• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 54
  • Tagged with
  • 54
  • 54
  • 50
  • 49
  • 39
  • 37
  • 28
  • 24
  • 23
  • 23
  • 19
  • 19
  • 18
  • 17
  • 17
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Avaliação da operação otimizada de usinas hidrelétricas / Evaluation of the optimized operation of hydroelectric power plants

Silva, Renato Mendes da 12 December 2003 (has links)
Através da análise de estudos de otimização e simulação, considerando a operação energética das usinas existentes na cascata do rio Paranapanema, situada na região sudoeste do estado de São Paulo, mostrou-se que a operação do sistema, baseada em regras de operação obtidas através da otimização da cascata, resulta em ganhos significativos de geração e de energia armazenada, proporcionando, desse modo, uma melhor utilização de recursos hidrológicos, bem como uma condição final de armazenamento mais favorável, implicando uma operação mais eficiente e confiável de todo o sistema. / Through the analysis of optimization and simulation studies regarding the energy operation of the existing plants in the Paranapanema river, situated in the southwestern region of the state of São Paulo, Brazil, it was shown that the system operation, based on operation rules achieved considering the cascate optimization, yields significant gains of generation and stored energy in the system, therefore providing a better use of the available hydrologic resources, as well as a more favorable final storage level for each plant, which implies in a more efficient and reliable operation of the whole set.
2

Simulação da operação de sistemas hidroelétricos de potência a usinas individualizadas com regras otimizadas / not available

Kadowaki, Makoto 04 August 1995 (has links)
As regras de operação adotadas para cada reservatório de um sistema hidroelétrico composto por várias usinas em cascata podem alterar de forma significativa a quantidade total de energia produzida. A regra de operação de reservatórios (ROR) mais adotada atualmente é a da operação em paralelo, segundo a qual os reservatórios mantêm o mesmo percentual em volume de armazenamento. Esta regra é reconhecidamente inconveniente, não refletindo a realidade operativa das usinas. No sistema brasileiro adota-se também a regra de operação em paralelo por faixas, onde agora os reservatórios são divididos em faixas e dentro destas opera-se em paralelo. Este método gera o problema de se determinar faixas convenientes para as usinas, de acordo com suas posições na cascata, o que ainda não foi feito de forma eficiente. A determinação das ROR para usinas hidroelétricas em cascata tem uma grande importância para o planejamento da operação energética de sistemas hidrotérmicos de potência. Ela é necessária no procedimento de agregação para obtenção do reservatório equivalente de energia assim como para estabelecer políticas de defluência utilizadas nos modelos de simulação, tendo um papel importante na metodologia de operação do Sistema Brasileiro. Neste trabalho, faz-se uma análise do comportamento ótimo dos reservatórios em cascata através de um modelo determinístico de otimização não-linear a usinas individualizadas. A seguir propõe-se um método para a obtenção de regras de operação otimizadas de reservatórios que estabelece uma relação entre o estado individual de armazenamento dos reservatórios e o estado agregado de armazenagem do sistema. Estas regras são representadas por curvas ou equações que procuram refletir, em média, as condições de operação ótima do sistema, reproduzindo desta forma uma operação mais próxima da real. Finalmente, faz-se uma comparação das ROR\'s assim obtidas e a regra de operação em paralelo, através da simulação da operação de um subsistema do Sistema Sudeste Brasileiro, e também pela montagem de reservatórios equivalentes de energia com as duas regras, mostrando-se em ambos os casos a melhor adequação das novas regras. / The operation rules adopted for each reservoir of a hydroelectric system, compound by several power plants in cascade, can modify, in a significant way, the total quantity of produced energy. The parallel operation is nowadays the most used reservoir operation rule (ROR). By this all the reservoirs maintain the same percentage of the total volume. This is a recognized improper rule that does not represent the operation reality of the power plants. The determination of the ROR\'s for cascade hydroelectric power plants is of great importance for the energetic operation planning of the hydroelectric power systems. The ROR\'s are necessary in the aggregation process for obtaining the composite representation of a multireservoir hydroelectric system ad also to give the flow down decision in the simulation models. Therefore, these rules are very important in the Brazilian System operation methodology. In this work the optimal behavior of cascade reservoirs is analyzed through a deterministic non-linear optimization model with individual representation of the power plant. Then, a method for this acquisition of optimized ROR\'s is proposed. In these rules a relationship between the reservoirs\' storage individual state and the system storage aggregate state is found. These rules are represented by curves or equations that aim to reflect, in average, the conditions of the system optimal operation, in this way representing an operation closer to reality. Finally, using a subsystem of the Brazilian Southeast System, a comparison of the obtained ROR\'s and parallel rule is made. Also, a composite representation is made with the two rules. In both cases the better behavior of the new rules is demonstrated.
3

Algoritmo de sistema de formigas aplicado ao planejamento da operação de sistemas hidrotérmicos de potência

Antunes, Fábio January 2011 (has links)
Orientadora: Patrícia Teixeira Leite Asano. Co-Orientadora: Karla Vittori. / Dissertação (mestrado) - Universidade Federal do ABC. Programa de Pós-graduação em Energia.
4

Metodologia de previsão do potencial eólico de curto prazo para planejamento da operação de sistemas elétricos

Ferreira, Adir Alexandre Bibiano 06 August 2012 (has links)
Submitted by Sandro Camargo (sandro.camargo@unipampa.edu.br) on 2015-05-09T19:22:56Z No. of bitstreams: 1 107110003.pdf: 5399700 bytes, checksum: 078f09d78c88ad07051ceb62107845c6 (MD5) / Made available in DSpace on 2015-05-09T19:22:56Z (GMT). No. of bitstreams: 1 107110003.pdf: 5399700 bytes, checksum: 078f09d78c88ad07051ceb62107845c6 (MD5) Previous issue date: 2012-08-06 / A dependência da energia elétrica exige a procura de formas alternativas para produção sustentável, como os parques eólicos. Conforme o Plano Decenal de Expansão de Energia (PDE), a geração proveniente de fontes de energia alternativas e sustentáveis como a de usinas eólicas deverá aumentar de 1% para 7%. Logo, a implantação de parques eólicos começará a afetar o planejamento e programação da operação energética, principalmente nos subsistemas sul e nordeste. No entanto, apesar do vento ser um recurso praticamente inesgotável, o problema reside na inconstância, não permitindo contar com a geração de energia elétrica que pode variar significativamente mesmo em um intervalo pequeno de tempo, o operador do sistema tem que estar preparado para atuar no despacho das demais usinas. Neste contexto, uma estimativa de curto prazo é fundamental. Essa operação não pode se basear nos mapas eólicos cujos valores de velocidade são uma média anual, no máximo de estações do ano, além de se limitarem a uma ou duas alturas o que não favorece dados confiáveis para a geração. A dificuldade em obter uma estimativa mais concreta sobre a energia disponível reside na falta de medições correlacionadas de variáveis climáticas, geração e um modelo eficiente de previsão de curto prazo, sendo um dos fatores que impede uma maior penetração deste tipo de fonte na matriz energética brasileira. Este trabalho apresenta uma metodologia para avaliar dados meteorológicos e geográficos que afere o campo de vento na altura do eixo de turbinas eólicas a fim de estimar o fluxo de ar, possibilitando calcular o potencial elétrico instantâneo produzido. Essa estimativa pode ser estendida para vários locais, a fim de acompanhar a variação de vento ocasionada pelos efeitos climáticos. O modelo meteorológico CALMET e WRF permite simular o campo de vento, criando um modelo de previsão probabilístico do vento, estimando a energia elétrica a ser produzida em determinados horários de acordo com o modelo das turbinas. O software ANAREDE analisa o comportamento da energia gerada que influenciara no fluxo de potência do sistema. Com este resultado o Operador Nacional do Sistema Elétrico (ONS) pode executar a coordenação mais precisa do despacho hidrotérmico de curto prazo, bem como o dimensionamento da reserva de potência operativa. / The dependence of the electrical energy demands the search for alternative ways to produce sustainable, such as wind farms. As stated in the Brazil’s Ten Year Plan for Expansion of Energy (PDE), the generation from alternative and sustainable energy sources such as the wind farms is expected to increase from 1% to 7%. Therefore, the deployment of wind farms begins to affect the planning and scheduling of energy operation, mainly in south and northeast Brazilian subsystems. However, despite the wind being a virtually inexhaustible resource, the problem is the inconsistency, not allowing rely on the generation of electrical energy that can vary significantly even in a small interval of time, the system operator must be prepared to act in order of other growers. This operation cannot be based on maps whose wind speed values are the average annual maximum of seasons, and are limited to one or two heights. This paper presents a methodology for assessing meteorological and geographical data to measure the wind field in the turbine hub height, allowing to calculate the instantaneous electric power produced. This estimate can be extended to various points and times of day in order to monitor the variation of wind caused by climatic effects. The CALMET meteorological model WRF and allows to simulate the wind field, creating a probabilistic model for predicting the wind, estimating the electricity to be produced at certain times according to the model of the turbines. ANAREDE The software analyzes the behavior of the energy generated that influenced the flow of power system. With this result the System Operator can perform a more precise coordination of the hydrothermal short term dispatch, as well as the operative power reserve dimensioning. / Wind Forecast / Operation Planning / Wind Generation
5

Metodologia para classificação e tratamento de eventos especiais / Methodology for classification and treatment of special events

Veiga, Francisco Diuner 21 August 2015 (has links)
The electric utilities seek alternatives to permanently improve the contents of continuity of electricity, employing efforts for increasingly sophisticated alternatives and applying new methodologies in this area. The need for improved delivery systems reflects an increase in the reliability of these systems, allowing greater comfort for the consumers and also enabling the expansion of commercial and industrial activity since interruptions compromise their production. In this sense the electric utilities have sought to invest increasingly in electrical studies planning of the operation, seeking to meet a seasonally market clients that need for a certain period, a high quality score and reliability of the utility systems. At this market demand call special events, ie, are situations that require the full attention of the concessionaire, because in the event of interruption of electricity supply may reflect in huge losses to customers and the company's image. However, this study aims to identify which events will be treated as special and estimate levels of priority, thus enabling through treatment and classification methodology, plan the operation during these events, adopting operational actions that can come from meeting the expectations of customers ensuring the quality and reliability of electricity supply. / As concessionárias de energia elétrica buscam permanentemente alternativas para melhorar os índices de continuidade de energia elétrica, empregando esforços em alternativas cada vez mais sofisticadas e aplicando novas metodologias nesta área. A necessidade de melhoria dos sistemas de distribuição reflete um aumento da confiabilidade destes sistemas, permitindo um maior conforto para os consumidores e também possibilitando a expansão das atividades comerciais e industriais, uma vez que as interrupções comprometem sua produção. Nesse sentido, as concessionárias de energia elétrica têm buscado investir cada vez mais nos estudos elétricos de planejamento da operação, buscando atender um mercado sazonal de clientes que necessitam por um determinado período, um elevado índice de qualidade e confiabilidade dos sistemas da concessionária. A esta demanda de mercado chamamos de eventos especiais, ou seja, são situações que necessitam da máxima atenção da concessionária, pois na ocorrência da interrupção do fornecimento de energia elétrica, pode refletir em prejuízos enormes a seus clientes e na imagem da empresa. Contudo este trabalho tem por objetivo identificar quais os eventos serão tratados como especiais e estimar níveis de prioridades, possibilitando-se assim, através da metodologia de tratamento e classificação, planejar a operação durante estes eventos, adotando ações operativas que possam vir de encontro as expectativa dos clientes, garantindo a qualidade e a confiabilidade do fornecimento de energia elétrica.
6

Simulação da operação de sistemas hidroelétricos de potência a usinas individualizadas com regras otimizadas / not available

Makoto Kadowaki 04 August 1995 (has links)
As regras de operação adotadas para cada reservatório de um sistema hidroelétrico composto por várias usinas em cascata podem alterar de forma significativa a quantidade total de energia produzida. A regra de operação de reservatórios (ROR) mais adotada atualmente é a da operação em paralelo, segundo a qual os reservatórios mantêm o mesmo percentual em volume de armazenamento. Esta regra é reconhecidamente inconveniente, não refletindo a realidade operativa das usinas. No sistema brasileiro adota-se também a regra de operação em paralelo por faixas, onde agora os reservatórios são divididos em faixas e dentro destas opera-se em paralelo. Este método gera o problema de se determinar faixas convenientes para as usinas, de acordo com suas posições na cascata, o que ainda não foi feito de forma eficiente. A determinação das ROR para usinas hidroelétricas em cascata tem uma grande importância para o planejamento da operação energética de sistemas hidrotérmicos de potência. Ela é necessária no procedimento de agregação para obtenção do reservatório equivalente de energia assim como para estabelecer políticas de defluência utilizadas nos modelos de simulação, tendo um papel importante na metodologia de operação do Sistema Brasileiro. Neste trabalho, faz-se uma análise do comportamento ótimo dos reservatórios em cascata através de um modelo determinístico de otimização não-linear a usinas individualizadas. A seguir propõe-se um método para a obtenção de regras de operação otimizadas de reservatórios que estabelece uma relação entre o estado individual de armazenamento dos reservatórios e o estado agregado de armazenagem do sistema. Estas regras são representadas por curvas ou equações que procuram refletir, em média, as condições de operação ótima do sistema, reproduzindo desta forma uma operação mais próxima da real. Finalmente, faz-se uma comparação das ROR\'s assim obtidas e a regra de operação em paralelo, através da simulação da operação de um subsistema do Sistema Sudeste Brasileiro, e também pela montagem de reservatórios equivalentes de energia com as duas regras, mostrando-se em ambos os casos a melhor adequação das novas regras. / The operation rules adopted for each reservoir of a hydroelectric system, compound by several power plants in cascade, can modify, in a significant way, the total quantity of produced energy. The parallel operation is nowadays the most used reservoir operation rule (ROR). By this all the reservoirs maintain the same percentage of the total volume. This is a recognized improper rule that does not represent the operation reality of the power plants. The determination of the ROR\'s for cascade hydroelectric power plants is of great importance for the energetic operation planning of the hydroelectric power systems. The ROR\'s are necessary in the aggregation process for obtaining the composite representation of a multireservoir hydroelectric system ad also to give the flow down decision in the simulation models. Therefore, these rules are very important in the Brazilian System operation methodology. In this work the optimal behavior of cascade reservoirs is analyzed through a deterministic non-linear optimization model with individual representation of the power plant. Then, a method for this acquisition of optimized ROR\'s is proposed. In these rules a relationship between the reservoirs\' storage individual state and the system storage aggregate state is found. These rules are represented by curves or equations that aim to reflect, in average, the conditions of the system optimal operation, in this way representing an operation closer to reality. Finally, using a subsystem of the Brazilian Southeast System, a comparison of the obtained ROR\'s and parallel rule is made. Also, a composite representation is made with the two rules. In both cases the better behavior of the new rules is demonstrated.
7

Avaliação da operação otimizada de usinas hidrelétricas / Evaluation of the optimized operation of hydroelectric power plants

Renato Mendes da Silva 12 December 2003 (has links)
Através da análise de estudos de otimização e simulação, considerando a operação energética das usinas existentes na cascata do rio Paranapanema, situada na região sudoeste do estado de São Paulo, mostrou-se que a operação do sistema, baseada em regras de operação obtidas através da otimização da cascata, resulta em ganhos significativos de geração e de energia armazenada, proporcionando, desse modo, uma melhor utilização de recursos hidrológicos, bem como uma condição final de armazenamento mais favorável, implicando uma operação mais eficiente e confiável de todo o sistema. / Through the analysis of optimization and simulation studies regarding the energy operation of the existing plants in the Paranapanema river, situated in the southwestern region of the state of São Paulo, Brazil, it was shown that the system operation, based on operation rules achieved considering the cascate optimization, yields significant gains of generation and stored energy in the system, therefore providing a better use of the available hydrologic resources, as well as a more favorable final storage level for each plant, which implies in a more efficient and reliable operation of the whole set.
8

Ferramenta para avaliação da energia firme baseada em técnica de pontos interiores / A tool for evaluation of firm energy based on interior point technique

Rocha, Rafael Santos 15 August 2008 (has links)
Submitted by Renata Lopes (renatasil82@gmail.com) on 2017-04-19T17:29:36Z No. of bitstreams: 1 rafaelsantosrocha.pdf: 980623 bytes, checksum: 82b73ddc57b57ae5da6c345e14f34a15 (MD5) / Approved for entry into archive by Adriana Oliveira (adriana.oliveira@ufjf.edu.br) on 2017-04-20T12:28:44Z (GMT) No. of bitstreams: 1 rafaelsantosrocha.pdf: 980623 bytes, checksum: 82b73ddc57b57ae5da6c345e14f34a15 (MD5) / Made available in DSpace on 2017-04-20T12:28:44Z (GMT). No. of bitstreams: 1 rafaelsantosrocha.pdf: 980623 bytes, checksum: 82b73ddc57b57ae5da6c345e14f34a15 (MD5) Previous issue date: 2008-08-15 / CAPES - Coordenação de Aperfeiçoamento de Pessoal de Nível Superior / O planejamento do setor energético é fundamental para assegurar o suprimento de energia ao menor custo, com o menor risco e com os menores impactos sócio-econômicos e ambientais para a sociedade. Estes fatores assim como a complexidade dos aspectos envolvidos no funcionamento da indústria de produção de energia elétrica explicam a importância do planejamento do setor energético. Atualmente, o sistema elétrico brasileiro é operado de maneira centralizada por agentes reguladores que atuam com grande poder institucional sobre as variáveis do sistema através de decisões que trazem impactos e influenciam fortemente o futuro dos sistemas. O fato de o sistema brasileiro ser predominantemente hidrelétrico faz com que essas decisões, na maioria das vezes, sejam tomadas num ambiente de incertezas e assim necessitam de processos sistemáticos de apoio à decisão, em especial sobre as perspectivas do futuro com relação aos riscos de suprimento de energia. Neste contexto, a energia firme, definida como a máxima capacidade de produção contínua de energia, sem a ocorrência de déficits energéticos, influencia diretamente na remuneração das usinas hidrelétricas e na realização dos contratos de venda de energia elétrica pois é utilizada no cálculo da energia assegurada, que representa o lastro de geração de energia destas usinas no Brasil. Hoje, o cálculo da energia firme de cada usina hidrelétrica do sistema elétrico brasileiro é feito através de modelos de simulação, em particular, os modelos Modelo de Simulação de Usinas Individualizadas (MSUI) desenvolvido pela Eletrobrás e o Modelo de Simulação a Usinas Individualizadas para Subsistemas Hidrotérmicos Interligados (SUISHI-O) desenvolvido pelo Centro de Pesquisas em Energia Elétrica (CEPEL). A topologia das usinas é respeitada e, através de regras heurísticas, é simulada a operação das mesmas, considerando-se a série histórica de vazões desde janeiro de 1931. Este trabalho tem como objetivo o desenvolvimento de uma ferramenta computacional destinada ao cálculo da energia firme das usinas hidrelétricas. Para isto, é proposta uma solução, através de um único problema de programação não linear, com a representação das não linearidades inerentes à produtividade das usinas hidrelétricas e a representação individualizada dos reservatórios juntamente com a série histórica de vazões desde o mês de janeiro de 1931. A solução do problema de otimização não linear é obtida através do Método Primal-Dual de Pontos Interiores (MPI). A metodologia proposta foi implementada em linguagem C++, permitindo aplicar o cálculo de energia firme ao Sistema Interligado Nacional Brasileiro (SIN). Será apresentado um estudo de caso abrangendo o Sistema Interligado Nacional (SIN), resultando em um problema com mais de 400 mil variáveis, onde poderá ser observada a importância de se resolver o problema considerando-se as não linearidades em um problema de otimização. Estes resultados foram comparados com os obtidos através do modelo linear do cálculo da energia firme. Resultados adicionais com a entrada de novas usinas no sistema (Estreito Tocantins e Peixe Angical) são avaliados para validar a aplicação da metodologia a sistemas reais. Os resultados obtidos mostram que a metodologia proposta é promissora. Adicionalmente, o sistema computacional desenvolvido é uma ferramenta capaz de receber aperfeiçoamentos e modificações para incorporação de diversas outras funcionalidades relacionadas ao planejamento e operação de sistemas elétricos de potência. / The energy sector planning is fundamental to assure the energy supply at the smallest costs and risks and with the smallest socioeconomic and environmental impacts for the society. These factors as well as the aspects complexity involved in the industry operation of the electrical energy production explain the importance of the energy sector planning. Nowadays, the Brazilian electrical system is operated centralized by regulators agents that acts with great institutional power on the system’s variables through decisions that brings impacts and strongly influence the future of the systems. The fact of the Brazilian system predominantly being hydroelectric does those decisions, in most of the time, to be taken in an uncertain environment and then requires systematic processes of decision support, especially above the future perspectives regarding the energy supply risks. In this context, the firm energy, defined as the maximum continuous capacity of energy production, without the occurrence of energy deficits, influence directly the remuneration of the hydroelectric power stations and the electric power sales contracts because it is used in the evaluation of the assured energy, that represents the energy generation ballast of these plants in Brazil. Today, the firm energy evaluation of each hydroelectric power station of the Brazilian electrical system is accomplished through simulation models, in particular, the MSUI model, developed by Eletrobr´as and the SUISHI-O model, developed by CEPEL. The power stations topology is respected and, through heuristic rules, is simulated its operation, considering the historical flow series since January of 1931. This work has as objective the development of a computacional tool destined to the firm energy evaluation of the hydroelectric power stations. For this, a solution is proposed, through a single nonlinear programming problem, with the representation of the nonlinearities inherent to the hydroelectric power stations productivity and the individualized reservoirs representation together with the historical flow series since January of 1931. The solution of the nonlinear optimization problem is obtained through Primal-Dual Interior Point Method. The proposed methodology was implemented in computational language C++, allowing to apply the firm energy evaluation to the Brazilian Interconnected National System. A study case will be presented extending the Brazilian Interconnected National System, resulting in a problem with more than 400 thousand variables, in wich it will be observed the importance to solve the problem considering the nonlinearities in a unique optimization problem. These results were compared to the obtained ones with the linear model of the firm energy evaluation. Additional results with the entrance of new power stations in the system (Estreito Tocantins and Peixe Angical) are evaluated to validate the methodology appliance to real systems. The obtained results shows that the proposed methodology is promising. Additionally, the developed software is a tool capable to receive improvements and modifications for incorporation of several other functionalities related to the planning and operation of electrical power systems.
9

Integração entre as atividades de planejamento e operação em uma empresa de distribuição de energia elétrica. / Integration between the activities of planning and operation in electric utility.

Daniel Gomes da Silva 25 March 2013 (has links)
O grau de integração entre as áreas de planejamento da expansão e de planejamento da operação de concessionárias de distribuição de energia elétrica ainda é insuficiente, pelo menos no caso brasileiro. Isso significa que a área de planejamento da operação não pode explorar plenamente e implementar os resultados e as recomendações trazidas pela área de planejamento da expansão em seus estudos de planejamento da operação. Como consequência, uma quantidade considerável de trabalho torna-se redundante, a eficiência é reduzida e há perda de qualidade. Além disso, uma concessionária de distribuição de energia elétrica geralmente possui vários sistemas independentes para a análise de redes elétricas de acordo com seu tipo (equilibrado ou desequilibrado), nível de tensão (subtransmissão, distribuição primária ou distribuição secundária) e sua topologia (radial ou malha). Obviamente, essa falta de integração também implica grandes dificuldades na realização de estudos de planejamento e de operação, ainda mais com a disponibilidade dos dados hoje difundida. Este trabalho tem como objetivo melhorar essa integração por meio de uma nova metodologia e de um sistema computacional de apoio. Uma das características mais interessantes da ferramenta é precisamente a sua capacidade de analisar qualquer tipo de rede elétrica, independentemente dos parâmetros. Por meio de alguns estudos de casos, demonstra-se como uma melhor integração entre as duas áreas dentro de um banco de dados significa redução de tempo na execução de atividades de ambas as áreas, eliminação de retrabalho e melhor qualidade dos resultados, que são posteriormente enviados para o operador nacional do sistema (ONS). / The degree of integration between the expansion planning and the operational planning areas in electricity distribution utilities is still insufficient, at least in the Brazilian case. This means that the latter cannot fully exploit and implement results and recommendations brought about by the former in its planning studies. As a consequence, a considerable amount of work becomes redundant, with reduced efficiency and loss of quality. In addition, an electricity distribution utility usually possesses various independent systems for analyzing electrical networks according to their type (balanced or unbalanced), their rated voltage (subtransmission, primary feeder or low-voltage circuit) and their topology (radial or meshed). Obviously, this lack of integration also implies considerable difficulties when carrying out planning and operational studies, even more with today´s widespread data availability. This work focuses on improving such integration through a new methodology and a supporting computational system. One of the most interesting features of the software is precisely its ability to analyze any type of electrical network, regardless of the above parameters. Through some study cases, it is shown how a better integration between the two areas within a utility means reduced overall time, elimination of redundant work and better quality of results, which are later sent to the independent system operator (ISO).
10

Integração entre as atividades de planejamento e operação em uma empresa de distribuição de energia elétrica. / Integration between the activities of planning and operation in electric utility.

Silva, Daniel Gomes da 25 March 2013 (has links)
O grau de integração entre as áreas de planejamento da expansão e de planejamento da operação de concessionárias de distribuição de energia elétrica ainda é insuficiente, pelo menos no caso brasileiro. Isso significa que a área de planejamento da operação não pode explorar plenamente e implementar os resultados e as recomendações trazidas pela área de planejamento da expansão em seus estudos de planejamento da operação. Como consequência, uma quantidade considerável de trabalho torna-se redundante, a eficiência é reduzida e há perda de qualidade. Além disso, uma concessionária de distribuição de energia elétrica geralmente possui vários sistemas independentes para a análise de redes elétricas de acordo com seu tipo (equilibrado ou desequilibrado), nível de tensão (subtransmissão, distribuição primária ou distribuição secundária) e sua topologia (radial ou malha). Obviamente, essa falta de integração também implica grandes dificuldades na realização de estudos de planejamento e de operação, ainda mais com a disponibilidade dos dados hoje difundida. Este trabalho tem como objetivo melhorar essa integração por meio de uma nova metodologia e de um sistema computacional de apoio. Uma das características mais interessantes da ferramenta é precisamente a sua capacidade de analisar qualquer tipo de rede elétrica, independentemente dos parâmetros. Por meio de alguns estudos de casos, demonstra-se como uma melhor integração entre as duas áreas dentro de um banco de dados significa redução de tempo na execução de atividades de ambas as áreas, eliminação de retrabalho e melhor qualidade dos resultados, que são posteriormente enviados para o operador nacional do sistema (ONS). / The degree of integration between the expansion planning and the operational planning areas in electricity distribution utilities is still insufficient, at least in the Brazilian case. This means that the latter cannot fully exploit and implement results and recommendations brought about by the former in its planning studies. As a consequence, a considerable amount of work becomes redundant, with reduced efficiency and loss of quality. In addition, an electricity distribution utility usually possesses various independent systems for analyzing electrical networks according to their type (balanced or unbalanced), their rated voltage (subtransmission, primary feeder or low-voltage circuit) and their topology (radial or meshed). Obviously, this lack of integration also implies considerable difficulties when carrying out planning and operational studies, even more with today´s widespread data availability. This work focuses on improving such integration through a new methodology and a supporting computational system. One of the most interesting features of the software is precisely its ability to analyze any type of electrical network, regardless of the above parameters. Through some study cases, it is shown how a better integration between the two areas within a utility means reduced overall time, elimination of redundant work and better quality of results, which are later sent to the independent system operator (ISO).

Page generated in 0.1185 seconds