phase from traditional management style. The use of BPM to the fullest extent has not been observed in the scope of
this research.
|
6 |
Identificação e análise dos fatores críticos em iniciativas de BPM na administração públicaMolardi, Rodrigo Motta 17 November 2017 (has links)
Submitted by Joana Azevedo (joanad@id.uff.br) on 2018-01-09T13:34:01Z
No. of bitstreams: 1
Dissert Rodrigo Motta Molardi.pdf: 3182830 bytes, checksum: 121a768a1f7588bf488dba3c98caa2a1 (MD5) / Approved for entry into archive by Biblioteca da Escola de Engenharia (bee@ndc.uff.br) on 2018-01-09T13:43:38Z (GMT) No. of bitstreams: 1
Dissert Rodrigo Motta Molardi.pdf: 3182830 bytes, checksum: 121a768a1f7588bf488dba3c98caa2a1 (MD5) / Made available in DSpace on 2018-01-09T13:43:38Z (GMT). No. of bitstreams: 1
Dissert Rodrigo Motta Molardi.pdf: 3182830 bytes, checksum: 121a768a1f7588bf488dba3c98caa2a1 (MD5)
Previous issue date: 2017-11-17 / Esta pesquisa tem como objetivo principal identificar e analisar os Fatores Críticos (FC) que causam maior impacto em iniciativas de gerenciamento de processo de negócio (Business Process Management - BPM) na Administração Pública, direta ou indireta, com o intuito de não apenas aumentar o conhecimento na área, mas também diminuir a complexidade do seu processo de implementação por parte das organizações públicas. Para realizar a identificação dos FC realizou-se um Mapeamento Sistemático da Literatura (MS) em cinco bases de dados digitais, buscando estudos primários que pudessem fornecer as informações necessárias para pesquisa. O MS teve o retorno de dez estudos primários relevantes que possibilitaram a identificação de um total de trinta FC. A etapa de análise dos fatores críticos contou com as interpretações quantitativas e qualitativas dos mesmos, a comparação com os FC em BPM no setor privado, identificados através de uma compilação de teses ou dissertações que já haviam realizado este tipo de estudo, e da definição do nível de maturidade de cada FC através de questionário submetidos a quatro especialistas em BPM na Administração Pública. Com a análise, foi possível identificar os FC relevantes, entender as facilidades e dificuldades encontra nas iniciativas de BPM e entender o quão maduro estão cada FC na realidade das organizações públicas. O número reduzido de estudos primários relevantes e o baixo nível de maturidade dos FC apontam para as dificuldades da gestão por processo de negócio na Administração Pública, aumentando a relevância desta pesquisa para incentivar o conhecimento e a realização de trabalhos futuros sobre o assunto. / The main objective of this research is to identify and analyze the Critical Factors (CF) that have the greatest impact on Business Process Management (BPM) initiatives in Public Administration, in order to not only increase the knowledge in the area, but also reduce the complexity of their adoption by public organizations. In order to perform the identification of the CF, a Systematic Literature Mapping (SM) was carried out in five digital databases, searching for primary studies that could provide the information needed for research. The SM returned ten relevant primary studies that allowed the identification of thirty FC. The critical factors analysis stage performed quantitative and qualitative interpretations, the comparison with CF in BPM in the private sector, identified through a compilation of theses or dissertations that had already performed this type of study, and the definition of the level of maturity of each CF through questionnaire submitted to four specialists in BPM in Public Administration. With the analysis, it was possible to identify some relevants CF, to understand the facilities and difficulties found in the BPM initiatives and to understand how mature each critical factor is in the reality of public organizations. The reduced number of relevant primary studies and the low level of maturity of the CF points to the difficulties for the business process management in the Public Administration, increasing the relevance of this research to encourage the knowledge and the accomplishment of future work on the subject.
|
7 |
Utilização da gestão por processos de negócio nas organizações do setor metalmecânico de Caxias do SulBertéli, Michele Otobelli 28 March 2013 (has links)
A gestão por processos de negócio (BPM) surgiu para facilitar a integração e coesão dos diversos setores da organização, centrados em seus processos e buscando gerar maior valor ao cliente. O objetivo desta dissertação é de investigar a utilização de BPM nas organizações de pequeno, médio e grande porte do setor metalmecânico de Caxias do Sul, pertencente a um dos maiores pólos metalmecânicos do estado do Rio Grande do Sul. Uma pesquisa do tipo survey, com questionário adaptado de Paim (2007), foi aplicada numa amostra de 106
empresas. O resultado aponta que 47,2% das empresas utilizam BPM como o estilo de gestão predominante, sendo que para fomentar este estilo investiram na faixa de R$ 0,00 a R$ 100 mil nos últimos quatro anos. Na média, o grau de gestão por processos praticado pelas empresas respondentes foi de 2,98 entre o grau 1 (não pratica) e o grau 5 (pratica habitualmente). Entre os motivos pelos quais as empresas decidiram utilizar BPM destaca-se a melhoria dos processos internos (22,4%). Uma das conclusões é que mesmo as organizações que dizem utilizar gestão por processos estão numa fase de transição, migrando de uma gestão funcional. A adoção de BPM de maneira holística, como definido pela literatura, ainda não é plenamente observada no cenário desse estudo. / Business Process Management (BPM) emerged to facilitate integration and cohesion of different areas of an organization, which focuses on creating greater value to customer. This master thesis aims to investigate BPM application in small, medium and large metalworking companies located in Caxias do Sul, one of the largest metalworking regions of the State of Rio Grande do Sul, Brazil. A survey instrument, adapted from Paim (2007), was applied on a sample of 106 companies. Results show that 47.2% of the companies have used BPM as a
predominant management style and in order to foster this style they have invested in the range of R$ 0,00 to R$ 100.000,00 in the last four years. Moreover, the average degree of BPM practiced by respondent companies was 2.98, where 1 means no practice at all and 5 indicates solid practice. Improvement of internal processes was most appointed (22.4%) as the reason why companies decided to use BPM. One of the major conclusions of the research is that even organizations that say to be involved with BPM are in a transition phase from traditional management style. The use of BPM to the fullest extent has not been observed in the scope of
this research.
|
Page generated in 0.0833 seconds