• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 54
  • Tagged with
  • 54
  • 54
  • 50
  • 49
  • 39
  • 37
  • 28
  • 24
  • 23
  • 23
  • 19
  • 19
  • 18
  • 17
  • 17
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
41

Estudos de casos em sistemas de energia elétrica por meio do fluxo de potência ótimo e da análise de sensibilidade / Studies of cases in power systems by optimal power flow and sensitivity analysis

Alessandra Macedo de Souza 21 February 2005 (has links)
Este trabalho propõe estudos de casos em sistemas de energia elétrica por meio do Fluxo de Potência Ótimo (FPO) e da Análise de Sensibilidade em diferentes cenários de operação. Para isso, foram obtidos dados teóricos, a partir de levantamento bibliográfico, que explicitaram os conceitos de otimização aplicados ao sistema estático de energia elétrica. A pesquisa fundamentou-se metodologicamente no método primal-dual barreira logarítmica e nas condições necessárias de primeira-ordem de Karush-Kuhn-Tucker (KKT) para o problema de FPO, e no teorema proposto por Fiacco (1976) para a Análise de Sensibilidade. Os sistemas de equações resultantes das condições de estacionaridade, da função Lagrangiana, foram resolvidos pelo método de Newton. Na implementação computacional foram usadas técnicas de esparsidade. Estudos de casos foram realizados nos sistemas 3, IEEE 14, 30, 118, 300 barras e no equivalente CESP 440 kV com 53 barras, em que foi verificada a eficiência das técnicas apresentadas. / This work proposes a study of cases in power systems by Optimal Power Flow (OPF) and Sensitivity Analysis in different operation scenarios. For this purpose, theoretical data were obtained, starting from a bibliographical review, which enlightened the optimization concepts applied to the static system of electrical energy. The research was methodologically based on the primal-dual logarithmic barrier method and in the first-order necessary Karush-Kuhn-Tucker conditions to the OPF problem and in the theorem proposed by Fiacco (1976) to the Sensitivity Analysis. The equation sets generated by the first-order necessary conditions of the Lagrangian function, were solved by Newton\'s method. In the computational implementation, sparsity techniques were used. Studies of cases were carried out in the 3, IEEE 14, 30, 118, 300 buses and in the equivalent CESP 440 kV 53 bus, where the efficiency of the presented techniques was verified.
42

Planejamento da operação de sistemas de distribuição de energia elétrica com geradores distribuídos / Operation planning of distribution systems with distributed generation

Chuma Cerbantes, Marcel [UNESP] 09 March 2017 (has links)
Submitted by MARCEL CHUMA CERBANTES null (marcel.chuma@gmail.com) on 2017-04-16T19:19:19Z No. of bitstreams: 1 phd_dissertation_marcel_chuma_cerbantes.pdf: 2683152 bytes, checksum: bb2fddaeed33cb6c6ee2f902e3624178 (MD5) / Approved for entry into archive by Luiz Galeffi (luizgaleffi@gmail.com) on 2017-04-18T17:43:20Z (GMT) No. of bitstreams: 1 chumacerbantes_m_dr_ilha.pdf: 2683152 bytes, checksum: bb2fddaeed33cb6c6ee2f902e3624178 (MD5) / Made available in DSpace on 2017-04-18T17:43:20Z (GMT). No. of bitstreams: 1 chumacerbantes_m_dr_ilha.pdf: 2683152 bytes, checksum: bb2fddaeed33cb6c6ee2f902e3624178 (MD5) Previous issue date: 2017-03-09 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior (CAPES) / Fundação de Amparo à Pesquisa do Estado de São Paulo (FAPESP) / Neste trabalho propõe-se o desenvolvimento de uma ferramenta computacional para o planejamento da operação de curto prazo de sistemas de distribuição com geração distribuída (GD) considerando uma abordagem probabilística. Uma modelagem sequencial formulada com base na perspectiva das companhias de distribuição (DisCos) é proposta. As decisões operacionais da DisCo são inicialmente otimizadas no estágio de operação day-ahead (DA) e, então, na operação real-time (RT). A operação DA visa maximizar a diferença entre a energia vendida aos consumidores e as compras realizadas no mercado de eletricidade atacadista e da GD, ou seja, os lucros. No estágio RT, busca-se a minimização dos ajustes necessários para acomodar os desvios das quantidades previstas no planejamento DA. Modelos de cargas dependentes de tensão e restrições relacionadas à demanda são explicitamente formulados. A rede é representada através de equações de fluxo de potência AC completo. Propõe-se ainda a incorporação de um mecanismo para precificação nodal de potência reativa. Os modelos resultantes são caracterizados como programas de otimização matemática multiperíodo de grande porte não lineares e não convexos com variáveis contínuas e discretas. Um algoritmo pseudodinâmico baseado na meta-heurística Busca Tabu (BT) é proposto para solução do problema resultante de maneira eficaz, sem linearizações. Os resultados obtidos para alimentadores de distribuição de 69 e 135 barras ilustram a eficiência da metodologia proposta. / In this work, we propose a solution solution procedure for the short-term operation planning of distribution systems with distributed generation (DG) considering a probabilistic approach. A sequential formulation based on the distribution company's (DisCo's) perspective is presented. The DisCo’s operational decisions are optimized first in a day-ahead (DA) operation stage, and then in real-time (RT). The DA operation maximizes the difference between the energy sold to customers and the purchases from the wholesale electricity market and distributed generators. In RT, the objective is to minimize the adjustments that are required to accommodate deviations from forecasted quantities. The voltage-sensitiveness of power load injections and demand related constraints are explicitly formulated. The network is modeled using full ac power flow equations. In addition, a nodal-based reactive power pricing mechanism is proposed to be incorporated in the formulation. The resulting models are characterized as large-scale non-linear non-convex mathematical programs with continuous and discrete variables. A pseudo-dynamic Tabu Search (TS)-based solution algorithm is used to tackle the problem in an effective manner, without linearizations. Numerical results from the 69-bus and 135-bus distribution test feeders illustrate the performance of the proposed approach. / FAPESP: 2013/13070-7 / FAPESP: 2014/22314-0
43

Resolução do problema de fluxo de potência ótimo reativo via método da função lagrangiana barreira modificada / Resolution of reactive optimal power flow problem via method of Lagrangian modified barrier function

Vanusa Alves de Sousa 08 June 2006 (has links)
Este trabalho propõe uma abordagem que utiliza uma associação dos métodos de barreira modificada e de pontos interiores primal-dual para a resolução do problema de fluxo de potência ótimo (FPO) reativo. Para isso, foi realizado um levantamento bibliográfico que explicitou os conceitos de otimização aplicados ao sistema estático de energia elétrica e os métodos dual-Lagrangiano, Newton-Lagrangiano, primal-dual barreira logarítmica e de barreira modificada. Na abordagem proposta, as restrições canalizadas são desmembradas em duas desigualdades. Estas são transformadas em igualdades a partir do acréscimo de variáveis de folga ou de excesso, as quais são relaxadas e tratadas pela função barreira modificada. Associa-se a esse problema uma função Lagrangiana. O sistema de equações resultantes das condições de estacionaridade da função Lagrangiana foi resolvido pelo método de Newton. Na implementação computacional foram usadas técnicas de esparsidade. Os sistemas elétricos de potência utilizados para verificar a eficiência da abordagem proposta na solução do problema de FPO reativo em três tipos de testes foram o de 3 barras, os do IEEE 14, 30, 118, 162 e 300 barras, o equivalente CESP 440 kV com 53 barras e o equivalente brasileiro sul-sudeste com 787 barras / This work proposes an approach that uses an association of the methods of modified barrier and primal-dual interior points for the resolution of the reactive optimal power flow (OPF) problem. On this purpose, a bibliographical review was accomplished, which enlightened the optimization concepts applied to the static system of electrical energy and the methods dual-Lagrangian, Newton-Lagrangian, primal-dual logarithmic barrier and modified barrier. In this approach, the bounded constraints are transformed in equalities by adding the non-negative slack variables. Those slack variables are relaxed and handled by the modified barrier function. A Lagrangian function is associated to this problem. The equation sets generated by the first-order necessary conditions of the Lagrangian function, were solved by Newton's method. In the computational implementation, sparsity techniques were used. The electric systems used to verify the efficiency of the approach proposed in the solution of the reative OPF problem in three types of tests were of the 3, IEEE 14, 30, 118, 162 and 300 buses, equivalent CESP 440 kV with 53 buses and the equivalent brazilian south-southeast with 787 buses
44

Estudo do acoplamento elétrico-energético no planejamento da operação de curto-curtíssimo prazo utilizando FPOCA / The study of electric-energetic coupling in the short-shortest term operation planning using FPOCA

Luiz Giovani Lopes Rodrigues 15 December 2003 (has links)
Este trabalho traz um estudo inicial do acoplamento elétrico-energético no planejamento da operação de curto-curtíssimo prazo utilizando Fluxo de Potência Ótimo em Corrente Alternada (FPOCA) com o objetivo de averiguar possíveis desvios entre o planejamento energético e o planejamento elétrico. É feita uma análise da influência dos aspectos elétricos do sistema de transmissão no planejamento energético de curto prazo utilizando-se um FPOCA, juntamente com a minimização do custo da geração e das perdas na transmissão. A minimização do custo da geração é feita através de uma otimização do sistema hidrotérmico utilizando-se um Programa de Otimização de Sistema Hidrotérmico (POSH) baseado em um algoritmo simplex convexo e na aplicação da teoria de fluxo em rede, enquanto que a minimização das perdas na transmissão é feita utilizando-se um FPOCA baseado no método Dual-Newton. Estas ferramentas permitem analisar a necessidade de ajustes para compatibilizar a otimização energética e a otimização elétrica de um sistema eletroenergético, e buscar um planejamento \"ótimo\" que atenda os planejamentos energético e elétrico. Dessa forma, a interface elétrico-energética se torna mais \"forte\", pois as metas de geração obtidas pelo planejamento de curto prazo que serão passadas para o planejamento de curtíssimo prazo, já incluem o efeito dos aspectos elétricos do sistema. Isto proporciona um controle dos desvios da trajetória \"ótima\" do sistema, o que contribui para melhorar a otimização global do planejamento da operação eletroenergética. / This work brings a beginning study of the electric-energetic coupling in the short-shortest term operation planning using Optimal Power Flow in Alternate Current (OPFAC) aiming to inquire possible mismatches between the energetic planning and the eletric planning. It is made an analysis of the electrical aspects influence in the short term energetic planning using OPFAC together with the minimization of generation cost and the transmission losses. The generation cost minimization is made for the hidrothermal system optimization using a Hydrothermal System Optimization Program (POSH) based on a convex simplex algorithm and the application of the network flow theory, while the transmission losses minimization is made using an OPFAC based on the Dual-Newton method. These tools allow to analyze the necessity of adjustments to make compatible the energetic optimization and the electric optimization of the power system, and to search an \"optimal\" planning that attends both the energetic planning and electric planning. Like this, the electric-energetic interface becomes strongest, therefore the generation goals gotten by the short-term planning, that will be passed to the shortest-term planning, already includes the effect of the electric system aspects. These one provide the mismatches control in the optimal trajectory of the system and it contributes to improve the global optimization of power system operation planning. The analyzed system is the 440 kV Equivalent System of CESP (Energetic Company of São Paulo), with 53 bus, being 7 generation bus, 85 transmission lines and 48 transformers.
45

Impacto da representação da rede elétrica no planejamento da operação de médio prazo

Souza, Heverton Reis 28 February 2014 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-02-11T12:29:20Z No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Rejected by Adriana Oliveira (adriana.oliveira@ufjf.edu.br), reason: Renata, bom dia! Por favor, confirme se não tem acento no Júnior: Silva Junior, Ivo Chaves da on 2016-02-26T11:58:58Z (GMT) / Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-02-26T12:02:02Z No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-03-03T13:38:08Z (GMT) No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) / Made available in DSpace on 2016-03-03T13:38:08Z (GMT). No. of bitstreams: 1 hevertonreissouza.pdf: 2039435 bytes, checksum: 82a19bf494e9ac400021280fb64ec1ae (MD5) Previous issue date: 2014-02-28 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / O Sistema Interligado Nacional (SIN) possui características peculiares que o torna diferente de qualquer outro no mundo, como por exemplo, predominância de usinas hidrelétricas e uma extensa rede de transmissão. Estas características, aliadas a incerteza nas afluências futuras, conduz a necessidade da realização de vários estudos na área de planejamento da operação. O planejamento da operação energética tem por objetivo determinar metas de geração hidráulica e térmica, de forma a atender o mercado consumidor de energia, com confiabilidade e economicidade, utilizando da melhor forma possível os recursos energéticos disponíveis. Para este propósito são utilizados modelos matemáticos que buscam a minimização do custo total esperado de operação do sistema, dentro de um determinado horizonte de planejamento, utilizando diferentes níveis de detalhamento. O objetivo principal deste trabalho é avaliar alguns impactos da modelagem do sistema elétrico no problema de planejamento da operação de médio prazo. Neste sentido, o sistema de transmissão é representado em sua forma completa, através de equações não lineares que modelam os fluxos de potência ativa e reativa em cada circuito que compõe o sistema elétrico. Além disso, são considerados os limites de tensão nas barras, assim como o limite de carregamento dos circuitos para cada patamar de carga. As usinas hidrelétricas e termelétricas são representadas de forma individualizada, e a função de produtibilidade é modelada através de polinômios de quarto grau. O modelo proposto utiliza Funções de Custo Futuro (FCF) pré-calculadas por um programa de planejamento da operação de médio/longo prazo, baseado em sistemas equivalentes de energia. Neste trabalho foram utilizadas as FCF produzidas pelo programa Modelo de Despacho Hidrotérmico (MDDH), desenvolvido pela UFJF. Entretanto, é importante destacar que outro modelo de decisão estratégica, baseado em sistemas equivalentes de energia, poderia ser adotado para gerar as FCF utilizadas neste trabalho. A metodologia proposta neste trabalho foi avaliada através do estudo de casos tutoriais e de médio porte, objetivando demonstrar os impactos da representação do sistema de transmissão no custo total esperado de operação do sistema e diferenças na estratégia de operação do mesmo. / The Brazilian Interconnected System has unique characteristics that make it different of any other in the world, such as predominance of hydroelectric power plants and an extensive transmission system. These features, combined with uncertainty in future inflows, leads to necessity of conducting several studies on planning of the operation. The energy operation planning aims to determine targets for hydraulic and thermal generation to meet the consumer energy market with reliability and economy, as well as possible using the available energy resources. For this purpose mathematical models that aims to minimize the expected total cost of the system operation, within a given planning horizon, using different levels of detail are used. The main objective of this work is to evaluate some impacts of the transmission system modeling in the long-term operation planning problem. In this sense, the transmission system is included in its complete form, using nonlinear equations that model the active and reactive power flow in the electrical system. In addition, some operation limits are considered, such as bus voltage limits and power flow limits in the transmission lines and transformers, for each load level. The hydroelectric and thermoelectric plants are represented in an individual form and the producibility function is modeled by fourth degree polynomials. The proposed model uses cost-to-go functions calculated from a long term operation planning program based on equivalent energy systems. In this work the cost-to-go functions produced by MDDH program were used. This program was developed by the Federal University of Juiz de Fora (UFJF). However, it is important to point out that any other model of strategic decision, based on equivalent energy systems, could be used to generate the cost-to-go functions. The proposed methodology is evaluated and validated through the study of medium scale systems and tutorial systems. The main objective is to demonstrate the impact of the detailed transmission system modeling in the total system operating expected total cost and identify differences in operation strategy.
46

Inserção de Variáveis Ambientais no Planejamento da Operação de Sistemas Hidrotérmicos / Environmental constraints inlcusion on operation planning of a hydrothermal power system

VALLE, Ana Claudia Marques do 11 September 2008 (has links)
Made available in DSpace on 2014-07-29T12:05:39Z (GMT). No. of bitstreams: 1 tese ana.pdf: 3317264 bytes, checksum: 1b832f28771563b1839c5af29d886623 (MD5) Previous issue date: 2008-09-11 / Este trabalho apresenta o desenvolvimento de uma modelagem para inserção de restrição de qualidade de água ao planejamento da operação de sistemas hidrotérmicos de longo prazo. Considerar a qualidade da água no planejamento garante, o enfoque do uso múltiplo da água. O objetivo deste é explorar a sensibilidade do planejamento de sistemas hidrotérmicos à inserção de uma variável ambiental, focando a qualidade da água. Dentre os indicadores de qualidade da água, a escolha foi pela clorofila-a e aporte de fósforo estabelecendo uma relação com o volume do reservatório. / Este trabalho apresenta o desenvolvimento de uma modelagem para inserção de restrição de qualidade de água ao planejamento da operação de sistemas hidrotérmicos de longo prazo. Considerar a qualidade da água no planejamento garante, o enfoque do uso múltiplo da água. O objetivo deste é explorar a sensibilidade do planejamento de sistemas hidrotérmicos à inserção de uma variável ambiental, focando a qualidade da água. Dentre os indicadores de qualidade da água, a escolha foi pela clorofila-a e aporte de fósforo estabelecendo uma relação com o volume do reservatório.
47

Comparação de abordagens MOPSO no planejamento da operação de sistemas hidrotérmicos / Comparing MOPSO approaches for hydrothermal systems operation planning

Silva, Jonathan Cardoso 26 February 2014 (has links)
Submitted by Luciana Ferreira (lucgeral@gmail.com) on 2015-01-27T14:37:37Z No. of bitstreams: 2 license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Dissertação - Jonathan Cardoso Silva - 2014.pdf: 3627934 bytes, checksum: 4b576bd42a95d94493a78b1e54c2d64a (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2015-01-28T12:39:13Z (GMT) No. of bitstreams: 2 license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Dissertação - Jonathan Cardoso Silva - 2014.pdf: 3627934 bytes, checksum: 4b576bd42a95d94493a78b1e54c2d64a (MD5) / Made available in DSpace on 2015-01-28T12:39:13Z (GMT). No. of bitstreams: 2 license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) Dissertação - Jonathan Cardoso Silva - 2014.pdf: 3627934 bytes, checksum: 4b576bd42a95d94493a78b1e54c2d64a (MD5) Previous issue date: 2014-02-26 / Coordenação de Aperfeiçoamento de Pessoal de Nível Superior - CAPES / The operation planning of hydrothermal systems is a complex, dynamic, stochastic, nonlinear and interconnected problem. In this study, we consider that this problem must tackle two objectives simultaneously: minimize thermoelectric generation (by maximizing the use of hydroelectric plants) and maximize water reservoirs’ level of hydroelectric plants. This dissertation presents the application of some multiobjective meta-heuristics, using a set of eight actual plants from Brazilian interconnected system in three periods of medium-term planning. The algorithms used were of two types: those based on particle swarms (MOPSO , MOPSO-TVAC , SMPSO, MOPSO-CDR and MOPSO-DFR) and evolutionary algorithms (SPEA2 and MOEAD/DRA). The results from previous studies, made with single objective techniques, were inserted in the initial population of the algorithms and compared with those simulations with normal initialization. We observed that MOPSO-CDR outperformed the other algorithms in the test scenarios while, in some cases, MOPSO has also generated competitive results. / O problema do planejamento da operação de sistemas hidrotérmicos é complexo, dinâmico, estocástico, interconectado e não linear. Este problema é tratado de modo atender a dois objetivos simultaneamente: maximizar a geração elétrica nas usinas hidrelétricas (ou minimizar o custo com a complementação da geração por termelétricas) e maximizar o nível dos reservatórios de água das hidrelétricas. Este trabalho apresenta a aplicação de algumas meta-heurísticas multiobjetivo a este problema, utilizando um conjunto de oito usinas reais do Sistema Interligado Nacional em três períodos de planejamento de médio prazo. Os algoritmos utilizados foram de dois tipos: os baseadas em enxames de partículas (MOPSO, MOPSO-TVAC,SMPSO, MOPSO-CDR e MOPSO-DFR) e os algoritmos evolucionários (SPEA2 e MOEAD/DRA). Foram realizados testes com a inserção de resultados de estudos anteriores com técnicas de único objetivo na população inicial dos algoritmos e comparados com os testes com inicialização normal. Observou-se que o algoritmo MOPSO-CDR obtém os melhores resultados nos cenários de testes utilizados, competindo em alguns casos com os resultados do MOPSO.
48

Otimização de sistemas hidrotérmicos de geração por meio de meta-heurísticas baseadas em enxame de partículas / Optimization of hydrothermal generating systems by means of particle swarm based meta-heuristics

Deus, Guilherme Resende 02 February 2016 (has links)
Submitted by Cássia Santos (cassia.bcufg@gmail.com) on 2017-07-03T12:59:51Z No. of bitstreams: 2 Dissertação - Guilherme Resende Deus - 2016.pdf: 3406372 bytes, checksum: aaa431a0fa0dd2323a74cf35fb63f892 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Approved for entry into archive by Luciana Ferreira (lucgeral@gmail.com) on 2017-07-10T11:44:22Z (GMT) No. of bitstreams: 2 Dissertação - Guilherme Resende Deus - 2016.pdf: 3406372 bytes, checksum: aaa431a0fa0dd2323a74cf35fb63f892 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) / Made available in DSpace on 2017-07-10T11:44:22Z (GMT). No. of bitstreams: 2 Dissertação - Guilherme Resende Deus - 2016.pdf: 3406372 bytes, checksum: aaa431a0fa0dd2323a74cf35fb63f892 (MD5) license_rdf: 0 bytes, checksum: d41d8cd98f00b204e9800998ecf8427e (MD5) Previous issue date: 2016-02-02 / The objective of this work is to find reasonable solutions to the problem of optimization of hydrothermal generating systems by means of metaheuristics based on particle swarms. The proposed problem is complex, dynamic, nonlinear and presents some stochastic variables. The study consisted of the implementation of particle swarm algorithms, more specifically the variants of the Particle Swarm Optimization (PSO) algorithm: LSSPSO, ABeePSO and KFPSO. The algorithms were run in a mill simulator containing data from eight National Interconnected System mills during the five year period. The results were compared with the studies using the Nonlinear Programming (NLP) algorithm, and it was concluded that although the presented meta-heuristics were able to obtain a Final Storage Energy value equal to NLP, they did not have a generation cost Equivalent to or less than the Nonlinear Programming method. / O trabalho objetiva encontrar soluções razoáveis para o problema de otimização de sistemas hidrotérmicos de geração por meio de meta-heurísiticas baseadas em enxame de partículas. O problema proposto é complexo, dinâmico, não linear e apresenta algumas variáveis estocásticas. O estudo consistiu na implementação de algoritmos baseados em enxame de partículas, mais especificamente das variantes do algoritmo Particle Swarm Optimization (PSO): LSSPSO, ABeePSO e KFPSO. Os algoritmos foram executados em um simulador de usinas que contém dados de oito usinas do Sistema Interligado Nacional durante o período de cinco anos. Os resultados foram comparados com os estudos que utilizam o algoritmo de Programação Não-Linear (PNL), e conclui-se que apesar de as meta-heurísticas apresentadas conseguirem obter um valor de Energia Armazenada Final igual ao PNL, não obtiveram um custo de geração equivalente ou inferior ao método de Programação Não-Linear.
49

Nova metodologia para representação da vazão mínima obrigatória em sistemas equivalentes no planejamento da operação de sistemas hidrotérmicos / New method for representation of mandatory minimum outflow in systems equivalent in the operation planning of hydrothermal systems

Conceição, Wellington Carlos da 02 August 2012 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-05-20T17:31:53Z No. of bitstreams: 1 wellingtoncarlosdaconceicao.pdf: 2412660 bytes, checksum: 31c07135427924fe90166a943adbbdd7 (MD5) / Rejected by Adriana Oliveira (adriana.oliveira@ufjf.edu.br), reason: Renata, somente a primeira letra de cada palavra chave é que deve ser em maiúsculo. Não corrigi esta para só para me lembrar de te falar. on 2016-07-02T11:26:49Z (GMT) / Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-07-04T10:15:18Z No. of bitstreams: 1 wellingtoncarlosdaconceicao.pdf: 2412660 bytes, checksum: 31c07135427924fe90166a943adbbdd7 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-07-13T16:11:09Z (GMT) No. of bitstreams: 1 wellingtoncarlosdaconceicao.pdf: 2412660 bytes, checksum: 31c07135427924fe90166a943adbbdd7 (MD5) / Made available in DSpace on 2016-07-13T16:11:09Z (GMT). No. of bitstreams: 1 wellingtoncarlosdaconceicao.pdf: 2412660 bytes, checksum: 31c07135427924fe90166a943adbbdd7 (MD5) Previous issue date: 2012-08-02 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / O presente trabalho apresenta uma metodologia alternativa para o atendimento da restrição associada à vazão mínima obrigatória no problema de planejamento da operação de médio prazo de sistemas hidrotérmicos interligados. Atualmente, a metodologia oficial adotada no Setor Elétrico Brasileiro consiste na utilização de uma variável de folga associada a esta restrição. Neste trabalho é proposta uma estratégia visando manter os reservatórios operando dentro de níveis seguros associada à utilização de uma variável de folga. Para tanto foi criada uma curva de energia armazenável mínima, que fornece a informação sobre os níveis mínimos de armazenamento dos reservatórios equivalentes, de tal forma que os mesmos sejam capazes de suprir as perdas e a vazão mínima obrigatória. As duas metodologias são comparadas e os resultados das simulações mostraram que a formulação proposta leva a uma diminuição no valor esperado de déficit de vazão mínima obrigatória. / This work presents an alternative methodology to meet the constraint associated with mandatory minimum outflow in the problem of long-term operation planning of hydrothermal interconnected systems. Currently, the official methodology adopted in the Brazilian Electric Sector is the use of a slack variable associated with this restriction. This work proposes a strategy to keep the reservoirs operating within safe levels associated with use of a slack variable. For this, is constructed a storable energy curve minimum, providing information about the minimum levels of storage reservoirs equivalent, so that the reservoirs are able to supply the losses and the mandatory minimum outflow. The two methodologies are compared and the simulation results showed that the proposed formulation leads to a decrease in the expected value of deficit minimum flow.
50

Métodos de análise da função de custo futuro em problemas convexos: aplicação nas metodologias de programação dinâmica estocástica e dual estocástica

Brandi, Rafael Bruno da Silva 29 February 2016 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-07-28T12:04:17Z No. of bitstreams: 1 rafaelbrunodasilvabrandi.pdf: 13228407 bytes, checksum: 1e92e8c2fa686ddcaea1c9ed0d33b278 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2016-07-28T12:16:14Z (GMT) No. of bitstreams: 1 rafaelbrunodasilvabrandi.pdf: 13228407 bytes, checksum: 1e92e8c2fa686ddcaea1c9ed0d33b278 (MD5) / Made available in DSpace on 2016-07-28T12:16:14Z (GMT). No. of bitstreams: 1 rafaelbrunodasilvabrandi.pdf: 13228407 bytes, checksum: 1e92e8c2fa686ddcaea1c9ed0d33b278 (MD5) Previous issue date: 2016-02-29 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / CNPq - Conselho Nacional de Desenvolvimento Científico e Tecnológico / O Sistema Elétrico Brasileiro (SEB) apresenta características peculiares devido às grandes dimensões do país e pelo fato da geração elétrica ser proveniente predominantemente de usinas hidráulicas. Como as afluências a estas usinas possuem comportamento estocástico e grandes reservatórios proporcionam ao sistema a capacidade de uma regularização plurianual, a utilização dos recursos hidráulicos deve ser planejada de forma minuciosa em um horizonte de tamanho considerável. Assim, o planejamento da operação de médio prazo compreende um período de 5 a 10 anos com discretização mensal e é realizado por uma cadeia de modelos computacionais tal que o principal modelo desta cadeia é baseado na técnica da Programação Dinâmica Dual Estocástica (PDDE). O objetivo deste trabalho é obter avanços nas metodologias de programação dinâmica atualmente utilizadas. Partindo-se da utilização da inserção iterativa de cortes, implementa-se um modelo computacional para o planejamento da operação de médio prazo baseado na metodologia de Programação Dinâmica Estocástica (PDE) utilizando uma discretização mais eficiente do espaço de estados (PDEE). Além disso, a metodologia proposta de PDE possui um critério de convergência bem definido para o problema, de forma que a inclusão da medida de risco CVaR não altera o processo de avaliação da convergência de forma significante. Dado que a inclusão desta medida de risco à PDDE convencional dificulta a avaliação da convergência do processo pela dificuldade da estimação de um limite superior válido, o critério de convergência proposto na PDEE é, então, base para um novo critério de convergência para a PDDE tal que pode ser aplicado mesmo na consideração do CVaR e não aumenta o custo computacional envolvido. Adicionalmente, obtém-se um critério de convergência mais detalhado em que as séries utilizadas para amostras de afluência podem ser avaliadas individualmente tais que aquelas que, em certo momento, não contribuam de forma determinante para a convergência podem ser descartadas do processo, diminuindo o tempo computacional, ou ainda serem substituídas por novas séries dentro de uma reamostragem mais seletiva dos cenários utilizados na PDDE. As metodologias propostas foram aplicadas para o cálculo do planejamento de médio prazo do SIN baseando-se em subsistemas equivalentes de energia. Observa-se uma melhoria no algoritmo base utilizado para a PDE e que o critério proposto para convergência da PDDE possui validade mesmo quando CVaR é considerado na modelagem. / The Brazilian National Grid (BNG) presents peculiar characteristics due to its huge territory dimensions and hydro-generation predominancy. As the water inflows to these plants are stochastic and a pluriannual regularization for system storage capacity is provided, the use of hydro-generation must be planned in an accurate manner such that it considersalongplanningperiod. So, thelong-termoperationplanning(LTOP)problemis generallysolvedbyachainofcomputationalmodelsthatconsideraperiodof5to10years ahead such that the primary model of this chain is based on Stochastic Dual Dynamic Programming (SDDP) technique. The main contribution of this thesis is to propose some improvements in Stochastic Dynamic Programming techniques usually settled on solving LTOP problems. In the fashion of an iterative cut selection, it is firstly proposed a LTOP problem solution model that uses an ecient state space discretization for Stochastic Dynamic Programming (SDP), called ESDP. The proposed model of SDP has a welldefined convergence criterion such that including CVaR does not hinder convergence analysis. Due to the lack of good upper bound estimators in SDDP when including CVaR, additional issues are encountered on defining a convergence criterion. So, based on ESDP convergence analysis, a new criterion for SDDP convergence is proposed such that it can be used regardless of CVaR representation with no extra computational burden. Moreover, the proposed convergence criterion for SDDP has a more detailed description such that forward paths can be individually assessed and then be accordingly discarded for computational time reduction, or even define paths to be replaced in a more particular resampling scheme in SDDP. Based on aggregate reservoir representation, the proposed methodsofconvergenceofSDDPandtheESDPwereappliedonLTOPproblemsrelatedto BNG. Results show improvements in SDDP based technique and eectiveness of proposed convergence criterion for SDDP when CVaR is used.

Page generated in 0.1207 seconds