• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Förbättrat underhåll av fasta korsningar i spårväxlar / Improved Maintenance of Fixed Crossings in Railway S&C

Laitila, Johan January 2019 (has links)
Järnvägen har möjliggjort boende och arbete på olika orter, genom tågpendling, samt intresset för godstransporter på järnvägen ökar. För att upprätthålla en god status på järnvägen behövs mycket pengar, samtidigt som dess tillgänglighet påverkar många människor. Detta gör det än mer angeläget med en robust järnvägsanläggning, med hög tillgänglighet samt en god punktlighet för både person- och godståg. Ett bättre planerat underhåll möjliggör en längre användbar livstid för samtliga komponenter i järnvägsanläggningen. Som anläggningsdel förorsakar spårväxlar den högsta kostnaden i en banöverbyggnad, med korsningar som ett av de mest frekventa komponentbytena. Idag är den användbara livstiden på fasta mangankorsningar för låg, ca 100 MBrt, då den förväntas vara mellan 100–500 MBrt. Detta ligger till grund för arbetet där syftet är att undersöka hur det förbyggande underhållet av fasta korsningar i spårväxlar bättre kan planeras, utföras och följas upp för att förlänga dess användbara livstid. Vidare är målet med examensarbetet att genom en nulägesanalys, som innefattar dagens erfarenheter, förslag till förbättrade arbetsmetoder och morgondagens informationsinhämtning, fastställa vilken information som kommer att krävas för att på ett bättre sätt planera underhållet, samt att fastställa vilka underhållsåtgärder som är nödvändiga för det förebyggande underhållet av fasta korsningar i spårväxlar. Baserat på detta utformas en underhållsplan med tillhörande LCC för fasta korsningar i spårväxlar. Vidare ska samtliga underhållsåtgärder i underhållsplanen vara planeringsbara minst 3 månader i förväg, och det är önskvärt att underhållsplanen ska sträcka sig 36 månader framåt. Initialt utförs en nulägesanalys och arbetet fortsätter med förslag på förbättrade arbetsmetoder. Båda i avseende hur och när underhåll utförs på fasta mangankorsningar idag ute i anläggningen. Avslutningsvis presenteras en underhållsplan med intervall samt de resurser som krävs för de underhållsåtgärder som ska utföras. Dessa åtgärder är byte av korsning, inslipning, slipning, påsvets, spårriktning/stoppning, shimsning av moträl, byte av korkgummi samt ballastrening. Tillhörande till underhållsplanen utformas en kalkyl för livscykelkostnad, LCC, där arbete efter nuläge samt arbete efter underhållsplan jämförs. Resultatet från arbetet visar att samtliga entreprenörer anser att brist på tid i spår är en starkt bidragande faktor till att fasta korsningar byts. Detta tillsammans med att rätt förebyggande underhållsåtgärder som inslipning och förebyggande slipning för att upprätthålla profil, samt kontroll av spårläge och åtgärd vid behov inte görs. Vidare utför entreprenören ingen uppföljning av utförda underhållsåtgärder, utan beslut om underhållsåtgärder baseras till stor del på säkerhets- och underhållsbesiktningar. Detta medför att de arbetar mest avhjälpande, med åtgärd av besiktningsanmärkning. Dock för växelrevision och systematiskt växelunderhåll är erfarenhet, god lokalkännedom och god kännedom om anläggningen den avsevärt största informationskällan för entreprenören idag. Infrastrukturägaren utför även en viss leveransuppföljning, dock inte i tillräcklig utsträckning för att säkerställa att de får det som beställts. Registrering av samtliga förebyggande underhållsåtgärder bör förbättra och förenkla infrastrukturägarens uppföljning. Vidare för att möjliggöra en mer strategisk underhållsplanering behövs metoder för tillståndsbaserat underhåll tas fram, i syfte att få en bättre uppfattning om degradering av profilen för en fast mangankorsning. Till detta krävs automatiska maskinella mätningar, vilket gör mätningar reproducerbara och mätdata går att trenda. Slutligen den bristfälliga återrapporteringen av förebyggande underhållsåtgärder i kombination med entreprenörens hemlighållande av exakt underhållskostnad, resulterar i att underhållskostnaden för korsningar inte kan redovisas på en aggregerad och individuell nivå. / The railroad has made it possible for housing and work at various locations, by rail lanes, and the interest in rail freight transport is increasing. To maintain good status on the railroad, a lot of money is needed, while its availability affects many people. This makes it even more important with a robust railway facility, with high availability and good punctuality for both passenger and freight trains. Better planned maintenance enables longer useful life for all components of the railway facility. As part of the plant do railway S&C cause the highest cost in a track superstructure, with crossings as the most frequent component changes. Today, the useful life of fixed manganese crossings is too low, about 100 MBrt, since the expectancy is between 100 -500 MBrt. This is the basis for the work, where the purpose is to investigate how the preventive maintenance of fixed crossings in S&C can be better planned, performed and followed up to extend its useful life. Furthermore, the aim of the thesis work is to determine, through a current situation analysis, which includes current experiences, proposals for improved working methods and tomorrow's information gathering, which information will be required to better plan maintenance, and to determine which maintenance measures are necessary for the preventive maintenance of fixed crossings in S&C. Based on this, a maintenance plan with associated LCC is designed for fixed crossings in S&C. Furthermore, all maintenance measures in the maintenance plan must be planned at least 3 months in advance, and it is desirable that the maintenance plan should extend 36 months ahead. Initially, a zero-position analysis is performed, and work continues with suggestions for improved working methods. Both in terms of how and when maintenance is carried out on fixed crossings today outside in the railway facility. Finally, a maintenance plan is presented with intervals and the resources required for the maintenance actions to be performed. These actions include change of crossing, grinding in, grinding, welding, track direction/padding, shimming guardrail, changing of corkrubber and ballast cleaning. Compliance with the maintenance plan is a life cycle cost calculation, LCC, comparing work according to zero-position and work according to maintenance plan. The results from the work show that all entrepreneurs believe that lack of time in the track is a strong contributing factor to changing fixed crossings. This, along with proper preventive maintenance measures such as grinding in and preventive grinding to maintain profile, as well as verify track position and action when needed are not done. In addition, the contractor does not perform any follow-up on performed maintenance work, maintenance decisions are based largely on safety and maintenance inspections. This means that they work most correctively, with the action of inspection note. However, for exchange audit and systematic gear maintenance, experience, good local knowledge and good knowledge of the plant is the most important source of information for the entrepreneur today. The infrastructure owner also performs a certain delivery follow-up, but not sufficiently to ensure that they get what is ordered. Registration of all preventive maintenance measures should improve and simplify the infrastructure owner's follow-up. In addition, to enable more strategic maintenance planning, condition-based maintenance methods are required, with a view to gaining a better perception of degradation of the profile of a fixed manganese crossing. In addition, automatic machine measurements are required, which makes measurements reproducible and measurement data can be trend. Finally, the inadequate reporting of preventive maintenance measures in combination with the contractor's secrecy of exact maintenance costs, results in the maintenance cost for crossings not being reported at an aggregated and individual level.
2

IMPROVE MAINTENANCE EFFECTIVENESS AND EFFICIENCY BY USING HISTORICAL BREAKDOWN DATA FROM A CMMS : Exploring the possibilities for CBM in the Manufacturing Industry

Fridholm, Victoria January 2018 (has links)
Purpose: Explore how historical data from a CMMS can be used in order to improve maintenance effectiveness and efficiency of activities, and investigate the possibilities for CBM in the manufacturing industry in the context of digitalization.  Research questions: RQ1: To what extent could condition-based maintenance or other maintenance types being used in order to predict, prevent or in other way eliminate historical breakdowns/faults?  RQ2: Which significance has an organization's degree of maturity to reduce the number of breakdowns?  Method: A case study was performed at Volvo Construction Equipment Operations in Eskilstuna, who manufactures machinery for the construction industry. The case study was compiled in two phases. Phase one was a quantitative study where raw data were collected from a CMMS and tabulated in order to later perform in-depth analysis. Phase two was designed to collect information that generated a wider understanding of the research area, by performing interviews and observations. A literature study was performed to compare the empirical findings with peer-reviewed information to ensure the quality of the study. The data is compiled and analyzed with an abductive approach. The analysis was followed by a discussion of how the research findings could support identifying possibilities of different maintenance types in the future.  Conclusion: The result showed that using historical breakdown data from a CMMS can be useful in order to identify organization’s current state and what possibilities different maintenance types have to decrease the number of breakdowns. To what extent the breakdowns can be decreased relies not only on the maintenance type but also an organizations maturity level. The case study´s result showed that by combining different maintenance types and increasing degree of maturity, Volvo could decrease the historical breakdowns with 86,5%. By only using CBM with current maturity level, 56% of the historical breakdowns could be predicted. However, to decide how many breakdowns that is cost-effective to prevent and precisely what maintenance type that should be used requires a cost analysis which this study is not covering.

Page generated in 0.1126 seconds