• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • 6
  • 2
  • 2
  • 1
  • 1
  • Tagged with
  • 21
  • 21
  • 9
  • 8
  • 7
  • 6
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
11

Modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados engineer-to-order

Bataglin, Fernanda Saidelles January 2017 (has links)
A crescente necessidade de reduzir os prazos e os custos dos empreendimentos de construção e de melhorar a qualidade das edificações e as condições de trabalho tem incentivado a adoção de sistemas pré-fabricados. Entretanto, a adoção desses sistemas exige uma intensa troca de informações entre a obra e a fábrica, de forma a sincronizar a fabricação dos componentes, as operações logísticas e o processo de montagem na obra, principalmente em ambientes engineer-to-order (ETO). Em sistemas do tipo ETO, o pedido do cliente é realizado nas etapas iniciais do projeto, e existe um elevado grau de incerteza principalmente pelo desconhecimento das atividades a serem realizadas. Em ambientes com esse tipo de complexidade, a literatura sugere o uso de Building Information Modeling (BIM) para facilitar o compartilhamento de informações e apoiar a tomada de decisões nesses ambientes, assim como a aplicação de conceitos e princípios da filosofia da Produção Enxuta. Particularmente em relação aos processos de montagem, o uso de BIM 4D pode ser utilizado para simular e analisar algumas operações, apoiando o processo de planejamento e o controle da produção. Esta pesquisa teve como objetivo desenvolver um modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados do tipo engineer-to-order com o apoio da modelagem BIM 4D A abordagem metodológica adotada foi Design Science Research (DSR), sendo desenvolvidos dois estudos empíricos. O primeiro foi realizado em colaboração com uma empresa responsável pelo projeto, fabricação e montagem de estruturas pré-fabricadas de concreto, sendo implementadas diversas melhorias em uma obra de uma universidade. O segundo, de caráter descritivo, foi desenvolvido em um empreendimento de construção de shopping center, sendo envolvidas uma empresa gerenciadora de obra e uma empresa que produziu e montou na obra a estrutura pré-fabricada de concreto. As principais contribuições da aplicação de BIM 4D como suporte à tomada de decisão referem-se ao aumento da confiabilidade do processo de montagem e da produtividade, principalmente pela clareza e rápida atualização das informações geradas pelos modelos 4D. / The growing need to reduce construction project duration and cost, as well as to improve building quality and working conditions, have encouraged the adoption of prefabricated building systems. However, the adoption of those systems requires an intense exchange of information between the construction site and the plant, in order to synchronize the production of components, logistic operations and site assembly, especially in an engineer-to-order (ETO) environment. In ETO systems, the client’s order is placed at the early design stages, and a high degree of uncertainty exists mostly due to the lack of knowledge about the tasks to be carried out. The literature suggests the use of Building Information Modeling (BIM) to facilitate the sharing of information and to support decision-making in this type of environment, as well as the application of Lean Production concepts and principles. Particularly in relation to assembly process, the use of 4D BIM modelling can be used to simulate and analyze some operations, supporting production planning and control This research work aims at to devise a model for the management of logistic processes for engineer-to-order prefabricated building systems, with the support of 4D BIM modelling. Design Science Research was the methodological approach adopted in this investigation, and two empirical studies were carried out. The first one was undertaken in close collaboration with a company that designs, manufactures, and assemble prefabricated concrete structures, and some improvements were implemented in a project for a higher education institution. The second was undertaken in a shopping mall project, and two companies were involved: a project management company, and a company that produced and assembled on-site pre-fabricated structures. As a result of this research work, the application of 4D BIM to support decision-making contributed to improve the reliability of the assembly process and to increase productivity, mainly due to the clarity and timeliness of the information made available by 4D models.
12

Modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados engineer-to-order

Bataglin, Fernanda Saidelles January 2017 (has links)
A crescente necessidade de reduzir os prazos e os custos dos empreendimentos de construção e de melhorar a qualidade das edificações e as condições de trabalho tem incentivado a adoção de sistemas pré-fabricados. Entretanto, a adoção desses sistemas exige uma intensa troca de informações entre a obra e a fábrica, de forma a sincronizar a fabricação dos componentes, as operações logísticas e o processo de montagem na obra, principalmente em ambientes engineer-to-order (ETO). Em sistemas do tipo ETO, o pedido do cliente é realizado nas etapas iniciais do projeto, e existe um elevado grau de incerteza principalmente pelo desconhecimento das atividades a serem realizadas. Em ambientes com esse tipo de complexidade, a literatura sugere o uso de Building Information Modeling (BIM) para facilitar o compartilhamento de informações e apoiar a tomada de decisões nesses ambientes, assim como a aplicação de conceitos e princípios da filosofia da Produção Enxuta. Particularmente em relação aos processos de montagem, o uso de BIM 4D pode ser utilizado para simular e analisar algumas operações, apoiando o processo de planejamento e o controle da produção. Esta pesquisa teve como objetivo desenvolver um modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados do tipo engineer-to-order com o apoio da modelagem BIM 4D A abordagem metodológica adotada foi Design Science Research (DSR), sendo desenvolvidos dois estudos empíricos. O primeiro foi realizado em colaboração com uma empresa responsável pelo projeto, fabricação e montagem de estruturas pré-fabricadas de concreto, sendo implementadas diversas melhorias em uma obra de uma universidade. O segundo, de caráter descritivo, foi desenvolvido em um empreendimento de construção de shopping center, sendo envolvidas uma empresa gerenciadora de obra e uma empresa que produziu e montou na obra a estrutura pré-fabricada de concreto. As principais contribuições da aplicação de BIM 4D como suporte à tomada de decisão referem-se ao aumento da confiabilidade do processo de montagem e da produtividade, principalmente pela clareza e rápida atualização das informações geradas pelos modelos 4D. / The growing need to reduce construction project duration and cost, as well as to improve building quality and working conditions, have encouraged the adoption of prefabricated building systems. However, the adoption of those systems requires an intense exchange of information between the construction site and the plant, in order to synchronize the production of components, logistic operations and site assembly, especially in an engineer-to-order (ETO) environment. In ETO systems, the client’s order is placed at the early design stages, and a high degree of uncertainty exists mostly due to the lack of knowledge about the tasks to be carried out. The literature suggests the use of Building Information Modeling (BIM) to facilitate the sharing of information and to support decision-making in this type of environment, as well as the application of Lean Production concepts and principles. Particularly in relation to assembly process, the use of 4D BIM modelling can be used to simulate and analyze some operations, supporting production planning and control This research work aims at to devise a model for the management of logistic processes for engineer-to-order prefabricated building systems, with the support of 4D BIM modelling. Design Science Research was the methodological approach adopted in this investigation, and two empirical studies were carried out. The first one was undertaken in close collaboration with a company that designs, manufactures, and assemble prefabricated concrete structures, and some improvements were implemented in a project for a higher education institution. The second was undertaken in a shopping mall project, and two companies were involved: a project management company, and a company that produced and assembled on-site pre-fabricated structures. As a result of this research work, the application of 4D BIM to support decision-making contributed to improve the reliability of the assembly process and to increase productivity, mainly due to the clarity and timeliness of the information made available by 4D models.
13

Modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados engineer-to-order

Bataglin, Fernanda Saidelles January 2017 (has links)
A crescente necessidade de reduzir os prazos e os custos dos empreendimentos de construção e de melhorar a qualidade das edificações e as condições de trabalho tem incentivado a adoção de sistemas pré-fabricados. Entretanto, a adoção desses sistemas exige uma intensa troca de informações entre a obra e a fábrica, de forma a sincronizar a fabricação dos componentes, as operações logísticas e o processo de montagem na obra, principalmente em ambientes engineer-to-order (ETO). Em sistemas do tipo ETO, o pedido do cliente é realizado nas etapas iniciais do projeto, e existe um elevado grau de incerteza principalmente pelo desconhecimento das atividades a serem realizadas. Em ambientes com esse tipo de complexidade, a literatura sugere o uso de Building Information Modeling (BIM) para facilitar o compartilhamento de informações e apoiar a tomada de decisões nesses ambientes, assim como a aplicação de conceitos e princípios da filosofia da Produção Enxuta. Particularmente em relação aos processos de montagem, o uso de BIM 4D pode ser utilizado para simular e analisar algumas operações, apoiando o processo de planejamento e o controle da produção. Esta pesquisa teve como objetivo desenvolver um modelo para gestão dos processos logísticos em obras de sistemas pré-fabricados do tipo engineer-to-order com o apoio da modelagem BIM 4D A abordagem metodológica adotada foi Design Science Research (DSR), sendo desenvolvidos dois estudos empíricos. O primeiro foi realizado em colaboração com uma empresa responsável pelo projeto, fabricação e montagem de estruturas pré-fabricadas de concreto, sendo implementadas diversas melhorias em uma obra de uma universidade. O segundo, de caráter descritivo, foi desenvolvido em um empreendimento de construção de shopping center, sendo envolvidas uma empresa gerenciadora de obra e uma empresa que produziu e montou na obra a estrutura pré-fabricada de concreto. As principais contribuições da aplicação de BIM 4D como suporte à tomada de decisão referem-se ao aumento da confiabilidade do processo de montagem e da produtividade, principalmente pela clareza e rápida atualização das informações geradas pelos modelos 4D. / The growing need to reduce construction project duration and cost, as well as to improve building quality and working conditions, have encouraged the adoption of prefabricated building systems. However, the adoption of those systems requires an intense exchange of information between the construction site and the plant, in order to synchronize the production of components, logistic operations and site assembly, especially in an engineer-to-order (ETO) environment. In ETO systems, the client’s order is placed at the early design stages, and a high degree of uncertainty exists mostly due to the lack of knowledge about the tasks to be carried out. The literature suggests the use of Building Information Modeling (BIM) to facilitate the sharing of information and to support decision-making in this type of environment, as well as the application of Lean Production concepts and principles. Particularly in relation to assembly process, the use of 4D BIM modelling can be used to simulate and analyze some operations, supporting production planning and control This research work aims at to devise a model for the management of logistic processes for engineer-to-order prefabricated building systems, with the support of 4D BIM modelling. Design Science Research was the methodological approach adopted in this investigation, and two empirical studies were carried out. The first one was undertaken in close collaboration with a company that designs, manufactures, and assemble prefabricated concrete structures, and some improvements were implemented in a project for a higher education institution. The second was undertaken in a shopping mall project, and two companies were involved: a project management company, and a company that produced and assembled on-site pre-fabricated structures. As a result of this research work, the application of 4D BIM to support decision-making contributed to improve the reliability of the assembly process and to increase productivity, mainly due to the clarity and timeliness of the information made available by 4D models.
14

Analýza obalů vstupních komponent vzhledem k výrobnímu procesu / Packaging Analysis of Incoming Components Considering Manufacturing Process

Drápelová, Eliška January 2016 (has links)
This thesis deals with the packaging of purchased components that enter into the production process. Based on the conducted analysis, proposals have been developed for improving the existing logistics process in order to optimize the processes of reception, registration, and expenditure of purchased components, and to simplify and eliminate basic types of wasteful use and activities that do not bring value into the process.
15

[en] METHODOLOGY FOR MEASURE AND DISASTER RESPONSE ACTIONS IN HUMANITARIAN LOGISTICS / [pt] METODOLOGIA DE DIMENSIONAMENTO E AÇÕES DE RESPOSTA A DESASTRES NA LOGÍSTICA HUMANITÁRIA

RENATA WEBER 13 May 2015 (has links)
[pt] O aumento da ocorrência de desastres naturais no Brasil e a carência de ferramentas de gerenciamentos logísticos eficazes têm demonstrado a necessidade de estruturação e a importância no aprofundamento dos estudos na Logística Humanitária, área ainda recente e com muito a aprimorar. Este trabalho objetiva maximizar o atendimento de ajuda humanitária, minimizando os desperdícios de tempo e recursos na movimentação, entrega e demais atividades de planejamento e resposta ao desastre. Para atingir esse objetivo, foi elaborada uma metodologia de mensuração de desastres a partir da avaliação do cenário afetado na fase inicial de resposta ao desastre e, assim, estabelecida ações padronizadas para permitir a diminuição do improviso e uma maior eficiência na utilização de recursos e proposição de atividades. Neste sentido, esta dissertação procura relacionar as similaridades entre a logística empresarial e a logística humanitária, abordando os aspectos relevantes da primeira que podem ser utilizados para desenvolvimento de ferramentas da segunda. Por fim, exemplifica-se o método proposto através de sua aplicação no município de Bom Jardim, local afetado pelas enxurradas bruscas e inundações em janeiro de 2011 na região serrana do estado do Rio de Janeiro. A metodologia proposta sugere, para os afetados, ações de resposta delineadas através da análise de indicadores que refletem o cenário local e suas necessidades prioritárias. Desta forma, foram percebidas as vantagens reais na utilização da metodologia como ferramenta de gerenciamento de processos para mensuração, proposição de ações de resposta e atendimento de ajuda humanitária. / [en] The increase on occurrence of natural disasters in Brazil and the lack of effective logistics management tools have demonstrated the need for structure and importance in deepening the studies in Humanitarian Logistics, a very recent area which has a lot to be improved. This paper aims to maximize the service in the humanitarian relief, minimizing waste of time and resources in handling, delivery, and other activities on planning and responding to a disaster. To achieve this goal, it was developed a disaster measure methodology that associate the information collected in the initial phase of the disaster response and established standard actions to reduce the improvisation and to allow a more efficient use of resources and proposed activities. Thus, this paper seeks to relate the similarities between the business logistics and humanitarian logistics, addressing the relevant aspects of the first one that can be used to develop tools on the second one. Finally, the proposed method is exemplified through its application in Bom Jardim, a city in the highlands of the state of Rio de Janeiro, affected by sudden floods in January 2011. The proposed methodology suggests, as disaster response, standard actions, by analyzing indicators that reflect the local scene and their priority needs. Finally, the application shows the benefits in the use of this methodology as a process management tool to measure, propose response actions, and provide humanitarian aid.
16

Řízení průběhu zakázky organizací / Manufacuring Order Management in Company

Ružbacký, Bohumil January 2011 (has links)
This master's thesis is focused on analyzing problems during the execution of contracts selected company, which deals with custom manufacturing thermoplastic injection molding. The thesis proposed possible solutions for identified problems.
17

Mejora de la gestión de inventarios para disminuir los ingresos no percibidos de la Empresa Importaciones y Distribuciones Granados SRL

Checa Huaccha, Rodolfo Daniel January 2023 (has links)
Este trabajo de investigación propone la mejora de gestión de inventarios de la empresa Importaciones y Distribuciones Granados SRL, en donde se identificaron problemas acerca de la rotura de stock de un 33% ocasionando un ingreso no percibido de S/1 012 898,69, tiene un nivel de servicio del 84%, la empresa posee baja rotación de productos, esto simboliza un 33% del dinero paralizado, teniendo un total de ingresos no percibidos de S/1 301 092,45. Se tiene como principal objetivo, mejorar la gestión de inventarios de la empresa Importaciones y Distribuciones Granados SRL para disminuir los ingresos que no son percibidos. Se desarrollo la clasificación ABC a los repuestos y se procedió a calcular indicadores actuales; para la selección del modelo se calcularon los costos de los modelos Q y P, además se realizó una matriz de enfrentamiento para determinar el modelo a utilizar, consecutivamente se halló el modelo de revisión periódica (P), posteriormente se hallaron los indicadores de la mejora; se efectuaron mejoras en los procesos logísticos, se implementaron capacitaciones a los trabajadores, se implementó la metodología 5S y se propuso un sistema ERP, por último se logró calcular el costo-beneficio de todas las propuestas planteadas. Con el resultado obtenido se redujo la rotura de stock a 5%, esto ocasiono que se incremente el nivel de servicio a 95% y se disminuyó el dinero inmovilizado a 2%, por último, se consiguió un beneficio-costo de S/1,42, esto significa que cuando se invierte S/1,00, se logrará un beneficio de S/0,42. / This research work proposes the improvement of inventory management of the company Importaciones y Distribuciones Granados SRL, where problems were identified about the stock out of 33% causing an unperceived income of S / 1 012 898.69, has a service level of 84%, the company has low product turnover, this symbolizes 33% of the paralyzed money, having a total of non-perceived income of S/1,301,092.45. The main objective is to improve the inventory management of the company Importaciones y Distribuciones Granados SRL to reduce the income that is not received. The ABC classification was developed for the spare parts and current indicators were calculated; For the selection of the model, the costs of the Q and P models were calculated, in addition, a confrontation matrix was made to determine the model to be used, consecutively the periodic review model (P) was found, subsequently the indicators of improvement were found. ; Improvements were made in the logistics processes, worker training was implemented, the 5S methodology was implemented and an ERP system was proposed, finally it was possible to calculate the cost-benefit of all the proposals raised. With the result obtained, stock breakage was reduced to 5%, this caused the service level to increase to 95% and the immobilized money was reduced to 2%, finally, a benefit-cost of S / 1 was achieved, 42, this means that when S/1.00 is invested, a profit of S/0.42 will be achieved.
18

Uma análise investigativa da logística de classe mundial e do ciclo do processo logístico de exportação nas empresas exportadoras brasileiras

Felix, Ester 31 August 2011 (has links)
Made available in DSpace on 2016-03-15T19:30:50Z (GMT). No. of bitstreams: 1 Ester Felix.pdf: 2231712 bytes, checksum: 0557a4cbaa0a2520b66ae1a3d4a89c81 (MD5) Previous issue date: 2011-08-31 / Fundo Mackenzie de Pesquisa / The international logistics perform an important role in the global supply chain due to the strong worldwide competition. In this context, a study was carried based on the rationale thinking of international logistics management authors and World Class Logistics model, with the purpose of analyzing the impact of the international logistics cycle activities and the World Class Logistics model competencies on Exporter Flow time. The study was divided into two stages. The first stage, from exploratory nature, of qualitative type, had as its objective to study this phenomenon more deeply and to be familiar with the objective of it. Data was collected through detailed interviews with seven businessmen from Brazilian exporters companies, by maritime modal, from the following sectors: sugar, capital equipment, coffee, paper and wood, and orange juice, treated by content analysis. The information of this analysis through interviews showed that the most important measurement variables, in the international logistics management of each construct of Exporter Logistics Process Cycle were: ―Costs‖, the most mentioned, by 41,6% of exporters interviewed, followed by the following variables: Quality, with 17,6%, Agility, with 14,6% and Confiability, with 11,2%. With the results of the first phase we moved to the second phase, of descriptive nature, of quantitative type, in which the purpose was to identify the correlations among the Exporter Logistics Process Cycle, the World Class Logistics model and the Exporter Flow time. A semi structured survey was used to collect information which was applied to the exporters from the following sectors: sugar, capital equipment, coffee, paper and wood and soya, with the return of 56 surveys answered. Data obtained had been treated through descriptive and multivariate statistics, proved that the Exporter Logistics Process Cycle activities and the World Class Logistics competencies are important to the International Logistics even though they were not statiscally meaningful in the level (α ≤ 0,05) in order to reduce Expoter Flow time. Due to the results obtained, we can conclude the Exporter Logistics Process Cycle activities and World Class Logistics competencies, still need to be worked in order to cause an impact in the time reduction of the Exporter Flow. / A logística internacional desempenha um importante papel na cadeia de suprimentos global face à forte competição universal. Neste contexto, realizou-se um estudo fundamentado na linha de pensamento de autores da gestão logística internacional e do modelo de Logística de Classe Mundial, com o objetivo de analisar o impacto das atividades do Ciclo do Processo Logístico de Exportação e das competências logísticas do modelo de Logística de Classe Mundial no tempo do Fluxo de Exportação. O estudo foi dividido em duas etapas. A primeira etapa, de natureza exploratória, do tipo qualitativo, objetivou estudar o fenômeno com maior profundidade e obter familiaridade com o objeto de estudo. Os dados foram coletados por meio de entrevistas em profundidade junto a sete executivos de empresas exportadoras brasileiras, via modal marítimo, dos setores de: açúcar, bens e capital mecânico, café, papel e celulose e suco de laranja, tratadas pela análise de conteúdo. As informações desta análise extraídas mediante entrevistas revelaram que, na gestão da logística internacional, as variáveis de desempenho mais importantes em cada constructo do Ciclo do Processo Logístico de Exportação, foram: ―Custos‖, como mais citada, por 41,6% exportadores entrevistados, seguido das seguintes variáveis: Qualidade com 17,6%, Agilidade com 14,6%, e Confiabilidade com 11,2%. De posse dos resultados da primeira etapa, prosseguiu-se para a segunda etapa, de natureza descritiva, do tipo quantitativo, em que se objetivou identificar as correlações entre o Ciclo do Processo Logístico de Exportação, o modelo de Logística de Classe Mundial e o tempo do Fluxo de Exportação. Para a coleta dos dados, utilizou-se um questionário semiestruturado que foi aplicado junto aos exportadores dos seguintes segmentos: açúcar, bens e capital mecânico, carne, café, papel e celulose e soja, obtendo-se retorno de 56 questionários. Os dados obtidos tratados por meio da estatística descritiva e multivariada, evidenciaram que as atividades do Ciclo do Processo Logístico de Exportação e as competências do modelo de Logística de Classe Mundial são importantes na logística internacional, apesar de, não terem sido estaticamente significantes em nível (α ≤ 0,05) para influir na redução do tempo do Fluxo de Exportação. Por conta dos resultados obtidos, pode-se concluir que as contribuições das atividades do Ciclo do Processo Logístico de Exportação e das competências do modelo de Classe Mundial para que possam impactar na redução do tempo do fluxo de exportação, ainda, necessitam ser trabalhadas.
19

Studie optimalizace řízení zásob / The Study of Inventory Management Optimalization

Hudec, Jiří January 2007 (has links)
This master´s thesis deals with problems of inventory control optimalization in a business company. It contains theory data, company analyses and its market position, an analysis of information systems and inventory control in use, its evaluation and own recommendation leading to the optimalization.
20

Analýza výroby a logistiky ve vybraném podniku potravinářské výroby / Production and logistics analysis in the chosen company producing food products

GONDEK, Petr January 2007 (has links)
The diploma work deals with the analysis of the logistic chain of the company Friall s.r.o., which is a producer of frozen potato specialities. Based on this analysis I wanted to discover weak points in functionality of the logistic chain and find suitable precautionary measures as well as solutions leading to an improvement of the current situation. The diploma work is focused on the raw material entry and self-production of the products.

Page generated in 0.1085 seconds