• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 329
  • 199
  • 91
  • 52
  • 45
  • 23
  • 22
  • 19
  • 18
  • 16
  • 16
  • 12
  • 12
  • 10
  • 9
  • Tagged with
  • 978
  • 978
  • 438
  • 256
  • 228
  • 216
  • 177
  • 137
  • 131
  • 124
  • 103
  • 95
  • 90
  • 86
  • 74
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
211

Evaluation of the public-private partnership in the Lekgalameetse Nature Reserve : Maruleng Municipality in the Limpopo Province

Mashale, Modise Christopher January 2014 (has links)
Thesis (M. Dev.) -- University of Limpopo, 2014 / The aim of the study was to examine the public private partnership in Lekgalammetse Nature Reserve, which was championed by the Limpopo Tourism Agency under the banner of Limpopo Economic Development Environment and Tourism Department after the protected land was placed under restitution process. The purpose of the study was to evaluate whether the partnership which was created has the capacity to enhance the socio-economic development of the claimants and the adjacent communities in the area where the nature reserve is situated. Land restitution process in case of an area declared protected area by law; says that there will not be physical occupation by the claimants in terms of section 42 of the Land Restitution Act. Therefore the only way that the claimants can benefit from the land, is to become land owners and partner in terms of activities that take place in the protected area for social and economic benefits. A public private partnership was recognised as a potential vehicle for social, economical and environmental well being of both parties. However the developmental prospects of the partnership were unknown and overestimated. Views from the study as well as the literature review support the assertions that in this type of land claim, a public private partnership is the best way to go about developing the claimants and the adjacent communities. The review also highlighted the importance of a partnership in a protected area and its benefits, especially in developing the adjacent communities. Thus the role of the community in participating in their development and of the protected area was the main focus of this study. The study collected both qualitative and quantitative data using interviews and a questionnaire. The study concluded by providing recommendations to stakeholders of Lekgalameetse Nature Reserve on how to improve their partnership relations. Some of the recommendations proposed are to involve a private partner to enhance development in the area; there should be provided with a coordinated and proper management, develop a capacity building tool to improve the co-management function and create an environment where all partners are equal in the partnership. The correct implementation of the Performance Management System will serve as a means to enhance organizational efficiency, effectiveness and accountability in the use of resources in accelerating access to good quality services and a better life for all. A well balanced partnership has a potential to increase community benefits and maximize the conservation of the biodiversity of the area.
212

Public private partnership policy in Nigeria's infrastructure development landscape : a critical appraisal of the infrastructure Concession Regulatory Act

Abdulsalam, Mutait Mobolanle January 2014 (has links)
Nigeria is rich country in terms of natural resources, It has one of Africa's largest economy, having being endowed with massive natural, human, renewable and non-renewable resources. With a population of about 160 million people which creates a large market for goods and services, rich soil suitable for commercial agriculture, deposits of natural resources including crude-oil, natural-gas, tin, and rock-salt, and cash crops including cocoa, kola-nut, cotton, groundnut and timber, Nigeria has the potential of being one of the largest economy globally and the political hegemony in Africa.1 However, the country has not been able to achieve sustainable development as a result of the deplorable state of infrastructure. Nigeria is confronted with the problem of immense infrastructure deficit which adversely affect national income, cost of production and distribution of goods and services, reduces Foreign Direct Investment(FDI), and result in poverty, unemployment, frequent youth unrest and fall in the general living standards.2 The poor state of infrastructure assets in the country is traceable primarily to the neglect by government and poor maintenance during the transition period from military rule to civilian administration. In an attempt to recover from the infrastructure decay, privatization was commenced in the late 90s through to the 21st century. Yet, there was no commendable improvements as the quality of public services dropped continuously and most of the enterprises were eventually wounded up as a result of corruption, poor maintenance and lack of skilled expertise.3 Furthermore, as a result of budget deficit caused by contraction in fiscal space, and continuous increase in demand for public services which correlates with population growth and rural-urban migration, public financing cannot facilitate bridging of the infrastructure gap. Also, having realized the success of Public Private Partnership (PPP) in other climes, government adopted PPP in 2005 to aid transition of the state of national infrastructure through private involvement in infrastructure financing. Unfortunately, for well over one decade of adopting PPP, Nigeria has not witnessed any commendable changes in her infrastructure assets. The poor performance of PPP in country has been traced to several factors including corruption, lack of transparency, and undue political interference. Central to the factors is the problem of regulatory deficit.4 Consequently, this study will examine the Nigerian PPP legal and regulatory framework to ascertain the problems responsible for the inability of the infrastructure financing technique to facilitate sustainable development through successful infrastructure projects. / Dissertation (LLM)--University of Pretoria, 2014 / gm2015 / Centre for Human Rights / LLM / Unrestricted
213

World Bank Group Engagement in Public-Private Partnerships : Strengthening Sustainable Finance in International Investment Standards

Simamora, Andrew Sefufan January 2023 (has links)
The prioritisation of private funds in financing public infrastructures due to limited financial resources available through the public sector has raised concerns about the protection of human rights and environment considering that the main goal of corporations is to generate as much profit as possible. The presence of the World Bank Group in the mix is to strike a balance between these competing needs by introducing the concept of sustainable finance through technical assistance and the adoption of standards that are integrated with the concept to influence the behaviour of state and non-state actors in their investment practices, especially in the developing world. This study employs a legal doctrinal approach in providing a critical analysis on the authoritativeness of the instruments adopted by the World Bank Group based on the established doctrines to derive logical conclusions from primary and secondary sources. It enquires into the work of the World Bank Group to explain the potential acceptance of the concept of sustainable finance and its impacts in infrastructure development and international investment law. This study found that the interactions established in the arrangement of Public-Private Partnership (PPP) among all various actors in international law is the key to internalise the concept of sustainable finance since it could form a community of legal practice adhering to the same standards. Furthermore, the compatibility between the standards adopted by the World Bank Group and the provisions found in the traditional sources of international law on human rights and environment could improve state and non-state actors’ compliance with those existing norms.
214

Risk Allocation, Decision Rights, and Adaptive Lifecycle Project Management Practices in Public-Private Partnership Highway Contracts in Australia, the Philippines, and India

Nguyen, Anh Chi 22 June 2023 (has links)
Public-private partnerships (PPPs) are increasingly used to address pressing infrastructure demands. PPPs typically involve a long-term contract between governments and private firms for design, construction, operation, and maintenance of infrastructure where private finance is put at risk throughout the contract's duration. By bundling these key tasks in the hands of the private sector, PPPs are expected to address certain limitations of traditional delivery approaches by capitalizing on private sector expertise and capabilities. Yet, while studies have shown the feasibility of PPPs in many cases, key challenges such as asymmetric information, incentive misalignment, bounded rationality, high transaction costs, and contract incompleteness are greater in PPPs than in traditional projects. This is because PPPs involve numerous heterogeneous stakeholders and multiple discrete project phases spanning decades. These challenges interact and result in high uncertainty in PPPs. Thus, how to address uncertainties is crucial in designing and implementing a PPP contract. Using a deliberately sampled data set of 20 contemporary greenfield highway contracts in Australia, the Philippines, and India, three studies explore the current practices of three key areas in PPPs: risk allocation, decision rights allocation, and lifecycle project management. Together, these studies shed light on how contracting parties design contracts ex ante to address ex post uncertainty due to inevitable changes in circumstances and requirements. In the study of risk allocation, the results support the risk transfer tenet and risk allocation principle and criteria. For instance, most of the comprehensive set of the 35 key risks investigated were transferred to the private sector or shared; exogenous risks had more consistent allocation and were shared more than endogenous risks across the three countries. A high level of similarity in risk allocation within each country and across the countries was uncovered regardless of remarkably different characteristics at both project and country levels. The similarities among these countries may indicate common risk allocation practices across other comparable countries in the region, and it provides the basis for revisiting existing literature such as studies about the relationship between institutional strength and the extent of risk transfer. Several silent or indeterminate provisions were also identified, indicating areas for improving current contractual designs. Some shift of responsibilities to the private sector in tolled projects (typically longer contract duration) compared with government-paid ones (typically shorter) was observed across the countries. Some limited trends over time such as less silent or indeterminate provisions and more risks retained by the public sector in recent projects in the Philippines and India, respectively, were also observed. For the examination of decision rights allocation, the key finding was the dominant level of owner control in a comprehensive set of 10 key provisions in almost all contracts regardless of the country's level of development and the substantial number of risks transferred to the private sector. The observed owner control aligns with agency theory, and this finding is likely driven by governments' accountability concerns and risk aversion. The extensive level of owner control does not support the argument that interprets property rights theory as applied to PPPs as providing the private sector with more extensive decision rights given their significant role in the decades-long duration of a PPP project. Contracts in Australia were more rigid, having distinctive, rigorous, and more detailed requirements with more ex-ante effort required to specify numerous provisions. Some limited national trends include contractual design evolvement over time in some provisions in the Philippines and India. The identified silent provisions indicate areas for improvement. For the lifecycle project management inquiry, the practices explored specify project structure, requirements, processes, and procedures that function as key elements of measurement- and process-based management throughout a project's contract period. Implementing these elements can trigger corresponding governance mechanisms to promote contractual and relational governance. Contracts in Australia tend to be more comprehensive in many areas requiring more ex ante contracting efforts such as naming contractors in contracts and ex post implementation efforts to comply with many distinctive requirements such as those concerning environmental and community/user management. Meanwhile, contracts in Australia likely rely more on trust-based management versus monitoring/control-based management, having limited requirements for monitoring and safeguarding the contract. Together, these findings provide insights to more comprehensively understand how contracts are designed to address uncertainties. The common and different practices revealed benefit both practitioners and scholars and consequently suggest pathways toward enhancing the potential benefits and efficiency of PPPs; the former by facilitating informed decisions such as market entry, project selection, and strategic contractual designs at both the project-level and policy-level, especially for evolving markets such as the Philippines, India, and other regional and comparable countries; the latter by providing a framework with supporting contractual evidence that (i) reinforces and supports numerous contractual and governance theories and principles and (ii) establishes a baseline for multiple subsequent inquiries such as examining the key factors affecting parties' contractual choices, the effectiveness of the practices uncovered, and the gaps with parties' preferences. The research is characterized by its broad scope exploring comprehensive sets of key provisions in 20 contracts spanning three countries and its important implications for both theory and practice of PPP contractual design. / Doctor of Philosophy / Public-private partnerships (PPPs) involve decades-long contracts between governments and private firms where a single private firm typically designs, builds, finances, operates, and maintains a specific infrastructure facility for revenues mainly from users (tolls) or governments. PPPs are theoretically expected to address certain limitations of traditional delivery approaches by capitalizing on private sector expertise and capabilities. Numerous studies have shown the feasibility of PPPs in many projects and sectors in various countries. However, PPP transactions are characterized by high uncertainty as a result of the involvement of numerous diverse stakeholders and the integration of multiple project lifecycle phases that span decades where changes in circumstances and requirements are inevitable. Contracts are the key and central instrument in project governance. Thus, addressing uncertainties is crucial in designing and implementing a PPP contract. Using a data set of 20 contemporary greenfield highway contracts in Australia, the Philippines, and India, this dissertation explored three key issues: risk allocation, decision rights allocation, and lifecycle project management. Risk allocation refers to which contracting party would take responsibility for certain contractual requirements with corresponding consequences or benefits. Decision rights allocation defines the boundaries of public sector involvement and consequently its control of the private sector's activities and decisions. Lifecycle project management is a set of contractual requirements, project structure, processes, and principles that steer the actions of and interactions between parties over a project's lifecycle. For risk allocation, the results reveal that most of the 35 key risks investigated were either transferred to the private sector or shared. One interesting and, to some extent, unexpected finding was the relatively high level of similarity in risk allocation within each country and across the countries, despite remarkably different characteristics at both project and country levels. This suggests that similar risk allocation practices may be employed across regional and comparable countries and perhaps beyond. No noticeable transnational trends or variances were observed except some shift of responsibilities to the private sector in user-paid projects (typically longer contract duration) compared with government-paid ones (typically shorter). Some limited trends over time such as a decrease in silent or indeterminate provisions and more risks retained by the public sector in recent projects in the Philippines and India, respectively, were observed. Additionally, exogenous risks (external to the project) had more consistent allocation and were shared more than endogenous risks (within a project's boundary). Some silent provisions were identified, indicating areas for improvement of contractual designs. For decision rights allocation, the key finding was the dominant level of owner control in 10 key provisions in almost all contracts, regardless of the country's level of development and the substantial number of risks transferred to the private sector. Contracts in Australia were more rigid, having distinctive, rigorous, and more detailed requirements with more efforts required beforehand to specify numerous provisions. Some limited national trends include contractual design evolvement over time in some provisions in the Philippines and India. Some silent provisions were identified, indicating areas for improvement or consideration. For lifecycle project management, parties designed contractual practices to rely on (1) contractual requirements with consequences for noncompliance and harmonious and collaborative relationships between parties, (2) rigid and detailed requirements and flexible ways to correspond to uncertainties, and (3) output-based management approaches (e.g., performance linked payments) and process-based management approaches (e.g., regular meetings and communication, procedures to resolve disputes) to address future uncertainties throughout a project's contract duration. Contracts in Australia tend to be more comprehensive in many areas requiring more ex ante contracting efforts such as naming contractors in contracts and ex post implementation efforts to comply with many distinctive requirements such as those concerning environment and community/user management. Meanwhile, contracts in Australia likely rely more on trust-based management versus monitoring/control-based management, having limited requirements for monitoring and safeguarding the contract. Overall, the common and different practices revealed facilitate informed decisions such as market entry, project selection, and strategic contractual designs at both the project-level and policy-level, especially for evolving markets such as the Philippines, India, and other regional and comparable countries. For instance, international developers expecting high revenue can choose the Philippines over India since revenue risk is typically a private risk in the Philippines but shared in India. Additionally, governments in the Philippines and India might want to consider adopting more trust-based management practices so that their contracts would better attract and incentivize international developers. The findings also provide contractual evidence that supports numerous contract and governance theories and principles and establishes a baseline for subsequent inquiries such as investigating the effectiveness of the practices uncovered, the key reasons for parties' contractual choices, and the gaps with parties' preferences. The research is characterized by its broad scope exploring comprehensive sets of key provisions in 20 contracts spanning three countries and its important implications for both theory and practice of PPP contractual designs.
215

Are public-private partnerships (PPPs) in post-socialist Poland efficient, productive, and mutually beneficial?

Urban, Jack 08 July 2010 (has links)
No description available.
216

Lean principles application in public-private partnership project procurement

Malek, Ramtin 21 April 2014 (has links)
No description available.
217

Organizing Freedom: Collaboration Between the Freedmen's Bureau and Church-Supported Charitable Organizations in the Early Years of Reconstruction

Lee, Kimberly Taylor 18 July 2019 (has links)
This case study examines why the Freedmen's Bureau, a Federal agency that existed within the War Department between 1865 and 1872, formed collaborative relationships with church-supported charitable organizations to establish schools during the Civil War Reconstruction Period in Virginia. This project examines the relationships between Freedmen's Bureau officials and the leadership of church-supported charitable organizations. Specifically, this project examines the formation of these relationships, the nature of the relationships that formed, the norms and values that shaped the relationships, and the impact those relationships had on education policy in the South. The examination of a historical federal agency through archival research methods generated findings that were consistent with current knowledge of the collaborative process. Preexisting relationships formed during the Civil War served as the foundation for collaborative relationships that formed between the Bureau and church-supported charitable organizations. These relationships were integral to the formation of schools that served formerly enslaved persons as well as other war refugees. Ultimately, political and social pressure facilitated the closing of the Bureau, but the schools remained, forming the foundation for public school systems throughout the South. Examining an extinct agency which worked alongside church-supported charitable organizations, shows that facets of collaborative governance occurred much earlier than presently identified, especially as it pertains to discrete steps in the collaboration process, specifically antecedent and initial conditions of collaboration, pre-existing relationships, and impacts of collaboration. The project also adds to the study of public administration as a field by extending the timeline of the practice of public administration. This dissertation also adds to the scholarship on the impact of race on policy implementation and administrative practice. / Doctor of Philosophy / This case study examines why the Bureau of Refugees, Freedmen, and Abandoned Lands (the Freedmen’s Bureau), a controversial federal agency that existed within the War Department between 1865 and 1872, formed collaborative relationships with church-supported charitable organizations to establish schools during the Civil War Reconstruction Period in Virginia. This project will examine the relationships between Freedmen’s Bureau officials and the leaders of various church-supported charitable organizations. Specifically, this project will examine the types of relationships that formed, the customs and values that shaped those relationships and the impact of those relationships had on education policy in Virginia. Relationships between charitable organizations and army officials formed during the Civil War and served as the foundation for relationships that formed between the Bureau and charitable aid organization. Although not unique for its time the Freedmen’s Bureau relied upon nongovernmental actors and entities in performing its functions, especially education. The schools that were established, served formerly enslaved persons as well as other war refugees and served as the foundation for the public school system across the South. Although the Freedmen’s Bureau would be abolished in 1872, the schools that were established with the help of the Bureau, remained. The fact that organizations were involved in Reconstruction-era schooling is known. That the Freedmen’s Bureau helped organizations establish schools throughout the South is known. Less is known about the extent of those relationships, however. Examining a historical and extinct agency which developed relationships with a number of church-supported charitable organizations shows that collaborative relationships occurred much earlier than we once thought.
218

Influence of Project-Level Characteristics and Factors on Innovation and Value Creation in US Highway Public-Private Partnership Projects

González Montalvo, Edwin E. 17 July 2017 (has links)
Innovation is a popular topic that receives significant attention from both organizations and academics. This attention includes scholars, executives, public entities, and private organizations in the construction and infrastructure fields. Scholars have examined innovation in both construction and public-private partnerships (P3s). Despite this work, gaps remain – particularly regarding the impact of project-level factors on technical innovation in P3s. Hence, this dissertation contributes to the areas of infrastructure innovation and P3s using a three pronged approach. First, exploration of the literature identified 348 factors that drive or inhibit innovation in infrastructure projects. These factors were synthesized into 33 aggregate factors such as client, integration, and risk. Subsequently, case interviews with practitioners revealed 110 factors that influence innovation in P3 projects; these were further grouped into six main categories. Literature and practitioner perspectives were strongly aligned around four predominant factors influencing innovation in P3 projects: i) risk, ii) client, iii) procurement, and iv) project type. Second, a framework to identify and classify project level innovation was derived and tested using deviations from project baselines submitted as alternative technical concepts (ATCs) in four infrastructure project procurements. The developed framework provides the infrastructure and construction community with a replicable approach to assess technical enhancements in projects to determine whether they are innovative or not and if so the type of innovation. Application of the framework classified only 7 of 53 ATCs from the four projects as innovative. However, the remainder added significant value through cost savings, improved safety or operational efficiency. Lastly, a case study of six contemporary US highway P3 projects: i) Elizabeth River Tunnels in Virginia; ii) East End Crossing in Indiana; iii) North Tarrant Expressway segments 3A&B in Texas; iv) I-4 Ultimate Improvement in Florida; v) I-77 HOT Lanes in North Carolina; and vi) SH 288 Toll Lanes in Texas was conducted to determine the types of innovation found and to assess the influence of key project characteristics on P3 technical innovation. Technical enhancements proposed by concessionaires were assessed using project documentation and semi-structured interviews with 23 experienced public and private sector project participants. Innovations were uncovered, albeit limited. Procurement, project type, and payment mechanism (demand risk/traffic risk) were the key project characteristics influencing innovation. Further, these same characteristics promoted added-value in the form of increased safety, reduced project durations, and decreased project costs. Together, the three studies advance our understanding of the effect of project attributes on technical innovation and value creation in infrastructure public-private arrangements. / Ph. D. / Governments around the world are using public-private partnerships (P3s) to provide needed infrastructure. They often claim that the involvement of the private sector in the delivery of infrastructure will generate various benefits, particularly innovation. However, public agencies and private infrastructure developers provide limited evidence of innovation outcomes. While academic scholars have explored the topic, the studies are limited and have generated alternative results. This dissertation contributes to the areas of infrastructure innovation and P3s with three independent but interrelated studies. First, the exploration of the literature and the perspectives of 23 experienced project participants identified four predominant factors that influence the occurrence of innovation in P3 projects: i) risk, ii) client, iii) procurement, and iv) project type. Second, a framework to identify and classify project level technical innovations in a replicable and transparent manner was developed and tested. Lastly, a multi-case study approach was adopted to determine the types of innovation found and to assess the influence of key project characteristics on P3 project technical innovation. Project documentation was assessed and interviews were conducted with public and private participants in six contemporary US highway P3 projects. Technical innovation was found within the cases, albeit limited. Demand risk and involving the private partner early were two of the most influential project characteristics on technical innovation. Further, these two characteristics promoted added-value technical enhancements through increased safety, reduced project durations, and decreased project costs.
219

Impact of Delivery Method on Stakeholder Issues and Involvement Practices in Mega Projects: Evidence from Fixed Crossing Case Studies

Ghadimi, Behshad 20 March 2017 (has links)
As the scale and scope of infrastructure projects have increased, so too has the array of stakeholders either involved or impacted. Such projects often take years to come together and evolve with time through the actions of project sponsors and the engagement of various stakeholders. Stakeholders through engagement and input can help legitimize and improve large-scale project initiatives. Stakeholders can also marshal opposition that can delay or block these projects. Consequently, the significance of stakeholder involvement is critical in megaprojects. Governments have increasingly utilized public-private partnerships (PPPs) for megaproject delivery. This method introduces characteristics that distinguish PPP megaprojects from others such as: private control, profiteering, foreign profits, and long-term concessions. This study investigates whether differences exist between PPP and non-PPP megaprojects with respect to stakeholder involvement strategies and stakeholder issues raised in such projects. This research employed a longitudinal multiple case study approach that examined four tolled fixed crossing megaprojects; two of them were delivered as PPPs and two were delivered as design-build (i.e. non-PPP). The approach followed the design of prior studies in this area by De Schepper, Dooms, and Haezendonck (2014) and Winn (2001). Pre and post milestone event analysis captured trends and shifts in involvement strategies and stakeholder issues. Subsequently, stakeholder issue tables (organized by issue themes) and stakeholder mechanism tables (organized by mechanism type and information flow) were utilized for across case synthesis and comparison to identify similarities and differences. Analysis of stakeholder involvements across cases showed that NEPA establishes a baseline for involvement, but its requirements are not sufficient for megaprojects; a more comprehensive strategy is necessary. Further, although participatory involvements may be beneficial particularly in complex settings, these mechanisms must be carefully managed in terms of process and criteria for evaluating stakeholder input. Additionally, when private partners/contractors are involved in megaprojects, they become part of the project team and support a coordinated involvement approach. Examination of stakeholder issues indicated that issues that are common to non-PPP and PPP projects are more prevalent than PPP specific issues. In particular, issues related to tolling are dominant; moreover, toll affordability is extremely sensitive, and its severity is predictable based on affected area demographics and past toll escalation practices. The study provided insights about how megaprojects are shaped through actions of project sponsors as well as impacted and interested stakeholders. It also demonstrated how these projects become artifacts of aspiration for politically powerful figures. Lastly, it identified the main stakeholder issues and suggested a set of guidelines to assist future practitioners in developing better stakeholder involvement strategies, which should both enhance and legitimize megaprojects. / Ph. D.
220

Public-Private Partnerships in the Presidential Library System

Boden, Daniel Paul 29 January 2014 (has links)
Public-private partnerships have become an important aspect of public administration theory and practice both in the United States and internationally. The National Archives and Records Administration, in partnership with private support foundations, administers 13 individual presidential libraries that make up the Presidential Library System. These privately constructed, publicly supported archives not only preserve official presidential records, but through their museum displays, also offer visitors a glimpse into the life and times of specific presidents. Although many consider these partnerships vital for the continued success of the Presidential Library System, relatively little is known about them. This qualitative case study explores the nature and extent of the public-private partnerships in the Presidential Library System, focusing on libraries established following the Presidential Records Act of 1978. Key themes related to the nature of these simultaneously mandated and voluntary relationships are their informal governance, decentralized administration, and increased reliance on private resources. This research has implications for both theory and practice of public-private partnerships in general as well as those supporting sites of collective memory such as archives, museums, monuments, and memorials. / Ph. D.

Page generated in 0.0711 seconds