• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 9
  • 9
  • 6
  • 5
  • 3
  • 2
  • Tagged with
  • 38
  • 9
  • 6
  • 5
  • 5
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • 4
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
31

Schedule and Cost Performance Analysis and Prediction in Louisiana DOTD

Hamide, Mahmoud 19 May 2017 (has links)
Many construction projects in the United States are facing the risk of cost overrun and schedule delays. This is also happening here in the State of Louisiana. When these things happen, it causes cost overrun which can then be passed on to the tax payers and may also cause the state to take on less projects than they normal. Many researchers have studied the reasons behind both the cost overrun and the delays resulting in private firms, developing project management tools and best practices to prevent this risk. In this research, I aim to study the historical trend in 2912 publically funded projects in the State of Louisiana. The study will reveal the overall state level of accuracy of forecasting cost and schedule. A forecasting formula based on those historical projects will be developed to assist estimators at the Parish level in predicting cost and schedule performance. The State of Louisiana has so many projects that deal with the transportation system (roadway, bridges, drainage, traffic sign, traffic signal, lighting etc...) My Dissertation will be a study and analysis of time and cost of the projects in LADOTD, whether the projects finish on time, before time or after time as well as the cost of the project that has been completed overrun or underrun or the exact amount that the bid amount was. With this study and analysis, my intention is to create time schedule and cost to be used to on reaching accuracy on finishing the project on time and the exact bid amount of the project (exclude whether condition, extra work, and some unexpected problems that may arise during the length of the project).
32

Zadávací řízení v procesu investiční výstavby / Tendering Procedure in Process of Investment Construction

Hrdinová, Eva January 2015 (has links)
The issue solved in this thesis is the procedure for the award of public contract with extensive subject matter of the construction works. In accordance with assumed level of fulfillment, over limit public order is awarded in open procedure. Afterwards, the analysis of submitted bids from contenders was created in parallel with an assessment of the impacts, which have occurred during the implementation of the fulfilling of the public contract. The thesis is examined from the perspective of the Act No. 137/2006 Coll., on Public Procurement, as amended. Future recommendation is the establishment of new amendment to that Act, with the aim to increase the evaluation criterion of economic advantageousness of tenders.
33

International Politics, Special Interests and Foreign Trade Policy: A Study of Turkish-American Textile Trade Relations

Yuvaci, Abdullah 23 April 2010 (has links)
No description available.
34

Technical uncertainties in and practical implications of the capitalisation of borrowing costs in South Africa / Leani van Staden

Van Staden, Leani January 2011 (has links)
The International Accounting Standards Board (IASB) and the United States Financial Accounting Standards Board (FASB) have reaffirmed their commitment to accomplishing the convergence of International Financial Reporting Standards (IFRS) and US Generally Accepted Accounting Practice (US GAAP), following their March 2010 progress report. Among the standards subject to this convergence project, is IAS 23 - Borrowing Costs. Taken at face value, the convergence of IAS 23 (IFRS) and SFAS 34 (US GAAP), and looking at convergence in general, the idea is productive and beneficial. It will lead to more comparative information as it eliminates the differences. The downside, however, could very easily be that convergence might just be taking place for the sake of convergence, and that the end result might not necessarily lead to more comparative and cost effective information. When specifically considering the convergence of the two borrowing costs standards (SFAS 34 and IAS 23), it is clear that differences remain even after their convergence, and therefore it does not promote comparability. The revision of IAS 23 might actually have been more costly and less beneficial, rather than the other way around. The first article in this dissertation claims that the mandatory capitalisation of borrowing costs is more costly than not, and that the IASB did not adequately consider the cost implications in their decision to change IAS 23, as well as that the benefits obtained from the capitalisation of borrowing costs are not that noticeable in practice. Participants in this study also seemed to agree that the application of IAS 23 is fairly difficult. Delving deeper into the technical aspects of IAS 23, a number of questions also arise relating to its application. This appears to be substantiated by the findings in the second article where instances were identified where the opinions of the participants relating to, for instance, what would be regarded as a 'substantial period of time', were divided. Differences relating to the above above viii may lead to one person capitalising borrowing costs, while another in the same situation would not. On the upside, a few instances were identified where participants were not as divided in their views. Therefore, although there appear to be some uncertainties within IAS 23, there are fewer than one would have expected. In summary, the revised IAS 23, in other words, the mandatory capitalisation of borrowing costs on qualifying assets, was viewed by participants as being more costly and difficult to apply than not and they felt that some technical uncertainties do exist within IAS 23. Recommendations have been made in this dissertation based on the useful information obtained. / Thesis (M.Com. (Accountancy))--North-West University, Potchefstroom Campus, 2011.
35

Technical uncertainties in and practical implications of the capitalisation of borrowing costs in South Africa / Leani van Staden

Van Staden, Leani January 2011 (has links)
The International Accounting Standards Board (IASB) and the United States Financial Accounting Standards Board (FASB) have reaffirmed their commitment to accomplishing the convergence of International Financial Reporting Standards (IFRS) and US Generally Accepted Accounting Practice (US GAAP), following their March 2010 progress report. Among the standards subject to this convergence project, is IAS 23 - Borrowing Costs. Taken at face value, the convergence of IAS 23 (IFRS) and SFAS 34 (US GAAP), and looking at convergence in general, the idea is productive and beneficial. It will lead to more comparative information as it eliminates the differences. The downside, however, could very easily be that convergence might just be taking place for the sake of convergence, and that the end result might not necessarily lead to more comparative and cost effective information. When specifically considering the convergence of the two borrowing costs standards (SFAS 34 and IAS 23), it is clear that differences remain even after their convergence, and therefore it does not promote comparability. The revision of IAS 23 might actually have been more costly and less beneficial, rather than the other way around. The first article in this dissertation claims that the mandatory capitalisation of borrowing costs is more costly than not, and that the IASB did not adequately consider the cost implications in their decision to change IAS 23, as well as that the benefits obtained from the capitalisation of borrowing costs are not that noticeable in practice. Participants in this study also seemed to agree that the application of IAS 23 is fairly difficult. Delving deeper into the technical aspects of IAS 23, a number of questions also arise relating to its application. This appears to be substantiated by the findings in the second article where instances were identified where the opinions of the participants relating to, for instance, what would be regarded as a 'substantial period of time', were divided. Differences relating to the above above viii may lead to one person capitalising borrowing costs, while another in the same situation would not. On the upside, a few instances were identified where participants were not as divided in their views. Therefore, although there appear to be some uncertainties within IAS 23, there are fewer than one would have expected. In summary, the revised IAS 23, in other words, the mandatory capitalisation of borrowing costs on qualifying assets, was viewed by participants as being more costly and difficult to apply than not and they felt that some technical uncertainties do exist within IAS 23. Recommendations have been made in this dissertation based on the useful information obtained. / Thesis (M.Com. (Accountancy))--North-West University, Potchefstroom Campus, 2011.
36

Medical tax benefits to South African taxpayers : an overview

Moosa, R. 09 1900 (has links)
This study presents an overview of the medical expenditure allowed to taxpayers in the South African Income Tax Act, 58 of 1962 (hereafter the “Income Tax Act”). The study traces the changes made to the allowed expenditure over time. Changes made to the Income Tax Act, illustrating the effect of qualifying medical expenses on the income of persons with disabilities in terms of the Income Tax Act, are described. Certain provisions of the Income Tax Act, as well as other legislation dealing with persons with disabilities, were analysed. Furthermore, the research shows the effect of moderate to severe limitations on a person’s ability to claim qualifying medical expenses. In particular, the change over from the medical tax deduction system (section 18 of the Income Tax Act) to the medical tax rebate system (sections 6A and 6B of the Income Tax Act) to redress the inequality between high income and low income earners, was analysed. Case studies were used to illustrate that the medical tax deduction system (section 18 of the Income Tax Act) favoured high income earners over low income earners. Finally, the change over from the medical tax deductions (section 18 of the Income Tax Act) system to the current system of medical tax rebates (sections 6A and 6B of the Income Tax Act) was analysed. Except for a very small group of taxpayers, the medical tax rebate system (sections 6A and 6B of the Income Tax Act) was found to be financially more favourable to all taxpayers. / Taxation / M. Compt. (Taxation)
37

The need for a flexible and discretionary system of marital property distribution in the South African law of divorce

Lowndes, Gillian Claire 11 1900 (has links)
Substantive gender equality has yet to be achieved in South Africa. As such, when a decision is made for one of the spouses to a civil marriage to stay at home and care for the children born of the marriage, or make career sacrifices to care for children, that spouse is usually the wife. As a result, while the husband continues to amass wealth and grow his earning potential, the wife is unable to do so. In circumstances where such spouses are married out of community of property or subject to the accrual system with onerous exclusion clauses in the antenuptial contract, the wife may be left with little more than a claim for rehabilitative maintenance in the event of a divorce. The courts only have the discretion to make an equitable distribution of marital property in civil marriages with complete separation of property concluded prior to 1 November 1984 (or 2 December 1988) and customary marriages. It is arguable that this limitation of the judicial discretion violates the equality clause contained in the Constitution of the Republic of South Africa, 1996. A broad judicial discretion to equitably redistribute the spouses’ assets upon divorce is therefore proposed in this dissertation. / Private Law / LL.M.
38

The need for a flexible and discretionary system of marital property distribution in the South African law of divorce

Lowndes, Gillian Claire 11 1900 (has links)
Substantive gender equality has yet to be achieved in South Africa. As such, when a decision is made for one of the spouses to a civil marriage to stay at home and care for the children born of the marriage, or make career sacrifices to care for children, that spouse is usually the wife. As a result, while the husband continues to amass wealth and grow his earning potential, the wife is unable to do so. In circumstances where such spouses are married out of community of property or subject to the accrual system with onerous exclusion clauses in the antenuptial contract, the wife may be left with little more than a claim for rehabilitative maintenance in the event of a divorce. The courts only have the discretion to make an equitable distribution of marital property in civil marriages with complete separation of property concluded prior to 1 November 1984 (or 2 December 1988) and customary marriages. It is arguable that this limitation of the judicial discretion violates the equality clause contained in the Constitution of the Republic of South Africa, 1996. A broad judicial discretion to equitably redistribute the spouses’ assets upon divorce is therefore proposed in this dissertation. / Private Law / LL. M.

Page generated in 0.0393 seconds