• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 54
  • Tagged with
  • 54
  • 54
  • 50
  • 49
  • 39
  • 37
  • 28
  • 24
  • 23
  • 23
  • 19
  • 19
  • 18
  • 17
  • 17
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
51

Metodologia para o rateio do bloco hidráulico no planejamento hidrotérmico de médio prazo

Ferreira, Marcus Augustus Alves 27 August 2010 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2016-09-22T13:28:04Z No. of bitstreams: 1 marcusaugustusalvesferreira.pdf: 1083212 bytes, checksum: e0eca7cabdbe43d54d54c8e20f191594 (MD5) / Approved for entry into archive by Diamantino Mayra (mayra.diamantino@ufjf.edu.br) on 2016-09-26T20:28:52Z (GMT) No. of bitstreams: 1 marcusaugustusalvesferreira.pdf: 1083212 bytes, checksum: e0eca7cabdbe43d54d54c8e20f191594 (MD5) / Made available in DSpace on 2016-09-26T20:28:52Z (GMT). No. of bitstreams: 1 marcusaugustusalvesferreira.pdf: 1083212 bytes, checksum: e0eca7cabdbe43d54d54c8e20f191594 (MD5) Previous issue date: 2010-08-27 / A eficiência na operação de sistemas predominante hidrotérmicos, como o Sistema Interligado Nacional brasileiro (SIN), é estreitamente relacionada à execução de um planejamento da operação consistente. Os modelos de decisão estratégica usados em estudos de médio prazo são capazes de determinar a política operativa que minimiza os custos de operação e o risco de déficit usando uma modelagem a sistemas equivalentes de energia. Este trabalho trata de uma proposta para ser acoplada, pela função de custo futuro esperado da operação, a um modelo de decisão estratégica, de modo a permitir a desagregação dos subsistemas nos seus reservatórios individuais, para cada mês e seqüência hidrológica. Assim, a proposta é desenvolver um modelo que seja capaz de verificar se as metas globais da geração dos subsistemas, fornecidas pelos os modelos de decisão estratégica, são alcançáveis. Para tanto, a ferramenta desagrega a solução encontrada para os sistemas de equivalentes de energia na operação a usinas individualizadas. A metodologia possui dois módulos: no primeiro é realizado o despacho dos sistemas equivalentes de energia uma rotina iterativa de programação linear e achadas as metas globais de geração para cada um deles, considerando as funções de custo futuro esperado da operação e o intercâmbio da energia entre subsistemas. O segundo módulo é um otimizador não-linear do despacho mensal das usinas hidrelétricas de cada subsistema isoladamente, que tenta alcançar as metas de geração do módulo anterior, maximizando o volume armazenado dos reservatórios. A inovação deste modelo está no módulo de simulação a usinas individualizadas, que não é baseado em regras heurísticas, mas em uma rotina de programação não-linear (PNL). O uso de técnicas de otimização diminui a interferência do usuário no processo de simulação, uma vez que seu conhecimento é baseado na experiência adquirida ao longo do histórico da operação. Além disso, a proposta dispensa a adaptações quando novas políticas operativas forem adotadas. Assim, este modelo, quando estiver completo e validado, poderá despontar como uma alternativa ao modelo de simulação oficial utilizado pelo Setor Elétrico Brasileiro (SEB), cujo módulo de simulação a usinas individualizadas é baseado em uma política de operação paralela dos reservatórios. / The efficiency in the operation of predominantly hydrothermal systems, as the Brazilian Interconnected System (SIN), is closely related to the execution of a consistent operation planning. The strategical decision models used in long term studies are capable to determine the operative politics that minimizes the operation costs and the risks of deficit by using an energy equivalent reservoirs modeling. This work deals with a proposal that may be coupled to a strategical decision model by the expected cost to go function, in order to allow the disaggregation of the subsystems’ into its the individual reservoirs, for every month and for each streamflow sequence. So, the proposal is the development of a model where it is possible to verify if the subsystems’ generation global goals, supplied for the strategical decision models, are reachable. To work in such way, the tool disaggregates the solution found for the energy equivalent systems to the individualized plants. The methodology has two modules: in the first one the optimal dispatch of the energy equivalent subsystems is done with an iterative linear programming routine and the global generation goals for each one of the subsystems are found, considering the energy interchange between them. The second module, is an individualized plants nonlinear optimizer modeled for dispatching the hydroelectric plants of each subsystem separately, in order to try to reach the generation goals defined by the previous module and to maximize the reservoirs’ levels. The innovation of this model is the individualized plants simulation module, which is not based on heuristic rules, but in a nonlinear programming routine (NLP). The use of optimization techniques diminish the interference of the user in the simulation process, since his knowledge is usually based on the experience acquired throughout the operation history. Moreover, the methodology dismisses the adaptation of the model whenever new operative politics are adopted. Thus, this model, after the validation process, may dawn as an alternative to the simulation model that is officially used by the Brazilian Electrical Sector (SEB), whose individualized plants simulation module is based on the politics of the parallel operation of the reservoirs.
52

Programação dinâmica estocástica com discretização do intercâmbio de energia entre subsistemas hidrotérmicos no problema de planejamento da operação

Conceição, Wellington Carlos da 12 December 2016 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2017-03-20T13:40:45Z No. of bitstreams: 1 wellingtoncarlosdaconceicao.pdf: 4259949 bytes, checksum: 52410bbb422df8d4e80e7f6956efc71e (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2017-03-21T13:12:55Z (GMT) No. of bitstreams: 1 wellingtoncarlosdaconceicao.pdf: 4259949 bytes, checksum: 52410bbb422df8d4e80e7f6956efc71e (MD5) / Made available in DSpace on 2017-03-21T13:12:55Z (GMT). No. of bitstreams: 1 wellingtoncarlosdaconceicao.pdf: 4259949 bytes, checksum: 52410bbb422df8d4e80e7f6956efc71e (MD5) Previous issue date: 2016-12-12 / O sistema de produção de energia elétrica brasileiro é um sistema hidrotérmico de grande porte com forte predominância de usinas hidrelétricas. O planejamento e operação do sistema é realizado considerando diversos fatores, tais como, estocasticidade das afluências, usinas hidrelétricas em cascata e acoplamento temporal da operação. A resolução deste tipodeproblemaéfeitaconsiderandodiversoshorizontesdeplanejamento. Oplanejamento da operação de médio prazo compreende um período de 5 anos de estudo, e este período é discretizado em base mensal. O presente trabalho apresenta uma metodologia alternativa para resolução do problema de planejamento da operação de médio prazo de sistemas hidrotérmicos utilizando a Programação Dinâmica Estocástica (PDE) com discretização dointercâmbiodeenergiaentreossubsistemas(PDE-INT).Alémdisso, utiliza-seatécnica de sistemas equivalentes de energia e o algoritmo de fechos convexos (convex hull) para obtenção da função de custo futuro a partir dos pontos obtidos pela PDE-INT. Nesta abordagem, para cálculo da política energética, os subsistemas são considerados isolados, e desta forma, as variáveis que compõem o espaço de estados que são discretizadas são a energia armazenada e o intercâmbio líquido entre os subsistemas. Inicialmente, para análise e avaliação da metodologia proposta na resolução do problema de planejamento hidrotérmico, criou-se um sistema tutorial, composto por dois subsistemas. Em seguida, a metodologia foi utilizada considerando todo o sistema elétrico brasileiro, representado por quatro subsistemas ou submercados. Os resultados mostraram que com a técnica de separação dos subsistemas há uma redução significativa no tempo computacional quando comparados com as técnicas tradicionais que utilizam programação dinâmica. Desta forma, a metodologia proposta pode ser utilizada para uma análise rápida e inicial do caso em estudo, servindo como base para estudos e refinamentos posteriores. / The Brazilian power production system is a large scale hydrothermal system with a strong predominance of hydroelectric power plants. The electric power system operation planning must take into consideration several factors, such as uncertainty of the water inflows, hydroelectric plants in cascade and temporal coupling. This problem is solved considering different planning horizon. The long-term operation planning problem is generally solved by a chain of computational models that consider a period of 5 years ahead with monthly discretization. This work presents an alternative strategy to solve hydrothermalsystemsoperationplanningbyStochasticDynamicProgramming(SDP)with discretization of energy interchange between subsystems (SDP-INT). Under the presented approach, the hydroelectric plants are grouped into energy equivalent subsystems and the expected operation cost functions are modeled by a piecewise linear approximation, by means of the convex hull algorithm. Also, under this methodology, the subsystems are solved isolated, but the net energy interchange (export – import) between subsystems is set as a state variable of the cost function, together with the energy storage Initially, for the analysis and evaluation of the proposed methodology applied on solving the hydrothermalplanningproblem, themethodologyisusedinatutorialsystem, composedof two subsystems. Next, a simulation with the whole Brazilian electrical system considering four subsystems is presented. The results have shown that this subsystems separation technique reduces significantly the computation time when compared with the traditional techniques, demonstrating the effectiveness of the proposed methodology. Thus, the proposed methodology can be used for a fast and initial analysis of the case study, serving as a basis for further studies.
53

Representação de cenários de demanda e da função de produção hidrelétrica no planejamento da operação de sistemas hidrotérmicos a médio prazo

Fernandes, Alexandre da Silva 20 February 2018 (has links)
Submitted by Geandra Rodrigues (geandrar@gmail.com) on 2018-05-10T12:15:28Z No. of bitstreams: 1 alexandredasilvafernandes.pdf: 3326554 bytes, checksum: f4dfcfe70bde99c5ebe4501f03add83e (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2018-05-22T15:33:53Z (GMT) No. of bitstreams: 1 alexandredasilvafernandes.pdf: 3326554 bytes, checksum: f4dfcfe70bde99c5ebe4501f03add83e (MD5) / Made available in DSpace on 2018-05-22T15:33:53Z (GMT). No. of bitstreams: 1 alexandredasilvafernandes.pdf: 3326554 bytes, checksum: f4dfcfe70bde99c5ebe4501f03add83e (MD5) Previous issue date: 2018-02-20 / O planejamento da operação do Sistema Interligado Nacional constitui-se uma tarefa de alta complexidade, seja pela quantidade acentuada de usinas hidrelétricas e termelétricas distribuídas nos quatro submercados interligados, ou pelas características marcantes da operação das hidrelétricas, no que diz respeito às incertezas dos cenários hidrológicos futuros e aos acoplamentos espacial e temporal. O objetivo deste planejamento é a determinação de uma política ótima de despacho das usinas do sistema de modo a minimizar o valor esperado dos custos operativos no horizonte considerado. Uma importante restrição do problema é o suprimento da demanda de energia elétrica, dado pela diferença entre a carga efetiva de cada submercado e a geração das usinas não simuladas, esta última composta pela energias alternativas (eólica, solar, biomassa), pequenas centrais hidrelétricas, entre outros. Entretanto, a crescente penetração da geração renovável, aliada às incertezas das fontes naturais como eólica e solar (pois dependem de fatores climáticos e por isso são imprevisíveis), contribui com a necessidade de representação da demanda em diversos cenários para um correto despacho das usinas e uma operação do sistema mais confiável. Sabendo que os modelos oficiais atuais tratam apenas as incertezas oriundas dos cenários hidrológicos, devido à dificuldade de implementação e alocação de memória na consideração de outras incertezas na Programação Dinâmica Dual Estocástica, o trabalho desenvolvido nesta dissertação propõe metodologias que incluem os diversos cenários de demanda, além de representar com maior detalhe a geração das hidrelétricas. Além disso, são propostos algoritmos de representação analítica da Função de Custo Imediato em sistemas isolados e com múltiplas áreas na busca por uma redução das dimensões do problema tratado. Finalmente, são realizados testes em sistemas tutorias e os resultados são analisados para avaliar as performances computacionais das metodologias propostas. / The operation schedulling of Brazilian System constitutes a task of high complexity, either due to the large number of hydro and thermal plants distributed in the four interconnected submarkets, or due to the outstanding characteristics of the hydro plants, with respect to the uncertainties in the hydrological scenarios future and due to spatial and temporal couplings. The objective of this planning is the determination of an optimal dispatch policy of plants that minimizes the expected value of the operating costs in the considered horizon. An important constraint is the supply of demand, which is obtained by the difference between the effective load of each submarket and the generation of non-simulated plants, composed of renewable energies (wind, solar, biomass), small hydropower plants, and others. However, the growing penetration of renewable generation, coupled with the uncertainties of natural sources such as wind and solar (because they depend on climatic factors and are therefore unpredictable), contributes to the need to represent demand in different scenarios for a correct dispatch of the plants and a more reliable system operation. Knowing that the current official models deal only with the uncertainties arising from the hydrological scenarios, due to the difficulty of implementation and memory allocation in the consideration of other uncertainties in Stochastic Dual Dynamic Programming, this work proposes methodologies that include the several scenarios demand, besides representing in greater detail the generation of hydroelectric plants. In addition, algorithms are proposed for analytical representation of the Immediate Cost Function in isolated systems with multiple areas in the search for a reduction of the dimensions of the problem. Finally, tests are performed on tutorial systems and the results are analyzed to evaluate the computational performances of the proposed methodologies.
54

Modelagem híbrida para o planejamento da operação de sistemas hidrotérmicos considerando as não linearidades das usinas hidráulicas

Ramos, Tales Pulinho 23 February 2015 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2015-12-16T11:02:24Z No. of bitstreams: 1 talespulinhoramos.pdf: 6134665 bytes, checksum: 349537ae72f568271488022944942fb6 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2015-12-16T11:20:33Z (GMT) No. of bitstreams: 1 talespulinhoramos.pdf: 6134665 bytes, checksum: 349537ae72f568271488022944942fb6 (MD5) / Made available in DSpace on 2015-12-16T11:20:33Z (GMT). No. of bitstreams: 1 talespulinhoramos.pdf: 6134665 bytes, checksum: 349537ae72f568271488022944942fb6 (MD5) Previous issue date: 2015-02-23 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / O Sistema Interligado Nacional (SIN) apresenta cerca de 150 usinas hidráulicas e o planejamento de médio prazo contempla entre 5 e 10 anos de estudo, a representação do sistema à usinas individualizadas faz com que a resolução do problema seja muito custoso computacionalmente. Para isso, o sistema é representado a partir de sistemas equivalentes de energia. Existe um trabalho anterior onde foi realizado a flexibilização da modelagem do sistema, denominada modelagem híbrida, em que parte do sistema é representado através de sistemas equivalentes de energia e outra é representada à usinas individualizadas com a produtibilidade constante. Desta forma, consegue-se um maior detalhamento nos estudos de médio prazo mantendo a complexidade do sistema em um nível adequado computacionalmente. Este trabalho apresenta a modelagem híbrida entre sistemas equivalentes de energia e à usinas individualizadas, porém, considerando as não linearidades das usinas hidráulicas. As não linearidades das usinas basicamente se dão em relação a variação do nível do reservatório e da vazão defluente (vazão turbinada acrescida da vazão vertida), o que implica diretamente na geração hidráulica. A proposta consiste em modelar a geração hidráulica das usinas (Função de Produção Hidráulica - FPH), que é uma função analítica não linear e não convexa, por uma função linear por partes convexa que represente adequadamente a função de produção hidráulica analítica. Há um trabalho anterior onde a FPH é aproximada por uma função linear por partes em duas etapas, inicialmente a função é aproximada nas dimensões do armazenamento e do turbinamento e, em uma segunda etapa, é adicionado a contribuição do vertimento. Já neste trabalho, a FPH é aproximada por uma função linear por partes obtida em apenas uma etapa para as três dimensões a partir do algoritmo Convex Hull. Assim, é possível resolver o problema de médio prazo considerando parte do sistema representado de forma equivalente e outra parte de forma individualizada considerando a variação da geração hidráulica em função do volume armazenado, vazão turbinada e vertida (se houver influência no canal de fuga). / The National Interconnected Power System (NIPS) presents around 150 hydraulic plants and the medium term planning contemplates between 5 to 10 years of study, the representation of the system to individualized plants makes the problem impracticable in computing; then the system is represented from equivalent systems of energy. There is an alternative of modeling flexibility of the system named hybrid modeling, in which part of the system is represented through equivalent systems of energy and the other is represented to individualized plants with constant productivity. As a consequence, it is obtained greater detail in the long term studies, maintaining the complexity of the system in an adequate level in computing. This paper presents the hybrid modeling between equivalent systems of energy and individualized plants. However, it considers non-linearities on generation of hydraulic plants. The non-linear characteristic on generation function basically comes from the influence of the reservoir level (head term) and the release term (turbinated outflow added to spilled outflow). The suggestion is to model the hydraulic generation of the plants (Hydraulic Production Function - HPF), which is a non-linear and non-convex analytical function, into a convex piecewise linear function that represents appropriately the function of the analytical hydraulic production. It will be described in detail in this paper the technique used to obtain this piecewise linear function by applying the Convex Hull algorithm to guarantee the convexity of this function. To conclude, it is possible to solve the problem of long term considering part of the system represented by equivalent form and the other part in individualized manner considering the variation of the hydraulic generation in relation to the volume stored, turbaned and spilled outflow.

Page generated in 0.0704 seconds