• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 10
  • Tagged with
  • 12
  • 12
  • 12
  • 12
  • 12
  • 10
  • 10
  • 10
  • 10
  • 10
  • 10
  • 9
  • 9
  • 5
  • 2
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Sistema de asignación dinámica de rutas para optimizar tiempos de atención de pacientes para el servicio de consulta externa del hospital de nivel III-1 usando árboles de decisión / Dynamic routing system to optimize patient care times for the level iii-1 hospital outpatient service using decision trees

Flores Chapilliquen, Harold Spencer, Quispe Marin, Noe Rosauro 14 December 2021 (has links)
El Perú cuenta con un sistema de atención sanitaria descentralizado, administrado por cinco entidades: el Ministerio de Salud (MINSA), que ofrece servicios de salud para el 60% de la población; EsSalud con 30% de la población; FFAA, PNP, el sector privado al 10% restante. Considerando la información se desarrolla una propuesta de solución web con soporte en microservicios para optimizar los tiempos de atención de salud del hospital. En el capítulo 1, describe el proyecto y objeto en estudio, el planteamiento del problema y objetivos, asimismo, los indicadores de éxito del proyecto. El capítulo 2, se incorporan los 7 student outcomes donde se evidencia la aplicación por parte de los integrantes. El capítulo 3, describe el marco teórico para el desarrollo, planeamiento estratégico, arquitectura empresarial, marco de trabajo de Zachman, TOGAF, arquitectura de software y la Guía de los Fundamentos para la Dirección de Proyectos (Guía PMBOK®) El capítulo 4, describe el análisis de negocio bajo el marco de trabajo de Zachman, además, de realizar la ingeniería de procesos tomando el 2do nivel de Zachman. El capítulo 5, resultado del proyecto de acuerdo con el análisis de requerimientos, el modelado y diseño de la arquitectura de software usando la técnica de notación C4 basado en descomposición estructural del sistema y del prototipo. El capítulo 6, enfocamos la gestión y el ciclo de vida del proyecto. Finalmente, el capítulo 7, se realiza las conclusiones para el desarrollo del proyecto. / Peru has a decentralized health care system administered by five entities: the Ministry of Health (MINSA), which offers health services for 60% of the population; ESSALUD with 30% of the population; Armed Forces, the Police Department, and the private sector representing the remaining 10%. Regarding this information, it is necessary to develop a proposal for a web solution with support in microservices in order to optimize assistance times in external consulting services in the organization. Chapter 1 describes the project and object under study, the problem statement and objectives as well as the project's success indicators. Chapter 2 incorporates the 7 student outcomes where the application done by the members is evidenced. Chapter 3 describes the theoretical framework for development, strategic planning, enterprise architecture, Zachman framework, TOGAF, software architecture and the Guide to the Fundamentals for Project Management (PMBOK® Guide) Chapter 4 describes the business analysis under the Zachman framework, in addition to performing the process engineering taking Zachman's 2nd level. Chapter 5, result of the project according to the requirements analysis, modeling and design of the software architecture using the C4 notation technique based on the structural decomposition of the system and the prototype. Chapter 6 describes Project Management where the PMBOK® good practice guide is used. Finally, chapter 7, the conclusions of the project are shown. / Tesis
12

Propuesta de mejora en el proceso de reparación de componentes de maquinaria pesada mediante el uso de herramienta lean manufacturing aplicado en un taller mecánico / Improvement proposal in the repair process of heavy machinery components through the use of lean manufacturing tools applied in a mechanical workshop

Tolentino Angulo, Richard Elvis 30 March 2021 (has links)
El presente proyecto de investigación tiene por finalidad presentar una propuesta de mejora en la gestión de reparación de componentes de maquinaria pesada que se realiza en el taller de la empresa San Martin Contratistas S.A. basado en el enfoque Lean Manufacturing (Manufactura Esbelta) mediante ello se propone la implementación de herramientas que permiten mejorar la calidad de los servicios,reduciendo el tiempo de entrega y cumpliendo las exigencias de los clientes. Asimismo, se realizó el análisis cuantitativo de las consecuencias y los problemas que los originan. Después del diagnóstico se ha identficado 3 causas principales al problema: Inadecuado proceso de reabastecimiento de repuestos,distribución inadecuada de instalaciones y demora en el proceso de diagnóstico de fallas, los cuales impactan directamente en las operaciones y la rentabilidad de la empresa. El presente proyecto de investigación consta de cuatro capítulos, los cuales en su conjunto permitirán la comprensión del sector, el análisis de la problemática, la propuesta de solución y el impacto económico de la propuesta. Finalmente, se presentarán las conclusiones de la implementación de las herramientas de Lean Manufacturing y las recomendaciones del estudio respectivo. / The purpose of this research project is to present a proposal for improvement in the repair management of heavy machinery components that is carried out in the workshop of the company San Martin Contractors S.A. Based on the Lean Manufacturing approach, it is proposed to implement tools that allow improving the quality of services, reducing delivery time and meeting customer requirements. Likewise, a quantitative analysis of the consequences and the problems that originate them was carried out. After the diagnosis, 3 main causes of the problem have been identified: Inadequate spare parts replenishment process, inadequate distribution of facilities and delay in the fault diagnosis process, which directly impact the operations and profitability of the company. This research project consists of four chapters, which together will allow the understanding of the sector, the analysis of the problem, the proposed solution and the economic impact of the proposal. Finally, the conclusions of the implementation of the Lean Manufacturing tools and the recommendations of the respective study will be presented. / Trabajo de Suficiencia Profesional

Page generated in 0.0958 seconds