• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 413
  • 215
  • 175
  • 42
  • 27
  • 27
  • 25
  • 9
  • 7
  • 5
  • 5
  • 3
  • 2
  • 2
  • 2
  • Tagged with
  • 1047
  • 1047
  • 418
  • 368
  • 301
  • 148
  • 145
  • 130
  • 129
  • 128
  • 121
  • 114
  • 105
  • 100
  • 99
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
541

Analýza rizik výrobního procesu / The Risk Analysis in Production Proces

Kašpar, Adam January 2015 (has links)
This master’s thesis is focused on the risk analysis of the selected production process in company TES Vsetin, s.r.o. The thesis is divided into three parts, the theoretical part, analysis of the current state and design part. The theoretical part defines the basic concepts related to risk, risk analysis and tools for risk reduction. Some of these theoretical findings are then applied in the next section where these analyzes are used to the identification of risks. On the basis of these analyzes in the final part there will be designed proposals and recommendations, which should lead to a reduction of identified risks, including financial enumeration.
542

Řízení rizik společnosti Energopoint, spol. s r.o. / Risk Management of Company Energopoint, spol. s r.o.

Křivánková, Petra January 2015 (has links)
The thesis deals with risk management in the company Energopoint Ltd. The theoretical part explains important concepts related to the issue. This primarily involves the identification, analysis and follow-up methods of risk reduction. In the analytical part are identified all possible risks a company that has been detected by analysis of macro environment, micro environment and internal analysis of the company. To evaluate the significance of risks is used scoring method. Based on the findings of the analytical part I proposed measures to reduce risks. The contribution of the work is to gain the advantages of introducing risk management in the company.
543

Analýza rizik v managementu projektů / Risks Analysis in Project Management

Paulenda, Ján January 2011 (has links)
The main subject of this Master's thesis is risk management with emphasis on risk analysis stage. All important stages, definitions and techniques are introduced in the context of risk management. There are several risk analysis methods discussed in this thesis, especially the Markov analysis and the Petri net analysis. After the thorough analysis of the subject, the system to support the risk management was designed and implemented, while precisely Markov analysis was chosen.
544

Návrh projektu realokace vybrané firmy / Project Proposal for the Selected Company’s Reallocation

Procházková, Andrea January 2016 (has links)
The diploma thesis deals with the management issues, specifically the proposal of the company Ferrokont, s.r.o. and their productive and warehouse areas with using methods and technique of project management. The theoretical part describes elementary knowledge, techniques and methods of project management applying in practical part of the thesis. In introductory part of thesis is performed analysis of current condition of the company with the help of the study opportunities and than created draft of project containing time, resource, cost analysis and followed with risk analysis of the project. Benefits of the project are described in the end of the diploma thesis. Part of the diploma thesis is to create project of Microsoft Project.
545

Řízení rizik u vybraného podnikatelského subjektu / Risk Management of the Company

Zavadil, Jaroslav Unknown Date (has links)
The diploma thesis titled „Risk Management of the Company“ deals with risk management of selected process, analyzing and optimizing risk in purpose to reduce the risk in the company TIZZI KM, spol. s r.o. The first part is focused on explanation of the relevant therms for better understanding. This part describes basic therms and methods of risk management. The second part is focused on the analysis of the current situation and analysis of the risks that have been identified based on the selected proces of the change. The final part is focused on proposed recommendations and measures that will minimize the risks in the company.
546

Řízení rizik podnikatelského subjektu / Risk Management of Business Entity

Grygarová, Lucie January 2016 (has links)
The thesis deals with risk management of business entity, which provides services in field of education officials. Risk management proces consists of several parts, such as identification, analysis and risks reduction. All of these parts, including basic concepts, are described in the theoretical part. In the analytical part there are methods, which are using for identification potential risks. It include SLEPT analysis, Porter analysis and 7S model, then comes SWOT analysis. Based on these analyzes are proposed measures and recommendations that will help reduce risks.
547

Řízení rizik ve společnosti PLASTIC BOX CZ, s.r.o. / Risk Management in the Company PLASTIC BOX CZ, Ltd.

Brejchová, Ingrid January 2016 (has links)
This diploma thesis deals with risk management of a selected company. The described company is called PLASTIC BOX CZ, Ltd. and it is engaged in the manufacture of plastic products. The theoretical part contains the definition of components, which are mainly identification, analysis and methods to reduce individual risks. Appropriate analytical methods related to the risk management process are subsequently defined. In the analytical part, risks of the business entity are identified using selected methods. Risk analysis is performed by the FMEA analysis and elaborated in the specific process of running the company. The last part of this thesis includes the design of a risk management system of operating the company PLASTIC BOX CZ, Ltd., which is meant to ensure minimization and prevention of possible risks.
548

Řízení rizik projektu ve vybrané společnosti / Project Risk Management for Selected Company

Bendová, Veronika January 2016 (has links)
This diploma thesis is dealing with risk management application to specific project of production implementation in confectionary business, analyzing possible risks and suggesting needed corrections. The analysis of the current situation was created to help to reach the main goal. There was analysis of micro environment and macro environment followed by SWOT analysis which shows strengths, weaknesses, opportunities and threats. Special methods of project management were used, RIPRAN method for risk management. Based on previous analysis there is suggestion of possible needed corrections for the project.
549

Moderní cloudová řešení v podniku / Modern Cloud Solutions in the Enterprise

Fialová, Lenka January 2016 (has links)
This diploma thesis deals with the use of the cloud in a particular company. The main objective is to select a system that enables sharing and synchronizing data between employees and to prepare a proposal to deploy the system with regard to specific needs of the analyzed company. As part of the work is also the situation analysis, opportunity study and risk analysis.
550

Podnikatelský záměr - Zřízení čerpací stanice pohonných hmot / Business Plan for the Setting up of the Filling Station

Chaloupka, Michal January 2016 (has links)
This diplom thesis deals with a proposal of a business plan for setting up a public filling station of fuel located in Brno. In the theoretical part, there are described entrepreneurship, the most utilised methods of analyses and structure of the business plan at the theoretical level. Essential analyses for creation of the business plan are performed in the analysis part. Creation of the proposal of the business plan and creation of the risk analysis including the proposal of the countermeasure are content of the last part.

Page generated in 0.0736 seconds