• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 54
  • 44
  • 25
  • 19
  • 3
  • 1
  • 1
  • 1
  • Tagged with
  • 161
  • 161
  • 52
  • 47
  • 43
  • 41
  • 38
  • 24
  • 23
  • 22
  • 21
  • 21
  • 21
  • 20
  • 20
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Hur fungerar Lean construction? : En fallstudie av NCC

Häggroth, Michael, Odén Rapport, Nils January 2008 (has links)
<p>Det har blivit allt dyrare att bygga i Sverige, den svenska byggnadsindustrin har halkat efter övrig producerande industri och byggföretagen måste börja tänka i nya banor om de ska klara de nya utmaningarna. Lean-tänkande har länge nyttjats inom den tillverkande industrin och byggföretag har på senare år börjat snegla på dessa koncept i syfte att öka sin produktivitet. Problemet är att byggindustrin inte har homogena produktionsmiljöer och därmed inte kan använda samma lean-koncept som exempelvis bilindustrin. Därför har ett nytt koncept som kallas Lean construction utvecklats som bygger på ett antal principer från traditionella produktionssynsätt (Koskela, 2000). Konceptet är relativt nytt och forskningen inom området har främst fokuserat på lösningar på specifika problem istället för att skapa förståelse för konceptets helhet. I denna studie ligger därför fokus på att skapa förståelse för helheten genom att belysa hur Lean-constructionprinciper samverkar och påverkar varandra i ett produktionssystem. För att förstå dessa kopplingar har ett byggföretag som aktivt arbetar med olika lean-koncept studerats i en fallstudie. I studien framgår att produktionsprinciperna kan vara överordnade varandra och att vissa principer kan vara mer eller mindre centrala i Leanconstruction. Studien identifierar också ett nytt område byggföretag kan ha problem med, vilket benämns som kunskapsslöseri.</p>
12

Last planner system e just-in-time na construção

Grenho, Luís Filipe Santos January 2009 (has links)
Tese de mestrado integrado. Engenharia Civil (Especialização em Construções). Faculdade de Engenharia. Universidade do Porto. 2009
13

Utvärdering av byggprojekts tillämpning av Lean Construction i produktionen : framtagning av en mognadsmodell

Eriksson, Michaela January 2019 (has links)
Till skillnad mot tillverkningsbranschen, med bland annat Toyota i spetsen, har byggbranschens försök till ökad produktivitet förblivit låg under de senaste 40 åren. Tillverkningsindustrin har nått goda resultat genom tillämpning av Lean Production. Lean handlar i huvudsak om att mi- nimera slöseri och maximera värde. Slöseri finns i olika former och en definition utifrån Lean är de åtta slöserierna: överproduktion, väntan, transport, överarbete, lager, rörelse, omarbete och outnyttjad kreativitet. Målet med examensarbetet var att utveckla en mognadsmodell som utvärderar byggarbetsplatsers tillämpning av Lean Construction med utgångspunkt i de åtta slöserierna, som ska kunna användas som en mall för förbättringsåtgärder. Studien, som framförallt antagit en kvalitativ forskningsstrategi, är en utforskande studie som har svarat på hur byggarbetsplatser kan utvärderas utifrån Lean med de åtta slöserierna som grund. Forskningsansatsen är deduktiv i och med att mognadsmodellen utvecklats utifrån be- fintlig teori, för att användas och testas i verkliga situationer. För att försäkra om validitet har framförallt triangulering använts. Även granskning av båda handledarna har tillfört till validi- teten. Reliabilitet har eftersträvats genom dokumentation och kontinuerlig kontakt med hand- ledare. Mognadsmodellen består av 20 kategorier som på olika sätt har en grund i de åtta slöserierna. Dessa kategorier bedöms på en nivåskala 1-5, där nivå ett innebär lägst tillämpning, och nivå fem innebär högst tillämpning. Resultatet från utvärderingarna visade att det skiljer sig åt något mellan de olika byggarbetsplatserna trots att de utförs av samma företag, och att det finns för- bättringspotential. Analysen visade på att majoriteten av kategorierna behöver någon form av ändring, främst ge- nom uppdelning av kategorier i en eller flera olika kategorier, eller omformulering av kategorier som inte fungerade riktigt utifrån verkligheten som framkom under platsbesöken. Samtidigt framkom det att vissa kategorier överlappade varandra, och att det var svårt att hålla reda på alla kategorier och tillhörande beskrivningar vid testen. Detta är en indikator på att modellen bör bli mer kompakt och inte lika begränsande. Modellen analyserades också utifrån en analys- modell för att utreda när en mognadsmodell som den som utvecklades kan användas. Examensarbetet hade dragit nytta av att utföras av två personer eftersom en kvalitativ studie som denna innebär subjektivitet vilken hade blivit mer objektiv om två perspektiv hade funnits med. Utgångspunkten till modellen som var de åtta slöserierna anses i efterhand varit lite för snäv eftersom det finns andra områden inom Lean som också anses vara viktiga, exempelvis säkerhet. Om modellen hade testats innan den primära undersökningen påbörjades hade detta kunnat upptäckas, och modellen hade redan då kunnat omformulerats innan de huvudsakliga platsbesöken. Mer utveckling och forskning bör ta vid efter detta arbete. Det finns fem stycken fokusområden som en mognadsmodell bör innehålla för att utreda till- lämpningen av Lean Construction, vilka kan delas upp i fler kategorier som inte bör vara för omfattande. Resultatet visar på att det skiljer sig åt mellan de undersökta byggproduktionerna inom fyra kategorier, men anledningen bakom detta är okänt. Mognadsmodellen är utvecklad på ett sådant sätt att den kan användas vid förbättringsarbetet och utvecklingen av tillämpningen av Lean Construction. / In comparison to the manufacturing industry, with companies such as Toyota in the lead, the construction industries attempt to increase productivity has remained low for the past 40 years. The manufacturing industry has achieved great results by working with Lean Production. Lean at is core is about minimise waste and maximise value. Waste comes in many forms, and one definition is the eight wastes of Lean: overproduction, waiting, transportation, extra processing, inventory, motion, defects and non-utilized talent. The objective with the master thesis was to develop a maturity model that evaluate construction sites involvement with Lean Construction based on the eight wastes of Lean, and that it should be possible to use the model as a template for improvements. The master thesis, which foremost has a qualitative research strategy, is an exploratory study that has answered on how construction sites can be assessed by Lean with the base of the eight wastes of Lean. The research approach is deductive since the maturity model has been devel- oped by using existing theory in order to assess construction sites in real situations. To ensure validity a work procedure by triangulation has been used. The supervisors reviewing the work has also contributed to the validity. The reliability has been sought by documentation and con- tact with supervisors continuously. The maturity model consists of 20 categories that in different ways has a base in the eight wastes of Lean. These categories are assessed by a level scale 1-5, where level one is the lowest im- plementation, and level five is the highest implementation. The results from the assessments showed that there are differences between the construction sites even though they are performed by the same company, and that there is potential for improvements. The analysis suggests that the majority of the categories need some sort of modification. Mainly by sectioning some categories into two or more categories, or reformulation of categories that did not work based on reality that appeared during the site visits. It also appeared that some categories overlapped each other, and that it was hard remembering all the categories with its descriptions when testing the model. This imply that the model should be more compact and less limiting. The maturity model was also analysed by an analysis model to investigate when a maturity model like the one that has been developed could be used. The master thesis would have improved if it had been performed with a co-writer since a qual- itative study like this result in subjectivity which had been more objective if there would have been two perspective. The base for the maturity model which was the eight wastes of Lean is considered, now afterwards, to be a little too narrow since there is other areas in Lean Con- struction which are considered to be important, such as security. If the maturity model would have been tested before the primary assessments it could have been realised and thereby mod- ified before the site visits. More development and research have to be done after this thesis is presented. There are five focus areas which should be included in a maturity model in order to assess the application of Lean Construction, these could be divided into several categories as long as they aren’t too extensive. The result shows that there is a difference between the investigated build- ing productions in four categories, but the reason behind this is unknown. The maturity model has been developed in such a way that it can be used in the improvement work and the devel- opment of the application of Lean Construction.
14

An integrated approach toward lean for production homebuilders

Yu, Haitao 11 1900 (has links)
Homebuilding is widely regarded as the most analogous sector in the construction industry to automobile manufacturing. In the past decades, increasing interest from homebuilders has been seen to model the homebuilding process after manufacturing, particularly lean production, to improve productivity. However, differences inherent in the nature of the products prevent the direct implementation of lean principles and systems in the homebuilding industry. Project-oriented techniques used by the other sectors of construction are still dominant in homebuilding process planning and control. There is a clear need for an approach to integrate a lean production system into the homebuilding process and to overcome the challenges in lean implementation. The purpose of this research is to develop a lean production approach for the North American homebuilding industry. Specifically, this research intends to provide a framework and a set of guidelines that can help production homebuilders to improve their efficiency through lean transformation. This study first investigated the current homebuilding process and then conducted a comparative study between the homebuilding and automobile industries. Based on the analysis, a lean homebuilding model was developed, and key lean strategies were identified to support lean implementation efforts. Case study results revealed that a lean production system can be successfully applied to the homebuilding process, and lean strategies, such as continuous flow, pull system, production leveling, standardized work, investing in the people, and visual management were effective in improving a homebuilders operation performance in terms of construction cycle time, process stability and house quality. The major contribution of this dissertation is to provide production homebuilders a roadmap to developing their own lean production systems and lean implementation strategies. The research results are also anticipated to be a benchmark for future studies in the academic field and for the homebuilding industry. / Construction Engineering and Management
15

Hur fungerar Lean construction? : En fallstudie av NCC

Häggroth, Michael, Odén Rapport, Nils January 2008 (has links)
Det har blivit allt dyrare att bygga i Sverige, den svenska byggnadsindustrin har halkat efter övrig producerande industri och byggföretagen måste börja tänka i nya banor om de ska klara de nya utmaningarna. Lean-tänkande har länge nyttjats inom den tillverkande industrin och byggföretag har på senare år börjat snegla på dessa koncept i syfte att öka sin produktivitet. Problemet är att byggindustrin inte har homogena produktionsmiljöer och därmed inte kan använda samma lean-koncept som exempelvis bilindustrin. Därför har ett nytt koncept som kallas Lean construction utvecklats som bygger på ett antal principer från traditionella produktionssynsätt (Koskela, 2000). Konceptet är relativt nytt och forskningen inom området har främst fokuserat på lösningar på specifika problem istället för att skapa förståelse för konceptets helhet. I denna studie ligger därför fokus på att skapa förståelse för helheten genom att belysa hur Lean-constructionprinciper samverkar och påverkar varandra i ett produktionssystem. För att förstå dessa kopplingar har ett byggföretag som aktivt arbetar med olika lean-koncept studerats i en fallstudie. I studien framgår att produktionsprinciperna kan vara överordnade varandra och att vissa principer kan vara mer eller mindre centrala i Leanconstruction. Studien identifierar också ett nytt område byggföretag kan ha problem med, vilket benämns som kunskapsslöseri.
16

Peabs arbetsberedning i produktionen : Finns det en koppling mellan arbetsberedning och Lean construction? / Working preparations in production at Peab

Larsson, Linus, Andersson, Henrik January 2009 (has links)
Statistik har visat att byggbranschens byggnationskostnader i Sverige har ökat de senaste åren. Dessa kostnader beror enligt Josephson &amp; Saukkorippi på kvalitetsproblem och kostnader för omprojektering, samt att det i nuläget görs aktiviteter som inte tillför något kundvärde.   Ett arbetsmoment som idag är en viktig del hos många byggföretag är arbetsberedning. Syftet med arbetsberedningen är att hitta den optimala metoden att utföra ett moment på.   Grunden till uppslaget är att Peab anser att det råder brister i deras nuvarande arbetsberedning. Intervjuer och enkätundersökning har gjorts för att kartlägga eventuella brister i Peabs arbetsberedning samt deras synsätt på Lean.
17

Peabs arbetsberedning i produktionen : Finns det en koppling mellan arbetsberedning och Lean construction? / Working preparations in production at Peab

Larsson, Linus, Andersson, Henrik January 2009 (has links)
<p><p><strong></strong></p><p>Statistik har visat att byggbranschens byggnationskostnader i Sverige har ökat de senaste åren. Dessa kostnader beror enligt Josephson & Saukkorippi på kvalitetsproblem och kostnader för omprojektering, samt att det i nuläget görs aktiviteter som inte tillför något kundvärde.</p><p> </p><p>Ett arbetsmoment som idag är en viktig del hos många byggföretag är arbetsberedning. Syftet med arbetsberedningen är att hitta den optimala metoden att utföra ett moment på.</p><p> </p><p>Grunden till uppslaget är att Peab anser att det råder brister i deras nuvarande arbetsberedning. Intervjuer och enkätundersökning har gjorts för att kartlägga eventuella brister i Peabs arbetsberedning samt deras synsätt på Lean.</p></p>
18

An integrated approach toward lean for production homebuilders

Yu, Haitao Unknown Date
No description available.
19

Integración sistémica y evaluación de herramientas de la filosofía lean construction: last planner system y pull planning en la planificación y control de un túnel de trinchera cubierta en el Perú

Guzmán Arana, Gian Pier, Vela Cieza, Jean Paul 05 1900 (has links)
El objetivo de la siguiente tesis es crear una visión integral de las metodologías de planeamiento y control que forman parte de la filosofía “Lean Construction” para validarlas como buenas prácticas en construcción de obras de ingeniería. Para ello, se eligió el proyecto encargado de la construcción de un Túnel de trinchera cubierta en el Perú y se evaluó la forma de trabajo de las áreas de planeamiento y producción en el contexto de la implementación de las metodologías. Esto define dos momentos diferentes en el proyecto; inicialmente, cuando se trabajaba de manera tradicional y luego con las metodologías ya implementadas. Durante todo este largo proceso se lograron mejoras en el desempeño de la ejecución del túnel. Para constatar ello, se evaluaron las ventajas y limitaciones de los diferentes enfoques. Asimismo, el análisis de la información recopilada permitió mostrar de manera efectiva las mejoras a partir de la evaluación del grado de adherencia o cumplimiento y el análisis de los desvíos entre lo planeado y realizado. Finalmente, como propuesta y aplicación de mejora, la tesis presenta la forma ideal de implantar este sistema de gestión del tiempo en cualquier proyecto de construcción y la propuesta se expone mediante diagramas de flujos y diagramas funcionales de las etapas y procesos del sistema. / Tesis
20

LEAN I BYGGBRANSCHEN : -En studie om hur svenska företag inombyggbranschen arbetar med och resonerar kring Lean.

Karlsson, Emil, Öman, Jacob January 2018 (has links)
År 2017 befinner sig Sverige i en bostadsbrist och de kommande sju åren finns det ett behov av 600 000 nya bostäder. Samtidigt så är produktiviteten i byggbranschen låg jämfört med andra tillverkande branscher och kostnaderna för att producera en bostad i Sverige är högst i hela EU. Det finns därför ett behov av att öka produktiviteten i den svenska byggbranschen. Inom tillverkningsbranschen implementerades tidigt produktionsteorin Lean vilket har visat sig öka produktiviteten. Leankonceptet har sedan spridit sig till övriga branscher och däribland byggbranschen.   Syftet med studien är att öka förståelsen för hur svenska företag inom byggbranschen använder sig av och resonerar kring hur Lean kan bidra till en ökad produktivitet. Studien har en kvalitativ ansats. Respondenterna i studien kommer från olika delar av byggbranschen för att få ett bredare perspektiv av hur Lean används inom byggbranschen. Urvalet består av två större byggföretag, ett VVS-bolag och en materialleverantör/logistik-bolag. För att förstå hur dessa företag resonerar och arbetar med Lean har fyra semistrukturerade intervjuer genomfört. Studien visar att inget av de intervjuade företagen arbetar fullt ut med Lean men att de använder sig av vissa verktyg eller modeller från Leankonceptet. Respondenterna hade en positiv uppfattning till Lean och dess implementering i byggbranschen sett till produktivitet.

Page generated in 0.091 seconds