Spelling suggestions: "subject:"proceso analítico jerárquico"" "subject:"proceso analítico hierárquico""
1 |
Definición de una herramienta de apoyo para la toma de decisiones en el proceso de selección de proveedores en una cadena de supermercadosBrufman, Ana Flavia 24 November 2015 (has links)
No description available.
|
2 |
Análisis de criterios de diseño básico de una terminal de contenedores de sustancias químicas peligrosas aplicando el proceso analítico jerárquico (AHP)Molero Prieto, Gemma Dolores 14 March 2016 (has links)
[EN] During the last years the dangerous goods containers transport are increasing generating port congestion. We had analyzed the criteria for designing an inland dangerous goods container terminal using Analytic Hierarchic Process (AHP). Particularly we had work in 5 areas defined after studying the state of the art: machines and instruments, Business Intelligence (BI), protection and security, Technologies Information and Communication (TIC) and environment. In our study an expert panel has participated on the criteria defining and for obtaining criteria weights. We have defined 88 criteria. The results are of great interest for future applications on the design of container terminals with dangerous goods and will be applied in the selection process of terminals with the Analytic Network Process (ANP). / [ES] En los últimos años se ha producido un incremento considerable del transporte de contenedores de mercancías peligrosas, con la consiguiente congestión de puertos, para dar respuesta a esta problemática, hemos investigado y desarrollado esta tesis. Nuestro objeto de estudio ha sido el análisis de criterios de diseño básico de una terminal interior de contenedores de sustancias químicas peligrosas aplicando el proceso analítico jerárquico (AHP). En particular se ha recurrido al estudio en 5 áreas principales: maquinaria y equipos, Bussines Intelligence (BI), seguridad y protección, Tecnologías de la Información y la Comunicación (TIC) y medio ambiente que han sido definidos tras el estudio del estado del arte. Para poder definir estas áreas se ha trabajado con un panel de expertos en la determinación y análisis de los criterios. Analizando mediante el método todos los factores y determinando los pesos locales y globales. Se han priorizado un total de 88 criterios. Los resultados de esta investigación servirán en próximos estudios para aplicarlos a la selección de terminales con el método proceso analítico en red (ANP). / [CA] En els últims anys s'ha produït un increment considerable del transport de contenidors de mercaderies perilloses, amb la consegüent congestió de ports. Per donar resposta a aquesta problemàtica hem investigat i desenvolupat aquest treball de tesi. El nostre objecte d'estudi ha estat l'anàlisi de criteris de disseny bàsic en una terminal interior de contenidors de substàncies químiques perilloses aplicant-hi el procés analític jeràrquic (AHP, Analytic Hierarchic Process). En particular, l'estudi s'ha focalitzat en cinc àrees principals: maquinària i equips, Business Intelligence (BI), seguretat i protecció, Tecnologies de la Informació i la Comunicació (TIC) i, finalment, medi ambient.Per poder definir aquestes àrees s'ha treballat, amb l'ajut d'un panell d'experts, en la determinació i l'anàlisi dels criteris de disseny de la terminal, estudiant els factors i determinant-ne els pesos locals i globals. En total, s'hi han prioritzat i avaluat més de vuitanta criteris de disseny diferents. Com a línies obertes de treball, els resultats d'aquesta investigació serviran per fer la selecció de terminals mitjançant el mètode anomenat procés analític en xarxa (ANP, Analytic Network Process). / Molero Prieto, GD. (2016). Análisis de criterios de diseño básico de una terminal de contenedores de sustancias químicas peligrosas aplicando el proceso analítico jerárquico (AHP) [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/61773
|
3 |
Priorización de especies para los proyectos de repoblación forestal incorporando criterios de cambio climático en el Parque Natural Serra de MariolaGonzález Utrillas, Nuria Vanesa 07 April 2016 (has links)
[EN] The selection of appropriate species in a reforestation project has always been a complex decision-making problem in which, due mostly to government policies and other stakeholders, not only economic criteria but also other environmental issues interact. Climate change has not usually been taken into account in traditional reforestation decision-making strategies and management procedures. Moreover, there is a lack of agreement on the percentage of each one of the species in reforestation planning, which is usually calculated in a discretionary way. In this context, a multicriteria technique has been developed in order to improve the process of selecting species for reforestation in the Mediterranean region of Spain. A hybrid Delphi-AHP methodology is proposed, which includes a consistency analysis in order to reduce random choices. As a result, this technique provides a percentage distribution of the appropriate species to be used in reforestation planning, bearing in mind the climate-change related criteria promoted by the European Commission. / [ES] La selección de especies en una repoblación forestal constituye un complejo problema de toma de decisiones, donde interactúan no sólo criterios económicos sino también otros aspectos medioambientales, impuestos en muchos casos desde políticas gubernamentales o grupos de presión. El cambio climático no ha sido tenido en cuenta en las estrategias tradicionales de toma de decisiones en las repoblaciones. Es más, hay actualmente una falta de consenso acerca del peso que cada especie debe tener en la reforestación multiespecífica, el cual se calcula normalmente de un modo discrecional. En este contexto, se desarrolla aquí una técnica multicriterio para mejorar el proceso de selección de especies en una reforestación localizada en el área Mediterránea. Se propone, pues, una metodología híbrida Delphi-AHP, la cual incluye un análisis de consistencia para reducir las elecciones aleatorias. Como resultado, esta técnica proporciona un porcentaje de distribución de las especies apropiadas para ser utilizadas en la planificación de la reforestación, teniendo en cuenta criterios de cambio climático, tal y como recomienda la Comisión Europea. / [CA] La selecció d'espècies en una repoblació forestal constituïx un complex problema de presa de decisions, on interactúen no sols criteris econòmics sinó també altres aspectes mediambientals, impostos en molts casos des de polítiques governamentals o grups de pressió. El canvi climàtic no ha sigut tingut en compte en les estratègies tradicionals de presa de decisions en les repoblacions. És més, hi ha actualment una falta de consens sobre el pes que cada espècies ha de tindre en la reforestació multiespecífica, el qual es calcula normalment d'una manera discrecional. En este context, es desenrotlla ací una técnica multicriterio per a millorar el procés de selecció d'espècies en una reforestació localitzada en l'àrea Mediterrània. Es proposa, doncs, una metodología híbrida Delphi-AHP, la qual inclou una anàlisi de consistencia per a reduir les eleccions aleatòries. Com a resultat, esta técnica proporciona un percentatge de distribució de les espècies apropiades per a ser utilitzades en la planificació de la reforestació, tenint en compte criteris de canvi climàtic, tal com recomana la Comissió Europea. / González Utrillas, NV. (2016). Priorización de especies para los proyectos de repoblación forestal incorporando criterios de cambio climático en el Parque Natural Serra de Mariola [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/62326
|
4 |
Tres décadas de Evaluación del Impacto Ambiental en España. Revisión, necesidad y propuestas para un cambio de paradigmaTomás Sánchez, José Enrique de 23 January 2015 (has links)
Desde la implantación de la Evaluación del Impacto Ambiental en España, hace ya más de tres décadas, ni los procedimientos ni el concepto mismo parecen haber experimentado evolución alguna, al menos a mejor. Varios factores han contribuido a que, en la actualidad, la EIA se haya convertido en poco más que un requisito administrativo, en “una cosa más” que pedir a los promotores que pretendan implementar sus proyectos. La verdadera importancia de una EIA consistente y orientada a la protección y conservación del medio ambiente ha sido relegada a una posición de languidecimiento como principio y de obstáculo como requisito para el desarrollo. Las causas deben buscarse entre varias razones: - La apatía de la Administración y su propio interés en que el Medio Ambiente no tenga la entidad que la sociedad demanda (de lo cual es buena muestra el que en ninguna de las Administraciones del Estado, este goce de identidad propia, sino que se encuentra supeditado a otros principios políticamente superiores, como el urbanismo o la industria, de quienes es subsidiario en todos los casos) o de que sus competencias estén repartidas entre esas otras instancias “de rango superior”. - La confusión normativa, distinta (a veces muy distinta) en las diferentes Comunidades Autónomas. - La supeditación (completamente artificial y equivocada) de lo medioambiental a lo técnico. - La falta de medios humanos de la administración. - La falta de preparación, tanto entre el personal de la Administración como entre los profesionales del medio ambiente dedicados a la EIA. - La bajísima calidad promedio de los Estudios de Impacto Ambiental que se vienen presentando ante la Administración. En este último punto, el único que consideramos está en nuestras manos el contribuir a paliar, es en el que nos hemos centrado en nuestro trabajo, dividido en tres partes: 1. Trabajo de campo: Se evaluaron un total de 127 EsIA que, a falta de mayor colaboración por parte de la Administración, hubieron de ser obtenidos fundamentalmente de internet. De ellos, 77 se consideraron adecuados para su evaluación. 2. Procesos de evaluación de alternativas: Dada la habitual falta de un procedimiento claro y consistente de participación pública y elección de la mejor alternativa viable, exponemos algunos métodos matemáticamente consistentes de apoyo a la toma de decisiones. 3. Metodología de evaluación de impactos ambientales: En la actualidad, la metodología de evaluación de impactos más ampliamente utilizada es la llamada de los “números crisp”, o “números precisos”. Argumentamos la falta de consistencia matemática del procedimiento y proponemos la utilización de métodos basados en la lógica difusa; diseñamos, construimos y probamos un sistema de inferencia difusa al que llamamos SIDEIA, y proponemos su utilización como medio de incorporar la ineludible subjetividad, imprecisión e incertidumbre subyacente en gran cantidad de los datos relativos al medio ambiente necesarios para realizar la evaluación de impactos.
|
5 |
Evaluación de infraestructuras para el impulso sostenible de la comarca de la costeraJuan García, Francisco 08 January 2016 (has links)
[EN] The role of infrastructures in boosting the economic growth of the regions is widely recognized. In many cases, an infrastructure is selected by subjective reasons. Selection of the optimal infrastructure for sustainable economic development of a region should be based on objective and founded reasons, not only economical, but also environmental and social. In this paper is developed such selection through a hybrid method based on Delphi, analytical hierarchy process (AHP), and VIKOR (from Serbian, VIseKriterijumska Optimizacija I Kompromisno Resenje). To do this, a panel of experts assesses both the infrastructures and the drivers for their selection. The method lets us to verify the consistency of answers from experts. In our case, AHP obtains preference values for each infrastructure using the eigenvector method. Meanwhile, the VIKOR method evaluates whether the proposed is the one that best fits the prevailing view, minimizing the regret to the most separate opinions. Thus, for La Costera (Spain), the region under study, this research work concludes that the thematic route is the optimal infrastructure. / [ES] El papel de las infraestructuras en el impulso del crecimiento económico de las regiones es ampliamente reconocido. En muchos casos, una infraestructura es seleccionada por razones subjetivas. La selección de la infraestructura óptima para el desarrollo sostenible de una región debería basarse en razones objetivas y justificadas, y no sólo económicas, sino también ambientales y sociales. En esta tesis doctoral se desarrolla tal selección a través de un método híbrido basado en Delphi, el Proceso Analítico Jerárquico (AHP) y VIKOR (del serbio, VIseKriterijumska Optimizacija I Kompromisno Resenje). Para ello, un panel de expertos evalúa tanto las infraestructuras como los criterios para su selección. El método permite verificar la consistencia de las respuestas de los expertos. En nuestro caso, AHP proporciona valores de preferencia para cada infraestructura usando el método del autovector. Por su parte, el método VIKOR evalúa si la infraestructura propuesta es la que mejor se ajusta a la opinión predominante, minimizando la pena de las opiniones más divergentes. Así, para la comarca de La Costera, la región en estudio, esta tesis concluye que la ruta temática es la infraestructura óptima. / [CA] El paper de les infraestructures en l'impuls del creixement econòmic de les regions és àmpliament reconegut. En molts casos, una infraestructura és seleccionada per raons subjectives. La selecció de la infraestructura òptima per al desenrotllament sostenible d'una regió hauria de basar-se en raons objectives i justificades, i no sols econòmiques, sinó també ambientals i socials. En esta tesi doctoral es desenrotlla tal selecció a través d'un mètode híbrid basat en Delphi, el Procés Analític Jeràrquic (AHP) i VIKOR (del serbi, VIseKriterijumska Optimizacija I Kompromisno Resenje). Per a això, un panell d'experts avalua tant les infraestructures com els criteris per a la seua selecció. El mètode permet verificar la consistència de les respostes dels experts. En el nostre cas, AHP proporciona valors de preferència per a cada infraestructura usant el mètode de l'autovector. Per la seua banda, el mètode VIKOR avalua si la infraestructura proposada és la que millor s'ajusta a l'opinió predominant, minimitzant la pena de les opinions més divergents. Així, per a la comarca de la Costera, la regió en estudi, esta tesi conclou que la ruta temàtica és la infraestructura òptima. / Juan García, F. (2015). Evaluación de infraestructuras para el impulso sostenible de la comarca de la costera [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/59522
|
6 |
Contributions to the design of pumping stations in water distribution networks considering technical, economic and environmental aspects.Briceño León, Christian Xavier 03 May 2023 (has links)
Tesis por compendio / [ES] El consumo energético de una estación de bombeo (EB) representa el mayor consumo de energía de un sistema de de distribución de agua. Adicionalmente, otros problemas como el cambio climático, el estrés hídrico y emisión de gases de efecto invernadero conducen a la necesidad de optimizar este tipo de instalaciones, tanto en su diseño como en su operación.
La presente tesis doctoral consta de tres etapas de desarrollo. La primera etapa desarrolla una metodología de optimización de la operación de EB. La segunda etapa desarrolla un método de diseño de estaciones de bombeo considerando aspectos técnicos y económicos basados en el método AHP (Analytic Hierarchy Process, del Ingles). Finalmente, la tercera etapa es una mejora de la segunda añadiendo aspectos ambientales y consideración de variabilidad de la demanda.
Una de las principales contribuciones es el desarrollo de una metodología para la optimización del funcionamiento de una EB. Esta metodología se basa en el uso de la curva de consigna y una operación combinando bombas de velocidad fija (BVF) y bombas de velocidad variable (BVV). El objetivo de este método es determinar el número óptimo de BVF y BVV en para cualquier caudal minimizando el consumo energético total de la EB. Esta metodología corrige la eficiencia de BVV determinada por las leyes de semejanza e incluye una formulación matemática de la eficiencia del variador de frecuencia.
El diseño convencional de EB se basa la minimización del coste del ciclo de vida (CCV); suma de costes de inversión, operación y mantenimiento. La segunda etapa de la tesis, desarrolla un método integral de diseño de EB considerando aspectos técnicos y económicos aplicando el método AHP. La metodología propuesta consta de tres fases. La primera fase está relacionada la definición de los datos requeridos de la EB y permite definir los modelos factibles para la red. La segunda fase está relacionada con la definición de las posibles soluciones y su evaluación con los criterios técnicos y económicos. La tercera fase está relacionada con el cálculo del frente de Pareto del conjunto de soluciones obtenidas y la aplicación del método AHP.
La metodología desarrollada en la segunda etapa de la tesis presenta cuatro limitaciones. La primera es no considerar los criterios medioambientales en el diseño de la EB. La segunda es no considerar la optimización del funcionamiento de una EB definido en la primera etapa. LA tercera está relacionada con la escala utilizada en el método AHP. La cuarta es la consideración de un único patrón de consumo en la estación de bombeo. Por ello, en la tercera etapa de la tesis se desarrolla una nueva propuesta de metodología de diseño de EB que pretende solventar estos problemas. Este nuevo método considera criterios medioambientales como el MEI, las emisiones de efecto invernadero o la eficiencia del método de regulación en la EB. El método incluye también una propuesta de modificación de la escala tradicional de valoración clásica del AHP.
Las metodologías propuestas se han validado de forma comparativa con dos redes de distribución de agua (redes CAT y TF). Sobre ambas redes se compararon tanto los diferentes métodos propuestos como su comparativa con un planteamiento clásico del problema de diseño de una EB. En resumen, el la tesis recoge una metodología estandarizada para el diseño de cualquier tipo de EB (para agua potable, para riego etc.) considerando la configuración de bombeo más adecuada, haciendo uso de una variabilidad de la demanda, y considerando diferentes tipos de criterios (técnicos, económicos y ambientales) a través de un análisis multi criterio de toma de decisiones. / [CA] El consum energètic d'una estació de bombament (EB) representa el consum d'energia més gran d'un sistema de distribució d'aigua. Addicionalment, altres problemes com el canvi climàtic, l'estrès hídric i l'emissió de gasos d'efecte hivernacle condueixen a la necessitat d'optimitzar aquest tipus d'instal¿lacions, tant pel que fa al disseny com a l'operació.
Aquesta tesi doctoral consta de tres etapes de desenvolupament. La primera etapa desenvolupa una metodologia d"optimització de l"operació d"EB. La segona etapa desenvolupa un mètode de disseny d'estacions de bombament considerant aspectes tècnics i econòmics basats en el mètode AHP (Analytic Hierarchy Process, de l'Angles). Finalment, la tercera etapa és una millora de la segona afegint-hi aspectes ambientals i consideració de variabilitat de la demanda.
Una de les contribucions principals és el desenvolupament d'una metodologia per optimitzar el funcionament d'una EB. Aquesta metodologia es basa en lús de la corba de consigna i una operació combinant bombes de velocitat fixa (BVF) i bombes de velocitat variable (BVV). L'objectiu d'aquest mètode és determinar el nombre òptim de BVF i BVV en qualsevol cabal minimitzant el consum energètic total de l'EB. Aquesta metodologia corregeix l"eficiència de BVV determinada per les lleis de semblança i inclou una formulació matemàtica de l"eficiència del variador de freqüència.
El disseny convencional dEB es basa la minimització del cost del cicle de vida (CCV); suma de costos dinversió, operació i manteniment. La segona etapa de la tesi desenvolupa un mètode integral de disseny d'EB considerant aspectes tècnics i econòmics aplicant el mètode AHP. La metodologia proposada consta de tres fases. La primera fase està relacionada amb la definició de les dades requerides de l'EB i permet definir els models factibles per a la xarxa. La segona fase està relacionada amb la definició de les possibles solucions i la seva avaluació amb criteris tècnics i econòmics. La tercera fase està relacionada amb el càlcul del front de Pareto del conjunt de solucions obtingudes i laplicació del mètode AHP.
La metodologia desenvolupada a la segona etapa de la tesi presenta quatre limitacions. La primera és no considerar els criteris mediambientals en el disseny de lEB. La segona és no considerar l'optimització del funcionament d'una EB definit a la primera etapa. La tercera està relacionada amb l'escala utilitzada al mètode AHP. La quarta és la consideració d'un únic patró de consum a l'estació de bombament. Per això, a la tercera etapa de la tesi es desenvolupa una nova proposta de metodologia de disseny d'EB que pretén resoldre aquests problemes. Aquest nou mètode considera criteris mediambientals com el MEI, les emissions amb efecte d'hivernacle o l'eficiència del mètode de regulació a l'EB. El mètode també inclou una proposta de modificació de l'escala tradicional de valoració clàssica de l'AHP.
Les metodologies proposades han estat validades de manera comparativa amb dues xarxes de distribució d'aigua (xarxes CAT i TF). Sobre les dues xarxes es van comparar tant els diferents mètodes proposats com la comparativa amb un plantejament clàssic del problema de disseny d'una EB. En resum, la tesi recull una metodologia estandarditzada per al disseny de qualsevol tipus d'EB (per a aigua potable, per a reg etc.) considerant la configuració de bombament més adequada, fent ús d'una variabilitat de la demanda, i considerant diferents tipus de criteris (tècnics, econòmics i ambientals) mitjançant una anàlisi multicriteri de presa de decisions. / [EN] Energy consumption of a pumping station (PS) represents the largest energy consumption of a water distribution system. Additionally, other problems such as climate change, water stress and greenhouse gas emissions lead to the need to optimize this type of facilities, both in their design and operation.
This doctoral thesis consists of three stages of development. The first stage develops a methodology to optimize the operation of the PS. The second stage develops a pumping station design method considering technical and economic aspects based on the AHP (Analytic Hierarchy Process) method. Finally, the third stage is an improvement of the second stage by adding environmental aspects and demand variability consideration.
One of the main contributions is the development of a methodology for the optimization of the operation of a PS. This methodology is based on the use of the set point curve and an operation combining fixed speed pumps (FSP) and variable speed pumps (VSP). The objective of this method is to determine the optimum number of FSP and VSP at any given flow rate while minimizing the total energy consumption of the PS. This methodology corrects the VSP efficiency determined by the similarity laws and includes a mathematical formulation of the variable frequency drive efficiency.
Conventional PS design is based on the minimization of the life cycle cost (LCC); the sum of investment, operation and maintenance costs. The second stage of the thesis develops an integral method of PS design considering technical and economic aspects by applying the AHP method. The proposed methodology consists of three phases. The first phase one is related to the definition of the required data of the PS and allows defining the feasible models for the network. The second is related to the definition of the possible solutions and their evaluation with technical and economic criteria. The third phase is related to the calculation of the Pareto front of the set of solutions obtained and the application of the AHP method.
The methodology developed in the second stage of the thesis has four limitations. The first one is not considering environmental criteria in the design of the PS. The second is not considering the optimization of the operation of a PS defined in the first stage of the thesis. The third is related to the scale used in the AHP method. The fourth is the consideration of a single consumption pattern in the pumping station. Therefore, in the third stage of the thesis, a new proposed methodology for the PS design is developed to solve these problems. This new method considers environmental criteria such as MEI, greenhouse emissions or the efficiency of the PS control method. The method also includes a proposed modification of the traditional AHP classical rating scale.
The proposed methodologies have been comparatively validated with two water distribution networks (CAT and TF networks). For both networks, both the different proposed methods and their comparison with a classical approach to the design problem of a PS were compared. In summary, the thesis presents a standardized methodology for the design of any type of PS (for drinking water, irrigation, etc.) considering the most appropriate pumping configuration, making use of demand variability, and considering different types of criteria (technical, economic and environmental) through a multi-criteria decision making analysis. / Briceño León, CX. (2023). Contributions to the design of pumping stations in water distribution networks considering technical, economic and environmental aspects [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/193080 / Compendio
|
7 |
Planteamiento de un proceso participativo para la propuesta y priorización de proyectos de desarrollo regional. Caso de estudio Departamento del Meta en ColombiaLeón Camargo, Astrid 18 October 2021 (has links)
[ES] La participación pública fue introducida como concepto por Naciones Unidas en la Declaración de Río sobre Medioambiente y Desarrollo en 1992. A partir de ahí se considera esencial que los interesados locales participen en los procesos de toma de decisiones relativas a políticas públicas de desarrollo local de su región, ya que se supone que los resultados de estas intervenciones han de dar respuesta a sus intereses y necesidades.
La selección de estos interesados clave es crítica para asegurar la viabilidad, legitimidad y el éxito del proceso participativo, ya que es esencial lograr resultados respaldados por un amplio consenso. Por el contrario, si falla la colaboración entre las autoridades y los interesados, se pierde la confianza de éstos y las probabilidades de fracaso de las propuestas llevadas a cabo son muy altas. Para la selección de los interesados hay que tener en cuenta: su motivación o interés en participar en el proceso, su conocimiento, preferencias, preocupaciones y expectativas sobre el problema y el proceso de toma de decisiones.
En esta tesis se desarrolla un proceso participativo, basado en un caso de estudio, en el que se selecciona un núcleo decisor que ayude a las autoridades competentes a decidir cuáles son las áreas de inversión que más contribuyen a satisfacer los Objetivos de Desarrollo Sostenible (ODS). El caso de estudio se centra en el análisis y priorización de las necesidades de desarrollo de la Región del Meta (Colombia).
La investigación se realiza en tres fases. En la primera fase se plantea el problema, los objetivos y la metodología de investigación. En la segunda fase se desarrolla un proceso de selección y análisis de interesados para seleccionar un núcleo decisor. En la tercera fase se identifican y analizan las necesidades de la Región del Meta y se priorizan en función del grado de satisfacción de los ODS.
En el trabajo se introduce la técnica Decision Making Trial and Evaluation Laboratory (DEMATEL), adaptado de modo novedoso, para su uso en el análisis de grupos de interés; una nueva propuesta de análisis de influencia, basada en categorías (Ratings) y Análisis de Redes Sociales. Se presenta un análisis comparativo de los resultados obtenidos por los diferentes métodos de análisis de interesados, se discuten sus ventajas y desventajas y se selecciona el núcleo decisor.
Para priorizar las necesidades más sentidas de la Región, materializadas en trece áreas de inversión, se estudia cómo invertir en cada área satisface los Objetivos de Desarrollo Sostenible (ODS). Para ello se emplean dos técnicas de toma de decisiones multicriterio: El Proceso Analítico Jerárquico (AHP por sus siglas en inglés) y el Proceso Analítico en Red (ANP por sus siglas en inglés). El ANP estudia las dependencias y la retroalimentación entre los elementos de la red. Como la aplicación práctica de ANP resulta compleja, se ha integrado el ANP con DEMATEL, tal y como se describe en la literatura.
La metodología y los resultados de esta tesis se pueden reproducir en futuros procesos participativos porque ayuda a identificar interesados y seleccionar un grupo decisor, representativo de los actores de una región o área geográfica, y también a identificar y evaluar necesidades de desarrollo de la región objeto de estudio, teniendo en cuenta las opiniones de los interesados identificados. / [CA] La participació pública va ser introduïda com a concepte per Nacions Unides en la Declaració de Rio sobre Medi Ambient i Desenvolupament a 1992. A partir d'aquí es considera essencial que els interessats locals participin en els processos de presa de decisions relatives a polítiques públiques de desenvolupament local de la seva regió, ja que se suposa que els resultats d'aquestes intervencions han de donar resposta als seus interessos i necessitats.
La selecció d'aquests interessats clau és crítica per assegurar la viabilitat, legitimitat i l'èxit de l'procés participatiu, ja que és essencial aconseguir resultats recolzats per un ampli consens. Per contra, si falla la col·laboració entre les autoritats i els interessats, es perd la confiança d'aquests i les probabilitats de fracàs de les propostes dutes a terme són molt altes. Per a la selecció dels interessats cal tenir en compte: la seva motivació o interès en participar en el procés, el seu coneixement, preferències, preocupacions i expectatives sobre el problema i el procés de presa de decisions.
En aquesta tesi es desenvolupa un procés participatiu, basat en un cas d'estudi, en el qual es selecciona un nucli decisor que ajudi les autoritats competents a decidir quines són les àrees d'inversió que més contribueixen a satisfer els Objectius de Desenvolupament Sostenible (ODS ). El cas d'estudi se centra en l'anàlisi i priorització de les necessitats de desenvolupament de la Regió de l'Meta (Colòmbia).
La investigació es realitza en tres fases. En la primera fase es planteja el problema, els objectius i la metodologia d'investigació. En la segona fase es desenvolupa un procés de selecció i anàlisi d'interessats per a seleccionar un nucli decisor. A la tercera fase s'identifiquen i analitzen les necessitats de la Regió de l'Meta i es prioritzen en funció de el grau de satisfacció dels ODS.
En el treball s'introdueix la tècnica Decision Making Trial and Evaluation Laboratory (DEMATEL), adaptat de manera nova, per al seu ús en l'anàlisi de grups d'interès; una nova proposta d'anàlisi d'influència, basada en categories (ràtings) i Anàlisi de Xarxes Socials. Es presenta una anàlisi comparativa dels resultats obtinguts pels diferents mètodes d'anàlisi d'interessats, es discuteixen els avantatges i desavantatges i se selecciona el nucli decisori.
Per prioritzar les necessitats més sentides de la Regió, materialitzades en tretze àrees d'inversió, s'estudia com invertir en cada àrea satisfà els Objectius de Desenvolupament Sostenible (ODS). Per a això s'empren dues tècniques de presa de decisions multicriteri: El Procés Analític Jeràrquic (AHP per les sigles en anglès) i el Procés Analític en Xarxa (ANP per les sigles en anglès). L'ANP estudia les dependències i la retroalimentació entre els elements de la xarxa. Com l'aplicació pràctica de ANP resulta complexa, s'ha integrat el ANP amb DEMATEL, tal com es descriu a la literatura.
La metodologia i els resultats d'aquesta tesi es poden reproduir en futurs processos participatius perquè ajuda a identificar interessats i seleccionar un grup decisori, representatiu dels actors d'una regió o àrea geogràfica, i també a identificar i avaluar necessitats de desenvolupament de la regió objecte d'estudi, tenint en compte les opinions dels interessats identificats. / [EN] Public participation was introduced as a concept by the United Nations in the Rio Declaration on Environment and Development in 1992. Since then, it is considered essential for local stakeholders to participate in decision-making processes related to local development public policies in their region, since the results of these interventions are supposed to respond to their interests and needs.
The selection of these key stakeholders is critical to ensure the viability, legitimacy, and success of the participatory process, as it is essential to achieve results supported by a broad consensus. On the contrary, if collaboration between the authorities and stakeholders fails, the trust of the latter is lost and the probability of failure of the proposals carried out is very high. For the selection of stakeholders, it is necessary to take into account: their motivation or interest in participating in the process, their knowledge, preferences, concerns and expectations about the problem and the decision-making process.
This thesis develops a participatory process, based on a case study, in which a core decision-maker is selected to help the competent authorities decide which investment areas contribute most to meeting the Sustainable Development Goals (SDGs). The case study focuses on the analysis and prioritization of the development needs of the Meta Region (Colombia).
The research is conducted in three phases. In the first phase, the problem, objectives, and research methodology are set out. In the second phase, a stakeholder selection and analysis process is developed to select a core decision-maker. In the third phase, the needs of the Meta Region are identified and analyzed and prioritized according to the degree of satisfaction of the SDGs.
The paper introduces the Decision Making Trial and Evaluation Laboratory (DEMATEL) technique, adapted in a novel way, for use in stakeholder analysis; a new proposal for influence analysis, based on categories (ratings) and Social Network Analysis. A comparative analysis of the results obtained by the different stakeholder analysis methods is presented, their advantages and disadvantages are discussed, and the core decision maker is selected.
To prioritize the most felt needs of the Region, materialized in thirteen investment areas, it is studied how investing in each area satisfies the Sustainable Development Goals (SDGs). Two multi-criteria decision-making techniques are used: the Analytical Hierarchical Process (AHP) and the Analytical Network Process (ANP). The ANP studies the dependencies and feedback between network elements. As the practical application of ANP is complex, ANP has been integrated with DEMATEL, as described in the literature.
The methodology and results of this thesis can be replicated in future participatory processes because it helps to identify stakeholders and select a decision-making group, representative of the actors of a region or geographic area, and also to identify and evaluate development needs of the region under study, taking into account the opinions of the identified stakeholders. / León Camargo, A. (2021). Planteamiento de un proceso participativo para la propuesta y priorización de proyectos de desarrollo regional. Caso de estudio Departamento del Meta en Colombia [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/174853
|
8 |
Aplicación de las técnicas AHP, ANP-BC y ANP-BOCR de análisis multicriterio de decisiones a la selección de carteras de proyectos de mantenimiento, rehabilitación y mejora en infraestructuras ferroviariasMontesinos Valera, Jesús 02 November 2015 (has links)
[EN] The construction of railway infrastructure networks requires heavy investment, long planning and execution times and extended life cycles.
An important family of projects in Railway Engineering are the Maintenance, Renewal and Improvement (MR&I) projects. They are critical to maintaining railway infrastructures in good condition and to adapt them to environmental changes and new operating conditions and needs. MR&I action plans have a great impact in the short term because they affect the performance of operating facilities A critical issue for public infrastructure managers and planners is the effective allocation of the scarce resources available for maintenance and repair of railway infrastructures. Obsolescence and lack of adequate maintenance and repair of the railway network affect productivity and lead to increased costs over time.
Every year the Manager of a rail network area is faced with different MR&I needs. This involves different projects to be executed with different levels of urgency, different levels of investment and different improvement measures and action plans on the railway network. Therefore, the Manager has a portfolio of MR&I projects and a limited budget. The main problem that the manager faces is setting priorities among the projects to decide which ones will be executed first. It is a complex problem due to the number of different projects and criteria to be considered.
Classical approaches are based upon the Cost Benefit analysis (CBA) but there are great uncertainties and variations between the economic values used in different models and the results are heavily dependent on the specific methodology adopted. Methods based upon Multiple Criteria Decision Analysis (MCDA) allow mixing quantitative and qualitative criteria, aggregate multiple experts evaluations and, in general, obtain more robust project rankings than CBA. There is little evidence in the scientific literature of the use of MCDA to similar cases.
Research conducted in this thesis studies the decision-making process to choose MR&I projects in a railway network. Technicians and managers are given a methodological tool to help them establish a priority between all the projects in the MR&I portfolio. The problem is addressed as a Multi criteria decision making (MCDM) problem in which thee different ANP models have been used, comparing the results obtained with all of them: Analytic Hierarchical Process (AHP), Analytic Network Process with subnetworks for Benefits and Costs (ANP-BC) and the Analytic Network Process with subnetworks for Costs, Benefits, Opportunities and Risks (ANP-BOCR)
The main contributions of this works are:
- Deep analysis of the decision criteria.
- Design of a procedure for evaluating many different alternative projects.
- A decision making process which is both systematic and strict has been obtained. It can be generalized to other areas of the railway infrastructure management company.
Thanks to the results the budget can be used in the best-valued projects according to the criteria established by the decision maker. The priorization is then obtained in a transparent and documented way. / [ES] La construcción de infraestructuras ferroviarias requiere de grandes inversiones, largos plazos de planificación y ejecución y los ciclos de vida totales son muy largos también.
Dentro de los proyectos que se realizan en este tipo de infraestructuras, una parte muy importante son las actuaciones sobre líneas en servicio, que se denominan actuaciones de mantenimiento, rehabilitación y mejora (MR&I por sus siglas en ingles de Maintenance, Renewal and Improvement). Las actuaciones de MR&I tienen un gran efecto a corto plazo al afectar al rendimiento de instalaciones que ya están en servicio en el momento de la actuación . La asignación eficaz de los escasos recursos disponibles para MR&I por parte de los gestores de infraestructuras es clave para mantener y mejorar el desempeño general de la red.
Cada año el gestor de una zona de la red se enfrenta a diferentes necesidades de mantenimiento, rehabilitación y mejora de la red, por tanto, tiene conjunto muy grande de proyectos de MR&I y un presupuesto limitado para ejecutarlos. El problema que se plantea es seleccionar qué proyectos tienen prioridad a la hora de su ejecución y qué criterios ha de considerar para establecer esa prioridad. Es un problema complejo debido al amplio número de proyectos posibles y de criterios a considerar.
Los métodos clásicos más utilizados se basan en el enfoque de análisis coste-beneficio, pero existen grandes variaciones e incertidumbres a la hora de obtener los valores económicos y los resultados del análisis dependen mucho de la metodología específica adoptada. Los métodos basados en el Análisis Multicriterio de Decisiones (Multiple Criteria Decision Analysis MCDA) permitan integrar valoraciones cuantitativas y cualitativas, agregar las preferencias de varios expertos y, en general, obtener ordenaciones de proyectos más robustas que el CBA. No existe apenas evidencia de la aplicación de MCDA al problema planteado en la literatura científica.
La investigación presentada en esta tesis estudia el proceso de toma de decisiones para la selección de proyectos de MR&I en una red ferroviaria. Se dota a los técnicos responsables y a los gestores del mantenimiento de los administradores ferroviarios de una herramienta metodológica que les ayude a establecer una prioridad entre la cartera de proyectos de MR&I. El problema se afronta como una toma de decisión multicriterio (MCDM) en la que se han utilizado tres modelos del método ANP, comparando los resultados entre sí: el modelo jerárquico basado en el Proceso Analítico Jerárquico (AHP) , el proceso analítico en red con una subred de costes y otra de beneficios (ANP-BC) y el proceso analítico en red con cuatro subredes: beneficios, oportunidades, costes y riesgos (ANP-BOCR).
Las principales contribuciones de este trabajo son:
- El profundo análisis realizado sobre los criterios de decisión.
- Se ha diseñado un procedimiento para evaluar un conjunto muy numeroso de actuaciones alternativas.
- Se ha obtenido un proceso de toma de decisiones riguroso y sistemático que se puede generalizar para otras zonas de gestión de la Compañía Gestora de las Infraestructuras ferroviarias
El resultado permite utilizar el presupuesto en los proyectos mejor valorados de acuerdo a los criterios establecidos por el decisor. Obteniéndose la priorización de forma transparente y documentada. / [CA] La construcció d'infraestructures ferroviàries requereix de grans inversions, llargs terminis de planificació i execució i els cicles de vida totals són molt llargs també.
Dins dels projectes que es realitzen en aquest tipus d'infraestructures, una part molt important són les actuacions sobre línies en servei, que es denominen actuacions de manteniment, rehabilitació i millora (MR&I per les seues sigles en angles de Maintenance, Renewal and Improvement). Les actuacions de MR&I tenen un gran efecte a curt termini en afectar al rendiment d'instal·lacions que ja estan en servei en el moment de l'actuació . L'assignació eficaç dels escassos recursos disponibles per a MR&I per part dels gestors d'infraestructures és clau per a mantenir i millorar l'acompliment general de la xarxa.
Cada any el gestor d'una zona de la xarxa s'enfronta a diferents necessitats de manteniment, rehabilitació i millora de la xarxa, per tant, té un conjunt molt gran de projectes de MR&I i un pressupost limitat per a executar-los. El problema que es planteja és seleccionar quins projectes tenen prioritat a l'hora de la seua execució i quins criteris ha de considerar per a establir aqueixa prioritat. És un problema complex a causa de l'ampli nombre de projectes possibles i de criteris a considerar.
Els mètodes clàssics més utilitzats es basen en l'enfocament d'anàlisi cost-beneficie, però existeixen grans variacions i incerteses a l'hora d'obtenir els valors econòmics i els resultats de l'anàlisi depenen molt de la metodologia específica adoptada. Els mètodes basats en l'Anàlisi Multicriteri de Decisions (Multiple Criteria Decision Analysis MCDA) permeten integrar valoracions quantitatives i qualitatives, agregar les preferències de diversos experts i, en general, obtenir ordenacions de projectes més robustes que el CBA. No existeix apenes evidencia de l'aplicació de *MCDA al problema plantejat en la literatura científica.
La recerca presentada en aquesta tesi estudia el procés de presa de decisions per a la selecció de projectes de MR&I en una xarxa ferroviària. Es dota als tècnics responsables i als gestors del manteniment dels administradors ferroviaris d'una eina metodològica que els ajude a establir una prioritat entre la cartera de projectes de MR&I. El problema s'afronta com una presa de decisió multicriteri (MCDM) en la qual s'han utilitzat tres models del mètode ANP, comparant els resultats entre si: el model jeràrquic basat en el Procés Analític Jeràrquic (AHP) , el procés analític en xarxa amb una subxarxa de costos i una altra de beneficis (ANP-BC), i el procés analític en xarxa amb quatre subxarxes: beneficis, oportunitats, costos i riscos (ANP-BOCR).
Les principals contribucions d'aquest treball són:
- La profunda anàlisi realitzada sobre els criteris de decisió.
- S'ha dissenyat un procediment per a avaluar un conjunt molt nombrós d'actuacions alternatives.
- S'ha obtingut un procés de presa de decisions rigorós i sistemàtic que es pot generalitzar per a altres zones de gestió de la Companyia Gestora de les Infraestructures ferroviàries
El resultat permet utilitzar el pressupost en els projectes millor valorats d'acord als criteris establits pel decisor. Obtenint-se la priorització de forma transparent i documentada. / Montesinos Valera, J. (2015). Aplicación de las técnicas AHP, ANP-BC y ANP-BOCR de análisis multicriterio de decisiones a la selección de carteras de proyectos de mantenimiento, rehabilitación y mejora en infraestructuras ferroviarias [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/56821
|
9 |
Diseño y validación de una metodología de gestión para emprendimientos asociativos basada en la Técnica de Decisión Multicriterio AHPGuananga Quishpe, Luis Armando 27 April 2024 (has links)
[ES] En Ecuador, los emprendimientos productivos asociativos vinculados a la economía social y solidaria han aumentado en número en los últimos años, mostrando una importante oportunidad laboral para pequeños productores y personas excluidas del mercado de trabajo formal.
Este tipo de iniciativas de la economía social tradicional, como cooperativas y asociaciones, surgen principalmente como respuesta a la falta de trabajo y actúan en el mercado con una débil capacidad de gestión empresarial, lo que pone en riesgo su sostenibilidad organizacional, generando además una divergencia de criterios de desempeño organizacional bajo dimensiones sociales y empresariales que son debatidas en la literatura existente.
El objetivo de esta tesis es desarrollar una metodología de gestión para empresas asociativas de economía social y solidaria, bajo una técnica de decisión multicriterio que priorice y sistematice criterios sociales y empresariales para promover la sostenibilidad organizativa de estas iniciativas.
La revisión bibliográfica reveló la importancia del paradigma de la gestión estratégica participativa, los sistemas de medición del desempeño y las técnicas de decisión multicriterio en la gestión empresarial, lo cual, sumados a los factores de éxito en emprendimientos asociativos de economía social publicados en importantes investigaciones, brindaron suficiente sustento teórico para el diseño de la propuesta metodológica.
La propuesta se diseñó a partir de la combinación de la metodología de gestión Balanced Scorecard (BSC), que proporciona una estructura sistémica hacia el logro de la visión organizacional, y la técnica de decisión multicriterio Analytic Hierarchy Process (AHP), permitió definir y priorizar indicadores de gestión según factores de éxito, bajo análisis de contenido y criterio experto.
Los resultados muestran el valor representativo de la perspectiva social y de aprendizaje en la gestión de emprendimientos asociativos, donde los indicadores de gestión de integración laboral, liderazgo participativo y capacitación técnica se presentan como los principales impulsores para mejorar la situación productiva, comercial y financiera, que sistémicamente lograron mejorar las condiciones de sostenibilidad organizacional.
La aplicación y validación de la propuesta metodológica ratifica la factibilidad de integrar criterios sociales y empresariales en la gestión de emprendimientos sociales, donde se prioriza la perspectiva social y de aprendizaje para incidir en la eficiencia productiva, la expansión comercial y la disponibilidad de recursos financieros, generando valor económico y social que impulsa la sostenibilidad organizacional de estos emprendimientos.
En conclusión, se puede señalar que la priorización e integración de indicadores de gestión empresarial y social bajo criterios sociales y empresariales impulsaría la sostenibilidad organizativa de los emprendimientos asociativos, donde la perspectiva social sería el principio y fin de este tipo de empresas, ya que estas iniciativas surgen y se sostienen principalmente por el valor social que pueden aportar a sus asociados, que es el de generar trabajo digno e inclusivo.
La novedosa y útil combinación metodológica BSC-AHP con criterios sociales y empresariales, que revela el estudio, brinda la oportunidad de diseñar nuevos modelos y metodologías de gestión para proyectos o emprendimientos sostenibles, donde la importancia que el estudio otorga a la perspectiva social abre la oportunidad de generar nuevos estudios sobre gestión social en emprendimientos o proyectos sostenibles, y también invita a definir indicadores de sostenibilidad organizacional en diferentes sectores económicos. / [CA] A l'Equador, les emprenedories productives associatives vinculats a l'economia social i solidària han augmentat en número en els últims anys, mostrant una important oportunitat laboral per a xicotets productors i persones excloses del mercat de treball formal.
Aquest tipus d'iniciatives de l'economia social tradicional, com a cooperatives i associacions, sorgeixen principalment com a resposta a la falta de treball i actuen en el mercat amb una feble capacitat de gestió empresarial, la qual cosa posa en risc la seua sostenibilitat organitzacional, generant a més una divergència de criteris d'acompliment organitzacional sota dimensions socials i empresarials que són debatudes en la literatura existent.
L'objectiu d'aquesta tesi és desenvolupar una metodologia de gestió per a empreses associatives d'economia social i solidària, sota una tècnica de decisió multicriteri que prioritze i sistematitze criteris socials i empresarials per a promoure la sostenibilitat organitzativa d'aquestes iniciatives.
La revisió bibliogràfica va revelar la importància del paradigma de la gestió estratègica participativa, els sistemes de mesurament de l'acompliment i les tècniques de decisió multicriteri en la gestió empresarial, la qual cosa, sumats als factors d'èxit en emprenedories associatives d'economia social publicats en importants investigacions, van brindar suficient manteniment teòric per al disseny de la proposta metodològica.
La proposta es va dissenyar a partir de la combinació de la metodologia de gestió *Balanced *Scorecard (*BSC), que proporciona una estructura sistèmica cap a l'assoliment de la visió organitzacional, i la tècnica de decisió multicriteri *Analytic *Hierarchy *Process (*AHP), va permetre definir i prioritzar indicadors de gestió segons factors d'èxit, sota anàlisi de contingut i criteri expert.
Els resultats mostren el valor representatiu de la perspectiva social i d'aprenentatge en la gestió d'emprenedories associatives, on els indicadors de gestió d'integració laboral, lideratge participatiu i capacitació tècnica es presenten com els principals impulsors per a millorar la situació productiva, comercial i financera, que sistèmicament van aconseguir millorar les condicions de sostenibilitat organitzacional.
L'aplicació i validació de la proposta metodològica ratifica la factibilitat d'integrar criteris socials i empresarials en la gestió d'emprenedories socials, on es prioritza la perspectiva social i d'aprenentatge per a incidir en l'eficiència productiva, l'expansió comercial i la disponibilitat de recursos financers, generant valor econòmic i social que impulsa la sostenibilitat organitzacional d'aquestes emprenedories.
En conclusió, es pot assenyalar que la priorització i integració d'indicadors de gestió empresarial i social sota criteris socials i empresarials impulsaria la sostenibilitat organitzativa de les emprenedories associatives, on la perspectiva social seria el principi i fi d'aquest tipus d'empreses, ja que aquestes iniciatives sorgeixen i se sostenen principalment pel valor social que poden aportar als seus associats, que és el de generar treball digne i inclusiu.
La nova i útil combinació metodològica *BSC-*AHP amb criteris socials i empresarials, que revela l'estudi, brinda l'oportunitat de dissenyar nous models i metodologies de gestió per a projectes o emprenedories sostenibles, on la importància que l'estudi atorga a la perspectiva social obri l'oportunitat de generar nous estudis sobre gestió social en emprenedories o projectes sostenibles, i també convida a definir indicadors de sostenibilitat organitzacional en diferents sectors econòmics. / [EN] In Ecuador, associative productive enterprises linked to the social and solidarity economy have increased in number in recent years, showing an important labour opportunity for small producers and people excluded from the formal labour market.
Initiatives of this kind in the traditional social economy, such as cooperatives and associations, arise mainly as a response to the lack of work and act in the market with a weak business management capacity, which puts their organisational sustainability at risk, also generating a divergence of organisational performance criteria under social and business dimensions that are debated in the existing literature.
The aim of this thesis is to develop a management methodology for associative enterprises of social and solidarity economy, under a multi-criteria decision technique that prioritises and systematises social and business criteria to promote the organisational sustainability of these enterprises.
The bibliographic review revealed the importance of the paradigm of participatory strategic management, performance measurement systems and multi-criteria decision techniques in business management, which, added to the success factors in associative ventures in social economy published in important research, provided sufficient theoretical support for the design of the methodological proposal.
The proposal was designed from the combination of the Balanced Scorecard (BSC) management methodology, which provides a systemic structure towards the achievement of the organisational vision, and the multi-criteria decision technique, Analytic Hierarchy Process (AHP), which allowed management indicators to be defined and prioritised according to success factors, under content analysis and expert criteria.
The results show the representative value of the social and learning perspective in the management of associative enterprises, where management indicators of labour integration, participative leadership and technical training are presented as the main drivers to improve the productive, commercial and financial situation, which systemically managed improve the conditions of organisational sustainability.
The application and validation of the methodological proposal ratifies the feasibility of integrating social and business criteria in the management of social ventures, where the social and learning perspective is prioritised to influence productive efficiency, commercial expansion and availability of financial resources, generating economic and social value that drives the organisational sustainability of these enterprises.
In conclusion, it can be noted that the prioritization and integration of business and social management indicators under social and business criteria would boost the organizational sustainability of associative ventures, where the social perspective would be the beginning and end of this type of enterprises, since these initiatives arise and are sustained mainly by the social value they can provide to their associates, which is mainly to generate decent and inclusive work.
The novel and useful BSC-AHP methodological combination with social and business criteria, which the study reveals, provides the opportunity to design new management models and methodologies for sustainable projects or ventures, where the importance that the study gives to the social perspective opens up the opportunity to generate new studies on social management in sustainable ventures or projects, and also invites the definition of organisational sustainability indicators in different economic sectors. / Guananga Quishpe, LA. (2024). Diseño y validación de una metodología de gestión para emprendimientos asociativos basada en la Técnica de Decisión Multicriterio AHP [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/203891
|
10 |
Optimización de la localización de hidrantes multiusuario y trazado de redes de riego a presión mediante la utilización de SIG.González Pavón, César 25 April 2023 (has links)
[ES] Un aprovechamiento racional y ajustado de los recursos hídricos disponibles en el regadío implica la necesidad de disponer de infraestructuras que mediante conducciones a presión permitan llevar desde captación hasta la planta los volúmenes requeridos. Los sistemas de riego a presión, tanto a nivel colectivo como en parcela, permiten un alto control sobre el agua aplicada y garantizan una alta eficiencia de aplicación. La adopción de estos sistemas de riego ha llevado en los últimos 30 años a la construcción y puesta en marcha de numerosas redes colectivas de riego a presión. En el marco mediterráneo donde el modelo productivo se basa en una agricultura intensiva de parcelas de tamaño pequeño y medio (superficies medias no superiores a 0,5 ha), el sistema de distribución del agua desde la red a la parcela se realiza normalmente a través de hidrantes denominados multiusuario.
La localización y capacidad hidráulica de estos elementos es un tema poco estudiado hasta la fecha. Tradicionalmente su localización y definición de los elementos que lo componen ha corrido a cargo de la propia experiencia en estos campos de los ingenieros, desconociendo en muchos casos como afectan estos parámetros al funcionamiento final de la instalación y a los costes que supone dicha inversión. Esta Tesis aborda el estudio de estos aspectos con el objetivo de obtener una metodología de cálculo basada en la utilización de los SIG que optimice tanto la ubicación de los hidrantes como el trazado de conducciones entre los mismos desde el punto de alimentación.
Como punto de partida, se definió la capacidad hidráulica de los mismos en cuanto a caudal y número de tomas que pueden abastecer, dando unas recomendaciones basadas en estudios hidráulicos de las características finales que deben tener los mismos en cada caso y de las tomas individuales a parcela. Seguidamente, se abordó la problemática de la localización, relacionada directamente con el anterior punto. En este caso, mediante la utilización de distintas herramientas de geoprocesos que ofrecen los softwares basados en SIG, se obtuvieron las localizaciones que minimizan tanto los costes energéticos como los de inversión.
Finalmente, obtenida la ubicación, se estableció el trazado de las conducciones desde la toma hasta cada uno de los hidrantes. En este caso, los criterios a tener en cuenta fueron función del tipo de vía por el que se pretenden trazar (camino rural, carretera, cauce, etc) llevándose a cabo mediante la elaboración de un mapa ráster de resistencias donde la solución óptima fue aquella que menos resistencia acumulada ofrecía. Para su elaboración se requirió del apoyo de metodologías de análisis Multicriterio como AHP.
Toda la metodología de trabajo fue aplicada sobre doce casos de estudio reales y se comparará con el diseño de ingenieros proyectistas especialistas en el campo de la modernización de regadíos.
Los resultados obtenidos mediante el uso de la metodología planteada arrojaron unos ahorros en los costes totales de hasta el 15 % respecto al dimensionado externo. En todos ellos se obtuvo la misma tendencia, pese a obtener mayor número de hidrantes multiusuario, se redujeron los costes totales de instalación de la red.
Como conclusión puede decirse que la metodología aportada redujo considerablemente los costes y planteó unos criterios objetivos a la hora del diseño y dimensionado de las redes. De este modo se redujo la subjetividad aportada por el proyectista. / [CA] Un aprofitament racional i ajustat dels recursos hídrics disponibles en el regadiu implica la necessitat de disposar d'infraestructures que mitjançant conduccions a pressió permeten portar des de captació fins a la planta els volums requerits. Els sistemes de reg a pressió, tant a nivell col·lectiu com en parcel·la, permeten un alt control sobre l'aigua aplicada i garanteixen una alta eficiència d'aplicació. L'adopció d'aquests sistemes de reg ha portat en els últims 30 anys la construcció i posada en marxa de nombroses xarxes col·lectives de reg a pressió. En el marc mediterrani on el model productiu es basa en una agricultura intensiva de parcel·les de grandària petita i mitjana (superfícies mitjanes no superiors a 0,5 ha), el sistema de distribució de l'aigua des de la xarxa a la parcel·la es realitza normalment a través d'hidrants denominats multiusuari.
La localització i capacitat hidràulica d'aquests elements és un tema poc estudiat fins hui. Tradicionalment la seua localització i definició dels elements que ho componen ha sigut a càrrec de la pròpia experiència en aquests camps dels enginyers, desconeixent en molts casos com afecten aquests paràmetres al funcionament final de la instal·lació i als costos que suposa aquesta inversió. Aquesta Tesi aborda l'estudi d'aquests aspectes amb l'objectiu d'obtindre una metodologia de càlcul basada en la utilització dels SIG que optimitze tant la ubicació dels hidrants com el traçat de conduccions entre els mateixos des del punt d'alimentació.
Com a punt de partida, es va definir la capacitat hidràulica dels mateixos quant a cabal i nombre de tomes que poden proveir, donant unes recomanacions basades en estudis hidràulics de les característiques finals que han de tindre els mateixos en cada cas i de les preses individuals a parcel·la. Seguidament, es va abordar la problemàtica de la localització, relacionada directament amb l'anterior punt. En aquest cas, mitjançant la utilització de diferents eines de geoprocesos que ofereixen els softwares basats en SIG, es van obtindre les localitzacions que minimitzen tant els costos energètics com els d'inversió.
Finalment, obtinguda la ubicació, es va establir el traçat de les conduccions des de la presa fins cadascun dels hidrants. En aquest cas, els criteris a tindre en compte van ser funció del tipus de via pel qual es pretenen traçar (camí rural, carretera, llit, etc) duent-se a terme mitjançant l'elaboració d'un mapa ráster de resistències on la solució òptima va ser aquella que menys resistència acumulada oferia. Per a la seua elaboració es va requerir del suport de metodologies d'anàlisi Multicriteri com AHP.
Tota la metodologia de treball va ser aplicada sobre dotze casos d'estudi reals i va comparar amb el disseny d'enginyers projectistes especialistes en el camp de la modernització de regadius.
Els resultats obtinguts mitjançant l'ús de la metodologia plantejada van llançar uns estalvis en els costos totals de fins al 15% respecte al dimensionament extern. En tots ells es va obtindre la mateixa tendència, malgrat obtindre major nombre d'hidrants multiusuari, es van reduir els costos totals d'instal·lació de la xarxa.
Com a conclusió pot dir-se que la metodologia aportada va reduir considerablement els costos i va plantejar uns criteris objectius a l'hora del disseny i dimensionament de les xarxes. D'aquesta manera es va reduir la subjectivitat aportada pel projectista. / [EN] Rational and adjusted use of the water resources available in irrigation implies the need to have infrastructures that, by means of pressure pipes, can carry out the required volumes from the catchment to the plant. Pressurized irrigation systems, both at the collective level and on the plot, allow high control over the water applied and guarantee high application efficiency. The adoption of these irrigation systems has led in the last 30 years to the construction and start-up of numerous collective pressurized irrigation networks. In the Mediterranean framework, where the production model is based on intensive agriculture of small and medium-sized plots (average surfaces not exceeding 0.5 ha), the water distribution system from the network to the plot is normally carried out through of -called multi-user hydrants.
The location and hydraulic capacity of these elements is a subject little studied to date. Traditionally, its location and definition of the elements that compose it have been carried out by the engineers' own experience in these fields, in many cases unaware of how these parameters affect the final operation of the installation and the costs involved in said investment. This thesis deals with the study of these aspects to obtain a calculation methodology based on the use of GIS that optimizes both the location of the hydrants and the layout of the pipes between them from the point of supply.
As a starting point, their hydraulic capacity was defined in terms of flow rate and number of intakes they can supply, giving recommendations based on hydraulic studies of the final characteristics that they should have in each case and of the individual intakes on a plot. Next, the problem of location, directly related to the previous point, was addressed. In this case, by using different geoprocessing tools offered by GIS-based software, locations that minimize both energy and investment costs were obtained.
Finally, once the location was obtained, the layout of the pipes from the intake to each of the hydrants was established. In this case, the criteria to be taken into account were a function of the type of road along which it is intended to be traced (rural road, highway, riverbed, etc.) carried out by preparing a raster map of resistances where the optimal solution was that that offered less accumulated resistance. For its elaboration, the support of Multicriteria analysis methodologies such as AHP was required.
The entire work methodology was applied to twelve real case studies and will be compared with the design of specialist project engineers in the field of irrigation modernization.
The results obtained through the use of the proposed methodology showed savings in total costs of up to 15% compared to external dimensioning. The same trend was obtained in all of them, despite obtaining a greater number of multi-user hydrants, the total costs of installing the network were reduced.
In conclusion, it can be said that the methodology provided considerably reduced costs and proposed objective criteria when designing and sizing the networks. In this way, the subjectivity provided by the designer was reduced. / González Pavón, C. (2023). Optimización de la localización de hidrantes multiusuario y trazado de redes de riego a presión mediante la utilización de SIG [Tesis doctoral]. Universitat Politècnica de València. https://doi.org/10.4995/Thesis/10251/192926
|
Page generated in 0.1335 seconds