Spelling suggestions: "subject:"barking."" "subject:"arking.""
481 |
Stavebně technologický projekt parkovacího objektu v Brně / Construction technological project of the parking object in BrnoDružbík, Michal January 2016 (has links)
The thesis contains the main part of the building and technological project storey car park on the Panenská street in Brno. There is prepared a technical report on the structural and technological project studies the implementation of major technological stages, coordinating construction situation with broder relations roadways, time and financial plan construction, project construction site, design of building machines and mechanisms, the schedule of the main building structure, a plan for securing material resources for monolithic construction, technological regulation for the implementation of horizontal bearing structures, inspection and test plan for horizontal structure, a manual for use of the parking building and an itemized budget.
|
482 |
BIKEZONE.cz - Cykloprodejna s bytovými jednotkami / BIKEZONE.cz - Bikeshop with flatsBarták, Martin January 2016 (has links)
The aim of the diploma thesis „BIKEZONE.CZ – bikeshop with flats“ is development of detailed documentation to build the bikeshop with flats for permanent living for sixty person on the land number 337/4, in the city named Hradec Králové – Kukleny. The building is designed with the master plan and the surrounding construction and appropriately mounted on the adjacent intersection. The building is designed as a four-floors, partial basement with two-floors bikeshop with own service and the flat part with seventeen flats of the size two or three bedrooms with kitchen. Next to building are designed two car parkings with capacity for 25 cars. The main entrance to the shop is from the street Pražská třída where is a parking for customers a the main entrace to the flat house is from the street Pálenecká. The supporting part will consist of a combination of sand-lime bricks KM BETA and monolithic ceiling and column. The non-supporting part will of sand-lime bricks KM BETA. The roof is flat with a waterproofing membrane of flexible PVC surcharge laundered gravel. Insulation of the building envelope will contact system ETICS terminated blending facade of dark and light gray colors. Doors and windows are wooden with golden oak color shade.
|
483 |
Bytový dům / Block of FlatsJánská, Kamila January 2017 (has links)
Diploma thesis describes the design and processing of project documentation of the apartment building. The apartment building is located in the central part of the city of Brno, in the district of Štýřice. The building has 5 floors. Its basementless with flat roof and it is based on the footings of plain concrete. Load-bearing, peripheral walls and partitions are designed from ceramic blocks POROTHERM. Ceiling construction is designed to be assembled of ceramic ceiling fittings MIAKO built on POT supports. Peripheral walls of all floors are insulated with external thermal insulation composite system ETICS with thermal insulation of mineral wool. In the place of the plinth is wool replaced by XPS polystyrene. In the facade there are anchored wooden lattice constructions using ProPasiv anchors. These constructions are covered by façade cladding sheets CEMBRIT METRO and they devide whole building into separate units. There is housing and communal part of the building. On the first floor there are storage areas, the main service room, utility room and two barrier-free apartments. In the second to the fifth floor there are 9 residential units, one of which is designed as duplex apartment . All floors are connected by staircase and wheelchair lift. Parking for 17 cars is designed in front of the building . Two parking spaces are wheelchair accessible.
|
484 |
Polyfunkční dům v Brně / Mixed-use building in BrnoKopecký, Lukáš January 2017 (has links)
This thesis describes the design and processing of project documentation multifunctional house. The multifunctional building is located in the central part of the city of Brno, in the district of Štýřice. This is a five-storey, basementless building with a flat roof on two levels. The building is based on foundations made of plain concrete. Supporting, peripheral and partition walls are designed from ceramic blocks POROTHERM. Ceiling construction is designed to be assembled of ceramic ceiling fittings MIAKO stored on POT beams. External walls of all floors are insulated using an external ETICS with thermal insulation made of mineral wool, which is replaced by XPS polystyrene used for plinth. Part of the facade is designed as ventilated, consisting of trusses of wood and sheathed by cladding panels CEMBRIT METRO. This architecturally divide the building into separate units. The building includes parts of the administrative, residential parts and parts for business purposes. On the first floor there are areas of common storage area of the apartment house, the main utility room, utility room. Furthermore, there is an administrative part, where are the reception facilities for reception, sanitary facilities for employees and office work. Part of the first floor is also a small shop with warehouse and facilities for employees. The second floor is a residential unit and the second part of the administrative unit. Third to the fifth floor is only residential and there are 6 residential units. All floors are connected by staircase and a wheelchair lift. In front of the building is designed parking lot for 20 cars. One of the parking space is wheelchair accessible.
|
485 |
Cinema point / Cinema pointHrůza, Jiří January 2017 (has links)
The diploma thesis solves a theater with a cafe in the town of Humpolec in the Vysočina Region. It contains complete documentation for execution, assessment in terms of fire safety and in terms of building physics. Furthermore, the proposal ventilation for cinema, foyer and cafe. There is a cinema and a cafe, which is located on the second floor. Cinema is designed with a capacity of 196 seats, of which 5 seats are reserved for people with limited mobility. Screening is provided as 2D mode and 3D projection. The café is designed for moviegoers and the general public. The café seats 36 seats. The building is designed as a two storey with dissected floor plan with rounded shapes with no sharp edges with a protruding portion of the roof of cinema, which is located on the north side of the building and has the function division of the building into individual units. The building has dimensions of 39.15 meters x 29.45 meters. The supporting structure of the building consists of reinforced concrete reinforced walls and ceilings. In the southern part of the building with rooms Foyer café is designed glass facade of the LOP. Supporting roof structure over the cinema hall is made up of wooden trusses joined punched punched plates.
|
486 |
Revitalizace sidliště Padělky ve Ždánicích / Revitalization of the Padělky housing estate in ŽdániceCulek, Lukáš January 2022 (has links)
The main point of this diploma thesis is revitalization of housing estate called Padělky in Ždánice. The housing estate is located in the northwestern part of the village. There are nine roads in zone 30. Two of them were already repaired in the first stage. The housing estate is without a transport solution and without the possibility of legal parking. Now the roads are devastated, there are potholes, holes and cracks. Six roads were reconstructed, two were extended. This brought the possibility of detours and improved transport. The new design legalizes the parking space. There are new built parking spaces, too. Conditions for the inhabitants of the housing estate are improving. There are new trees, bushes, rosary, furniture and waste bins. The public lighting will be replaced.
|
487 |
ResPublica/Civitas Socialis – Strachotín, l. p. 2017 / ResPublica/Civitas Socialis - StrachotínSysel, Tomáš January 2017 (has links)
The theme of the development of the existing sports grounds was dealt with Based on a number of analyzes, visits to the site and communication with the community management, the theme of the development of the existing sports grounds was dealt with. The whole territory is up to a football field in a very maintained conditions. There are two smaller accommodation facilities, which are seasonally used mainly by schools in nature and other students, but their condition is quite unsatisfactory. The soccer field, which is the only one maintained, belongs to the existing base of soccer players - the dressing room with the clubhouse. Their condition is also somewhat aggravated. In the current spatial plan, the whole proposed area is at the interface of two areas, the first is the area of sport and individual recreation and the second is the area to be examined. Urban design is based on the location of the existing soccer field and the preservation or improvement of existing links to the surrounding area. Most of the paved areas will be overtaken. Part of the design of the development of sports activities in the village was also to find a possible solution for parking for tourists, for which there is no free space in the village. The chosen location is advantageous in that, when a parking lot will be created, it will be created near the main entrance to the village on road II. Cl. No. 420 from Hustopeče through the village. Architectonically, but also conceptually, the construction is based on the economic possibilities of the municipality, the possibilities of variability of the solution and especially of the possibilities of staging construction. The result are two buildings. One main, replacing the background of spccer players, creates the conditions for year-round training in the new gym, for going to fitness, while part of the building is a platform for the soccer field. The second building is an accommodation that replaces the existing unsatisfactory buildings. Architecturally, they are masses that are greatly affected by the modules. The building structure and the facilities of the sports hall are structurally designed from standardized modular systems, steel containers that are interconnected to create an unusual spectacle. The area of the gym is defined by a reinforced concrete skeleton. Both buildings are covered with gold anodized sheet metal, which is profiled similarly to the peripheral walls of the containers. At the same time, the object was to create year-round sports grounds that are accessible to the general public and youth.
|
488 |
A Space for Us : Rethinking public space for the common good.Feil, Ekaterina January 2021 (has links)
This design project delves into the realm of public spaces, considering sociocultural, sociopolitical, and participatory design aspects, catalyzed by the Covid-19 pandemic's lockdowns. By repurposing a parking lot, the project endeavors to scrutinize, trial, and understand the reactions and needs through a design interaction and multifunctional furniture set, the simple story of Prototype.
|
489 |
Centrum pro sport a volný čas Brno / Sports and Leisure Centre BrnoChovanečková, Nikol January 2017 (has links)
The theme of the dissertation titled the Centre of Sport and Leisure Time in Brno is a design of a relaxing and sport site „Centrum Lužánky“. The subject of this project is architectonic-city-planning study, which deals with elaborating a concept of a sport centre behind Lužánky in Brno-Ponava. This dissertation contains details of the facility and the area of the current swimming pool Lužánky. The current state of the facility built in 1979 doesn’t meet requirements of visitors and sportsmen anymore. The main aim of this project is the reconstruction of the current fifty-meter swimming pool, a design of a new swimming pool placed under the ground floor of the current building, which will provide space for organizing international competitions, trainings of professional sportsmen, etc. At the same time the busyness of the current swimming pools would be lowered by building a new indoor and outdoor waterpark, especially for the group of recreational visitors. The attractiveness of the facility will be increased by the newly designed park relaxing area and proposed multipurpose area, used as a sports field in the summer and as an ice ring in the winter. Additional value of the facility is comprised by an indoor and outdoor café and large relaxing area on the roof of the waterpark. The whole area increases the community facility availability by a proposed wide range of services for health, relax and sport. The advantage of the whole concept is the mutual connection of all facilities. The entrance to the area is shortened by a designed pedestrian bridge, accessible from the south and north busy areas. The whole project is enhanced by increased number of new parking places, located particularly along the access road, the street Sportovní, going through a green zone. The road and parking places are proposed in the design of residential streets, respecting walking pedestrians. The area has a very rich sport history, which is dated back to 1922. The new concept increases th
|
490 |
Brněnské nábřeží - rehabilitace brněnských řek a jejich blízkého okolí / Brno waterfront - rehabilitation of rivers and their surrounding areasVrba, Petr January 2017 (has links)
The theme of the diploma thesis "Brno waterfront - rehabilitation of the Brno rivers and their surroundings" is creating an urban proposal in Brno, Zábrdovice, on the eastern waterfront of the Svitava river. The intention is to use the potential of the area and create the possibility of lucrative housing by river with a commercial ground floor, services, leisure time park with a multifunctional playground and easy direct access to the Svitava river. The studied location, has an area of 6.32 hectares andis defined mainly by the Zábrdovická Street and the Svitava River near the former Premonstratensian Monastery, which now serves as a Military Hospital. At present, the location has mainly low-floor industrial buildings with storage and expedition functions. The proposed buildings relate to existing buildings on the east and west banks of the Svitava River. They have the form of four to six storey blocks, which are characteristic for this area. The park connects to the revitalized eastern embankment of the river at the site of a new footbridgethat connects both rive sides and stairs. They provide space formeetings and relaxation, but also serve as a flood control in the event of a water inflow. Along the Svitava River there is a sidewalk with street alleyways and access to the river.
|
Page generated in 0.0516 seconds