• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • Tagged with
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Optimering av produktionsflöden för ett byggnadsprojekt / Optimization of production flows for a construction project

Lind, Kristoffer, Gleimar, Daniel January 2015 (has links)
I produktionen för ett byggnadsprojekt krävs ett optimalt produktionsflöde för att uppnå bästa ekonomiska och kvalitetsmässiga resultat. Dock uppstår problem i produktionen som leder till ett försämrat produktionsflöde som resulterar i kostnadsökningar och en förlängd byggtid. Målet med detta arbete var att identifiera de problem som uppstår i produktionen för att sedan utvärdera och analysera möjliga åtgärdsförslag på dessa problem. Arbetet har genomförts på uppdrag av företaget X där undersökningar har utförts vid deras projekt Y, som också ligger till grund för resultatet.  Genom insamlad information från intervjuer, litteraturstudier och en enkätundersökning har problem och möjliga åtgärder identifierats. Det har arbetats fram åtta åtgärdsförslag som har analyserats och utvärderats med hänsyn till den insamlade informationen. Fyra av åtgärdsförslagen har ytterligare analyserats och utvärderats på ett djupgående sätt genom kostnadsberäkningar, för att utvärdera den ekonomiska lönsamheten för dessa.   Resultatet av examensarbetet visar att flera av de åtgärdsförslag som utvärderats medför ett positivt resultat, där arbeten utanför ordinarie arbetstid medför den största kostnadsbesparingen. Det framgår även att uppförande av extra antal bygghissar inte medför ett lönsamt resultat. Slutsatsen av arbetet är att de bäst lämpade åtgärdsförslagen bör vara införande av överlappstider vid raster, för att undvika väntetider på bygghissar och inbärning av material utanför ordinarie arbetstid, för att reducera spilltiden under den ordinarie arbetstiden.  Dessa förslag går att införa med små åtgärder till skillnad från införande av arbete utanför ordinarie arbetstid som kräver en större åtgärd. En rekommendation till företaget är att vidare analysera de åtgärdsförslag som det inte genomförts kostnadsberäkningar för. Utifrån en analys av dessa åtgärdsförslag bör det kunna konstateras att fler detaljerade arbetsberedningar, en ökad mängd erfarenhetsåterföringar och deltagande av underentreprenörer och lagbasar vid ett tidigare skede i projektet kan bidra till ytterligare förbättringar av produktionsflödet. / In the production of a construction project an optimal production flow is required in order to achieve the best economic and quality results. However, problems arise in the production which leads to a decreased production flow that causes increased costs and an extended construction period. The purpose of this work was to identify the problems that occur in the production to then evaluate and analyze possible proposals to solve these issues. The work was commissioned by company X where investigations have been carried out at their project Y, which also forms the basis of the results. Through information gathered from interviews, literature studies and a survey have problems and possible measures been identified. It has been developed eight proposals for action which have been analyzed and evaluated with regard to the gathered information. Four of the proposed measures have been further analyzed and evaluated in a profound way by cost estimates, to evaluate the economic profit of these proposals. The results of the thesis show that several of the proposed measures that have been evaluated results in a positive outcome, where work outside normal working hours provided the greatest cost savings. It is also clear that insertion of additional number of building elevators do not entail a profitable result. The conclusion drawn is that the best suited proposals for action should be the introduction of overlapping times during breaks, to avoid waiting times for the building elevators and transportation of materials outside normal working hours, in order to minimize interruption times during regular working hours. These proposals can be introduced with small resources in contrast to the introduction of work outside normal working hours that demands a greater measure. A recommendation for the company is to further analyze the proposed measures that have not been calculated with regards to cost estimates. Based on an analysis of these proposals it should be concluded that more detailed work preparations, an increased amount of experience reversals and participation of the subcontractors and foremen at an earlier stage in the project can contribute to further improvements in production flows.
2

Effektivisering av produktionsflöden inom livsmedelsbranschen : En studie om utmaningar & möjligheter med digital tvilling / Streamlining Production Flows in the Food Industry : A study on challenges & opportunities with Digital Twin

Larsson, Erik, Ringdahl, Anna January 2023 (has links)
En ökad effektivitet i de interna flödena är en viktig faktor för att bibehålla konkurrenskraft inom livsmedelsindustrin. Ny teknik som digitala tvillingar kan därför vara en möjlighet till att identifiera och åtgärda begränsande faktorer i produktflödet. Syftet med denna studie var att bidra till ökad förståelse för vilka möjligheter och utmaningar som kan uppstå vid tillämpningen av digital tvilling för att effektivisera flödesprocesser. För att samla in relevant empirisk data genomfördes två semistrukturerade intervjuer, en observation samt dokumentstudier.  Studiens resultat visar att den digitala tvillingen användes för datadrivna simuleringar med hjälp av realtidsdata som producerats av RFID-teknik. Simuleringarna gav möjligheten att förebygga fel som annars hade uppstått i flödet som därmed även sänkte både kostnader och tiden som krävdes vid flödesförändringen. Den digitala tvillingen i kombination med VR gav även möjlighet till visualisering av den digitala tvillingen och är en möjlighet till att engagera medarbetare i förändringar. Det fanns även potential att använda den digitala tvillingen tillsammans med VR för utbildning vilket kan leda till minskade kostnader och fel i det verkliga flödet. Utmaningar som identifierades i studien var att kostnaden för skapandet och underhållet av den digitala tvillingen och att den skapades i rätt tid i projektet för att kunna utnyttja dess potential maximalt. / Increased efficiency in internal flows is an important factor in maintaining competitiveness within the food industry. New technologies such as digital twins can therefore provide an opportunity to identify and address limiting factors in the product flow. The purpose of this study was to contribute to a better understanding of the opportunities and challenges that may arise form the application of digital twins to streamline flow processes. To collect relevant empirical data two semi-structured interviews, an observation and document studies were conducted. The results of the study show that the digital twin was used for data-driven simulations using real-time data produced by RFID technology. The simulations provided the opportunity to prevent errors that would otherwise have occurred in the flow, thus reducing both costs and the time required for flow changes. The digital twin, in combination with virtual reality (VR), also allowed for visualization of the digital twin and provided an opportunity to engage employees in the changes. There was also potential to use the digital twin together with VR for training, which could lead to reduced costs and errors in the actual flow. Challenges identified in the study included the cost of creating and maintaining the digital twin, as well as ensuring that it was created at the right time in the project to fully exploit its potential.

Page generated in 0.282 seconds