• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Aplicação de método AHP para priorização de processos gerenciais na adoção de sistemas de gestão integrada no setor da construção civil: estudo aplicado em uma construtora

Moura, Luciana de Mendonça Santos Braatz 19 February 2014 (has links)
Made available in DSpace on 2016-06-02T19:52:04Z (GMT). No. of bitstreams: 1 5891.pdf: 12093424 bytes, checksum: 2f4be2e6dd8f12b62c9c9f9c787c2888 (MD5) Previous issue date: 2014-02-19 / Considering the representativeness of the Construction sector in the national economy, there is an increase in demand for the use and adaptation of concepts, techniques and methods developed for the manufacturing environment aiming to improve the production and management performance of companies. The use of information systems, especially ERP, has being the focus of several studies in the last decade. Thus, it is considered that the matter "ERPs" for construction, specifically considering the use of methods of decision making with multiple criteria, is far from being fully consolidated, and this research contributes to society and the academic community to enrich this discussion. The main objective of this work is to apply a form of prioritization of management processes to assist the selection of ERP system in construction company aimed at improving the flow of information held between the management system and production system, providing improved management processes management. The method of making multiple decision criteria provided AHP prioritization processes that must be considered in the selection and adoption of an ERP. The research supports the view of many studies that link the analysis of the internal processes of a company as relevant to the adoption of management information systems, as these should be oriented to business processes and not the opposite. Considering the importance of the issues raised by the analysis of the proposed case, the prioritization process, systematized by applying the AHP method can be considered as one (and not only) the guidelines in the selection of ERP systems available in the market process. / Considerando a representatividade do setor da Construção Civil na economia nacional, observa-se um aumento na demanda pela utilização e adaptação de conceitos, técnicas e métodos desenvolvidos para o ambiente de manufatura visando aprimorar o desempenho produtivo e gerencial das empresas. A utilização de sistemas de informação, em especial o ERP, está sendo o foco de diversas pesquisas nesta última década. Desta forma, considera-se que a temática adoção de ERP para Construção Civil pesada, especificamente considerando o uso de métodos de tomada de decisão com múltiplos critérios, encontra-se distante de estar completamente consolidada, e assim, a presente pesquisa contribui para a sociedade e para a comunidade acadêmica com o enriquecimento desta discussão. O objetivo principal deste trabalho é aplicar uma forma de priorização dos processos gerenciais para auxiliar a seleção de sistema ERP na indústria da construção civil pesada visando à melhoria do fluxo de informações realizado entre o sistema gerencial e o sistema de produção, proporcionando melhoria nos processos de gestão gerencial. O método de tomada de decisão múltiplos critérios AHP proporcionou a priorização de processos que devem ser considerados na seleção e adoção de um sistema ERP. A pesquisa corrobora a visão de diversos estudos que apontam a análise dos processos internos de uma empresa como relevante para a adoção de sistemas de informação gerenciais, pois estes devem ser orientados aos processos da empresa e não o inverso. Considerando a relevância dos aspectos levantados pela análise do caso proposto, a priorização de processos, sistematizada através da aplicação do método AHP, pode ser considerada como uma (e não a única) das diretrizes no processo de seleção de sistemas ERP disponíveis no mercado.
2

Aplicação de método de tomada de decisão multicritério para priorização de projetos Lean Six Sigma / Application of multi-criteria decision-making method for Lean Six Sigma projects prioritization

Rolando, Daniel Augusto Rainha [UNESP] 16 February 2018 (has links)
Submitted by DANIEL AUGUSTO RAINHA ROLANDO null (danielrolando@gmail.com) on 2018-04-05T16:00:00Z No. of bitstreams: 1 Dissertação_Rolando-DAR.pdf: 3156622 bytes, checksum: ac92904a2c656de7add0c53bd32f6e49 (MD5) / Approved for entry into archive by Pamella Benevides Gonçalves null (pamella@feg.unesp.br) on 2018-04-06T18:54:51Z (GMT) No. of bitstreams: 1 rolando_dar_me_guara.pdf: 3156622 bytes, checksum: ac92904a2c656de7add0c53bd32f6e49 (MD5) / Made available in DSpace on 2018-04-06T18:54:51Z (GMT). No. of bitstreams: 1 rolando_dar_me_guara.pdf: 3156622 bytes, checksum: ac92904a2c656de7add0c53bd32f6e49 (MD5) Previous issue date: 2018-02-16 / Para a delimitação de um processo de tomada de decisão na escolha de projetos Lean Six Sigma, é necessário definir os fatores críticos, tanto de sucesso (como por exemplo: envolvimento e comprometimento da gestão, entendimento das ferramentas e técnicas do Lean Six Sigma, ligação do projeto com a estratégia de negócios) quanto de fracasso (como por exemplo a falta do envolvimento da gestão, resistência à mudança cultural, inexistência de gestão de projetos). Desta forma, este trabalho foi conduzido por meio de modelagem com validação de dados reais, com o objetivo de propor uma adaptação de métodos de auxílio à tomada a decisão para seleção de projetos Lean Six Sigma baseado nos fatores críticos de sucesso e fracasso. Para tanto, com base na revisão da literatura, foram identificados os fatores críticos de sucesso e fracasso para seleção de projetos Lean Six Sigma. Em seguida, uma análise de dois métodos de tomada de decisão multicritério, PROMETHEE e ANP, foi realizada por meio da aplicação dos modelos em um portfólio de projetos de uma empresa multinacional de grande porte. Como resultado, houve assertividade de 95% na seleção dos melhores projetos do portfólio, comparado aos projetos executados pela empresa mostrando-se que os dois modelos são aderentes ao problema. Como resultado, é possível constatar que o PROMETHEE se mostrou mais assertivo, principalmente nas comparações quantitativas, tendo aplicabilidade tanto para decisões individuais quanto em grupos. O ANP, por fazer a análise de preferência dos critérios de forma pareada (utilizando a escala comparativa de Saaty) torna mais fácil seu em grupos grandes de decisores, porém a comparação utilizando a escala de Saaty dificulta a análise de critérios quantitativos, bem como para pequenos grupos ou em decisões individuais. / To define a decision-making process in the Lean Six Sigma projects’ choice, it is necessary to define the critical success factors (e. g., management involvement and commitment, understanding the tools and techniques of Lean Six Sigma methodologies), and critical failure factors (e. g., lack of management involvement, cultural change resistance, project management weakness, etc.). In this way, this work was conducted through the modeling method with the objective of proposing an adaptation of decision-making aid methods process to select Lean Six Sigma projects based on the critical success and critical failure factors. Therefore, based on the literature review, the critical success and critical failure factors for the selection of Lean Six Sigma projects were identified. An analysis of two multi-criteria decision-making methods, PROMETHEE and ANP, was performed through the application of the models in a project portfolio of a large multinational company, presenting 95% assertiveness in the selection of the best portfolio projects compared to the executed projects by the company, showing that the two models are adherent to the problem. In addition, PROMETHEE has been more assertive, mainly in quantitative comparisons, and the use of the method are applied for both individual and group decisions; the ANP, by doing the preference analysis of the criteria in pair-to-pair way, using the Saaty’s comparative scale, makes it easier in large groups of decision makers. However, the comparison using the Saaty scale makes it difficult to analyze quantitative criteria as well as small groups or in individual decisions

Page generated in 0.108 seconds