• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Låssystemproblematiken under entreprenad : En checklista för att underlätta processen och undvika komplikationer / Locking system problems during contract work : A checklist to facilitate the process and avoid complications

Erlandsson, Tobias, Larsson, Henrik January 2013 (has links)
Detta arbete är ett samarbete med Markbygg Construction AB. I byggbranschen finns det en problematik med låssystem. På grund av olika faktorer, som bristfälliga föreskrifter och brist på kunskap inom ämnet, kan extra resurser behövas i slutet av projektet för olika korrektioner.Syftet med det här projektet är att skapa ett system för att hantera låssystem under entreprenad, så att komplikationer kan undvikas. Målsättningen är att skapa en checklista som visar att funktionskraven för ett låssystem i en byggnad uppfylls. Checklistan ska förhindra att extra arbeten uppstår i slutet av projektet. Det behövs en avgränsning eftersom det inte är relevant om ett lås öppnas med kortläsare, bricka, kod eller via porttelefon. Det som är viktigt är att låset i sig är kapabelt att ta emot en elektrisk signal som berättar för låset att det ska öppna sig. Projektet inleddes med en inläsningsperiod i ämnet för att kunna konstruera ett teoretiskt underlag som checklistan ska baseras på. Teorin består av fyra olika delar som behövs för att konstruera checklistan. Brand & UtrymningInbrottsskydd Funktioner Utformning av checklista Efter teorin var färdigställd så utformades checklistan från koncept till ifyllbart PDF-dokument. Efteråt kompletterades checklistan enligt Markbyggs önskemål. Resultatet blev en enkel och lättförståelig checklista som kommer att användas som hjälpmedel under projektering och produktion. Det finns utvecklingspotential för checklistan och många områden som den skulle kunna utvecklas i, exempelvis integration med CAD-program. Förhoppningen med checklistan är att den ska kunna vara med och bidra till en hållbar utveckling genom att undvika fel under entreprenad. Ambitionen är att på det sättet spara in på både transport-, arbets- och materialkostnader.
2

Utveckling och konstruktion av dämpare och låssystem för vågkraftverk

Rydén, Gustav, Åberg, Emil January 2014 (has links)
The division of Electricity at Uppsala University is developing a wave energy converter(WEC) consisting of a linear generator connected to a bouy at the water surfacethrough a wire cable called the connection line.During extreme conditions, the wave power plant will experience forces up to 500kN, which lead to unnecessary wear and will ultimately cause the failure of theconverter. To prevent this there is a need for a damper.The wave energy converter works at a maximum efficiency when the translator’sare centered with respect to the stator. Due to tidal movements the position of thetranslator can deviate. There for a mechanical divice that will compensate for this isneeded.This report describes the further development of an earlier project where a tidalwave compensator for a wave energy converter of Seabased AB was developed. Thecompensator Mattias Maier developed in the earlier project needed a locking systemto lock thecompensators position when not active. This report also illustrates the developmentof a damperthat is to be implemented in the WEC. The damper´s function is toprevent peak forces to occurring. This has to be achiveble without lowering thepower plant’s efficiency, meaning that it should only start to moderate the force whenit goes above 200 kN.The design process consisted in developing and dimensioning twosolutions, with special consideration to the standard components and manufacturingmethods available at the workshop in Lysekil.The project resulted in 3D modeled design solutions and complete manufacturingdrawings. We also present some recommendations for further studies in chapter 8.
3

Modular Locking System to RBS Cabinet

Almqvist, Josefin, Sundelius, Emma January 2013 (has links)
Radio base stations contain equipment which enables the use of cell phones all around the world. ERICSSON is developing these stations and everything connected to the area, such as electronics, software and hardware. In a new project ERICSSON plans to make their hardware modular, to satisfy all their customers around the world even if their preferences differ. The task that was given to us was to develop a modular locking system to the radio base station cabinets.The concept was developed in an integrated working process that focused on a user centered final product. The process included the definition of the problem, preliminary studies of areas which are connected to the problem and a summary of the demands that the customers mediated in a list of requirements. The idea generation generated lots of ideas that later on were developed into different concepts. The concepts were evaluated before the final decision was made together with ERICSSON.The final product is a lifting handle connected to a rod and latch system, which already existed. A new mechanical function was created to make the new handle function with the old system. The locking system is modular and it is possible to choose which way to lock the handle, with a cylinder lock or a padlock. Only one module, the cylinder in the middle, needs to be switched to get the other solution. The other parts are the same; this makes the product modular. The lift handle is an entire new design, developed in the project.

Page generated in 0.0437 seconds