81 |
Models for optimal utilization of production resources under demand selection flexibilityTaaffe, Kevin Michael. January 2004 (has links)
Thesis (Ph. D.)--University of Florida, 2004. / Title from title page of source document. Document formatted into pages; contains 186 pages. Includes vita. Includes bibliographical references.
|
82 |
Window-based project scheduling algorithms /Smith, Tristan, January 2004 (has links)
Thesis (Ph. D.)--University of Oregon, 2004. / Typescript. Includes vita and abstract. Includes bibliographical references (leaves 189-198). Also available for download via the World Wide Web; free to University of Oregon users.
|
83 |
Models and algorithms for operations scheduling problems with resource flexibility and schedule disruptionsYang, Bibo. January 2004 (has links)
Thesis (Ph. D.)--University of Florida, 2004. / Title from title page of source document. Document formatted into pages; contains 152 pages. Includes vita. Includes bibliographical references.
|
84 |
Real-time scheduling and control of a flow-shop using dioid algebra /Yurdakul, Mustafa, January 1997 (has links)
Thesis (Ph. D.)--Lehigh University, 1997. / Includes vita. Bibliography: leaves 149-155.
|
85 |
Reinforcement learning for job-shop scheduling /Zhang, Wei, January 1900 (has links)
Thesis (Ph. D.)--Oregon State University, 1996. / Typescript (photocopy). Includes bibliographical references (leaves 159-170). Also available on the World Wide Web.
|
86 |
Batch production smoothing with variable setup and processing timesYavuz, Mesut. January 2005 (has links)
Thesis (Ph. D.)--University of Florida, 2005. / Title from title page of source document. Document formatted into pages; contains 277 pages. Includes vita. Includes bibliographical references.
|
87 |
A space-constrained resource-constrained scheduling system for multi-story buildings /Thabet, Walid Y., January 1992 (has links)
Thesis (Ph. D.)--Virginia Polytechnic Institute and State University, 1992. / Vita. Abstract. Includes bibliographical references (leaves 425-430). Also available via the Internet.
|
88 |
Time continuity in discrete time models new approaches for production planning in process industries /Suerie, Christopher. January 1900 (has links)
Thesis (doctoral)--Universität, Darmstadt. / Includes bibliographical references (p. [203]-216).
|
89 |
Heuristic models for serviceman routing in the telephone industryFeder, Terry Lee, January 1900 (has links)
Thesis (Ph. D.)--University of Wisconsin--Madison, 1969. / Typescript. Vita. eContent provider-neutral record in process. Description based on print version record. Includes bibliographical references.
|
90 |
Highway bridge construction production rates for time estimationHuh, Youngki, O'Connor, James Thomas, January 2004 (has links)
Thesis (Ph. D.)--University of Texas at Austin, 2004. / Supervisor: James T. O'Connor. Vita. Includes bibliographical references. Also available from UMI.
|
Page generated in 0.0201 seconds