• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 30
  • Tagged with
  • 30
  • 30
  • 10
  • 6
  • 6
  • 6
  • 6
  • 5
  • 5
  • 5
  • 4
  • 4
  • 4
  • 3
  • 3
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
21

Optimización de los Procesos Administrativos Operacionales de Sonacol S. A.

Roa Bernales, Iván January 2009 (has links)
No description available.
22

Desarrollo e implementación de indicador de seguimiento de obras de generación y transmisión en un mercado

Quintana Painemal, Eugenio Ernesto January 2012 (has links)
El objetivo general de este trabajo es sistematizar, a partir de la información pública disponible, los grados de avance de proyectos de generación y transmisión en un sistema eléctrico, de manera de poder establecer un juicio sobre la fecha de puesta en servicio de dichas obras. Esto con el fin de que exista una herramienta que permita clasificar a los proyectos en base a modelos matemáticos. Dada la naturaleza de la información disponible se utiliza la metodología de KKD para obtener conocimiento a través de la información disponible, lo que permite estimar la probabilidad de que una determinada variable nominal pertenezca a cada una de las categorías que puede tomar la variable en cuestión. Para determinar esta probabilidad primero se seleccionan los atributos que permitan explicar la variable en estudio, para luego determinar los coeficientes que acompañan a cada una de las categorías de los atributos seleccionados. Para la construcción de los modelos se utiliza la información pública disponible, por lo que en caso de disponer de mayor información, los resultados del modelo pueden cambiar y mejorar. De los resultados obtenidos se concluye que el acierto de los modelos obtenidos aplicados a los datos históricos supera el 70% en ambos caso. Además de entregar una predicción de la clase en estudio, se debe entregar la probabilidad que tiene la variable en estudio de pertenecer a cada categoría, ya que en los casos en que el modelo no entregó una predicción correcta fue debido a que la probabilidad que tenía esa categoría no era muy alta o era muy parecida a otra. Pese a que modelos de redes neuronales o árboles de decisión no entregan probabilidad, se utilizaron para comparar los resultados obtenidos, entregando estos dos último modelos mejores resultados en el caso que se estudia la materialización de los proyectos (cerca de un 10% de más aciertos). Finalmente se desarrolla un conjunto de herramientas gráficas que permiten visualizar los resultados obtenidos, además de observar los estadísticos más comunes.
23

Implementación de un sistema de control interno para la gestión de procesos de la empresa Fiduciaria Modelo

Arzapalo Lope, Susony Nadie, Mejía Apestegui, Osnar Elencio, Sánchez Ponce, Karla Maryorie 12 1900 (has links)
El presente trabajo de suficiencia profesional propone un "Sistema de Control Interno basado en el Modelo COSO I para la gestión de procesos de la empresa fiduciaria Modelo”, como una herramienta que permita mejorar los procesos de la empresa y así poder alcanzar una alta eficiencia a fin de incrementar la rentabilidad brindando un valor agregado en los servicios personalizados. La importancia de implementar dicho sistema consiste en prevenir acontecimientos que entorpezca el logro de los objetivos, así como velar por el cumplimiento de las normas aplicables. El modelo propuesto se basa en la necesidad de que los miembros de la organización comprendan la trascendencia del control interno y la incidencia del mismo sobre los resultados de la gestión. Se analizaron los cinco pilares del Modelo COSO I, los cuales se componen de la siguiente manera: (1) Ambiente de control, (2) Evaluación del riesgo, (3) Actividades de control, (4) Información y comunicación, (5) Supervisión y monitoreo. En las visitas realizadas, se utilizaron herramientas de investigación tales como entrevistas y Focus Group tomados a los integrantes de cada área donde se encontraron deficiencias relevantes. Por ello, se plantea como objetivo, confirmar si la implementación de un Sistema de Control Interno incide en la gestión de procesos de la empresa fiduciaria Modelo. Al concluir la investigación, se determinará si la aplicación de la metodología de la investigación fue aplicada correctamente para llevar a cabo la contrastación de las hipótesis y llegar a las conclusiones y recomendaciones del caso. / The present work of professional sufficiency proposes an "internal control system based on the COSO Model I for process management of the Model fiduciary company" as a tool that you allow to improve the processes performed of the company and this way achieved a high efficiency with the purpose of increase the profitability offering a value-added in the personalized services. The importance of implementing this system is to prevent events that hinder the achievement of the objectives as well as ensure for compliance of the applicable rules. The model is based on the necessity that the members of the organization understand the importance of internal control and the impact on the results of management. We analysis the five pillars of COSO Model I which are composed as follows: (1) Control environment, (2) Risk assessment, (3) Control activities, (4) Information and communication, (5) Supervision and monitoring. In visits, we used research tools such us interviews and Focus Group performed to the members of each area where we found relevant deficiencies. Therefore, propose as objective if the implementation of an Internal Control System affects the process management of the Model fiduciary company. To conclude the research, it will determine if the application of the research methodology was applied successfully to carry out the testing of hypotheses and get conclusions and recommendations. / Trabajo de Suficiencia Profesional
24

Las políticas gerenciales influyen en la implementación de un Sistema de Control Interno y su afectación en los resultados económicos en las Compañías de Seguros de Lima Metropolitana

Lópes Dorregaray, Jenny Evelyn January 2016 (has links)
La presente tesis “Las políticas gerenciales influyen en la implementación de un sistema de control interno y su afectación en los resultados económicos en las Compañías de Seguros de Lima Metropolitana” tiene como finalidad proponer diversas mejoras en los sistemas de control. El propósito es orientar acciones operativas y correctivas para hacerle frente a las deficiencias en la gestión del área cobranzas, todo esto encaminado al cumplimiento de los objetivos, y que conlleve a cumplir la responsabilidad social para la cual fue creada. También podemos mencionar que se desarrolla la importancia del sistema de control interno que esté tiene a efectos de implementar mecanismos o políticas gerenciales al interior de las compañías de seguros, los que brindarán seguridad para que las operaciones de ésta se realicen salvaguardando sus activos y, al mismo tiempo, reduciendo la posibilidad de errores. Además determinar la relación que existe entre políticas gerenciales y la implementación de un sistema de control interno, en las Compañías de Seguros de Lima – Metropolitana y su incidencia en el resultado económico, en la investigación se utiliza el método descriptivo no experimental, donde se observa los fenómenos tal como se dan en su contexto natural, para después analizarlos. La técnica de recolección de datos fue la encuesta, sobre una población censal de 8 colaboradores de las Compañías de Seguros de Lima – Metropolitana. Para el tratamiento estadístico de los resultados se empleó el Test Exacto de Fisher y el coeficiente de contingencia. Finalmente como base para las conclusiones y recomendaciones, se presenta la interpretación y el análisis de los indicadores determinados por área de trabajo.
25

Propuesta de un Sistema de Control de Costos para PYMES del Sector Constructor-Inmobiliario en Lima Metropolitana / Proposal of a Cost Control System applied in Small Businesses in the constructor-real estate sector in Lima

Avila Sihuay, Ximena Mariella, Olivo Acosta, Paolo 05 November 2020 (has links)
En la actualidad, en Lima se puede observar un incremento en la construcción de viviendas multifamiliares en respuesta al aumento poblacional presente en la capital. Sin embargo, a través de un estudio realizado por medio de encuestas a personal que haya laborado o se encuentre actualmente como parte del Staff de Obra en un proyecto ejecutado por una constructora clasificada como PYME, se ha logrado identificar la ausencia de un sistema de control de costos en la mayoría de los proyectos; lo cual usualmente es atribuido a un staff reducido y a una escasez de políticas en la empresa. A pesar de esto, los estándares de construcción, y las exigencias de los Clientes tanto inmobiliarias como finales únicamente siguen incrementando. Es por este motivo, que la presente tesis tiene como objetivo el establecer una estructura base para el control de costos de un proyecto de construcción que sea aplicable a las PYMEs. / Currently, in Lima there is an increase in the construction of multifamily homes in response to the population increase present in the capital. However, through a study carried out through surveys of personnel who have worked or are currently working as part of the Staff in a project implemented by a construction company classified as small, it has been possible to identify the absence of a cost control system in most projects; which is usually attributed to reduced staff and a shortage of company policies. Despite this, construction standards, and the demands of both real estate and final clients, only continue to increase. Because of the reasons explained above, this thesis aims to establish a basic cost control structure for a construction project that is applicable to small companies. / Tesis
26

Propuesta de un sistema de control focalizado para cuantificar e identificar en tiempo real los desperdicios de mano de obra y materiales en partidas incidentes de acabados húmedos en edificaciones, basados en el enfoque de valor ganado

Fernandez Paredes, Diego Alonso, Zamora Herrera, Yeffry Homar 08 January 2021 (has links)
En la actualidad, la mayoría de los proyectos de construcción cuenta con un sistema de control para evaluar el estado del proyecto en una determinada fecha de corte, en las cuales se evalúan los resultados mediante algunos reportes, entre los más conocidos los denominados RO (resultados operativos), los cuales son expuestos por lo general mensualmente, debido a que existe un prolongado proceso para desarrollar el flujo de información del proyecto. Por lo general, en los proyectos de construcción de una edificación, se realiza el flujo y procesamiento de información en un tiempo determinado que por lo general superan los quince días, en los cuales se define el estado general del avance del proyecto hasta la fecha delimitada, para posteriormente realizar un análisis detallado de los reportes, con la finalidad de disminuir la variabilidad que se traduce en los reportes como la desviación de lo planificado, este proceso de respuesta a las soluciones realizadas a la hora del análisis del estado de proyecto, también tiene un plazo de observación para verificar si se ha tomado las medidas de manera correcta, las cuales en su mayoría son mensualmente. Es decir, los sistemas de control usados actualmente en nuestro país tienen un tiempo determinado y prolongado para poder analizar sus estados y soluciones, lo cual si bien es cierto, algunas veces es efectiva, otras no. Lo que sí se puede afirmar respecto a la ejecución de estos mismo, es que se consume determinadas horas del proyecto, las cuales son invertidas solo en control y análisis, mas no en una definitiva solución. Ante esta situación, la motivación de esta propuesta de sistema de control es encontrar las principales actividades dentro de las partidas más incidentes de acabados húmedos, las cuales generan mayor desviación de lo planificado y asimismo tienen una gran influencia en el costo del desarrollo del proyecto, para poder controlar en tiempo real o final de jornal la situación o estado de estas mismas para así poder evitar desviaciones de gran magnitud respecto a lo planificado. / At present, most of the construction projects have a control system to evaluate the status of the project on a certain cut-off date, in which the results are evaluated by means of reports, among the best known the so-called RO ( operational results)), what is usually done in general, because there is a long process to develop the flow of information of the project. In general, in the projects of the construction of a building, the flow and processing of the information is carried out in a certain time that the general exceeds fifteen days, in which the general state of the progress of the project is defined until the delimited date Why not make a detailed analysis of the reports, this response process, the responses, the time of analysis of the project status, also has an observation period to verify if the measures have been taken correctly, the which are mostly monthly. That is, the control systems currently used in our country, have a time to extend to analyze their states and solutions, which although it is true, sometimes it is effective, sometimes not. What can be affirmed regarding the execution of these, are consumed during project hours, which are invested only in control and analysis, but not in a definitive solution. Purpose of making a proposal for a control system to identify and quantify in real time the waste of labor and materials in incidents of wet finishes Given this situation, the motivation of this control system proposal is to find the main activities within the most incident parts of wet finishes, which are increasingly deviating from the planned and also have a great influence on the development cost of the project, to be able to control the real or final time of the situation or their status in order to avoid large deviations from the planned one. / Tesis
27

Evaluación de la ausencia del COSO 2013 en la Gestión Financiera de los Operadores de Turismo Receptivo en el distrito de Miraflores 2018 / Evaluation of the absence of COSO 2013 in the Financial Management of Receptive Tourism Operators in the district of Miraflores 2018

Flores Basauri, Shirley del Pilar, Rivera Cavero, Diana Andrea 15 September 2019 (has links)
El correcto establecimiento de un Sistema de Control Interno se torna apremiante en todas las empresas, tanto públicas como privadas, para mejorar sus resultados, reducir riesgos y aprovechar correctamente los recursos que manejan. En este contexto, se ha detectado que el sector de turismo es uno de los que más se ha desarrollado en el Perú en los últimos años, contribuyendo en el PBI del país de manera significativa, lo que ha permitido que el mercado permanezca en continua expansión; pero en el que hay mucha informalidad y desorden, que aún no puede controlarse. Es por ello, que la presente investigación tiene como objetivo principal identificar el impacto que tiene la falta de un Sistema de Control Interno basado en el modelo Coso 2013 en la gestión financiera de los operadores de turismo receptivo en el distrito de Miraflores. Se tomó como objeto de estudio a los operadores turísticos porque se observó que están desarrollandose, en la mayoría de los casos, de forma empírica, sin una correcta planificación o estudio, y teniendo una visión a corto plazo. La investigación es de tipo explicativa, no experimental. Para la recolección de datos se revisaron antecedentes, se profundizó en temas del sector, se observó a una empresa Modelo representativa, y se realizaron cuestionarios y entrevistas a profundidad. / The correct establishment of an Internal Control System becomes urgent in all companies, both public and private, to improve their results, reduce risks and properly utilize their resources. In this context, it has been detected that the tourism sector is one of the most developed in Peru in recent years, contributing significantly to the country's GDP, which has allowed the market to remain in continuous expansion; but there is still too much informality and disorder, which cannot be controlled yet. For this reason, this research has as main objective to identify the impact that the lack of an Internal Control System has, based on the Coso 2013 model, in the financial management of receptive tourism operators in the district of Miraflores. Tour operators were taken as an object of study because it was observed that they are developing in the majority of cases empirically, without proper planning or study, and having a short-term vision. The research is explanatory, not experimental. For the collection of information, background checks were reviewed, sector topics were studied, a representative Model company was observed, and in-depth questionnaires and interviews were conducted. / Tesis
28

Propuesta para incrementar el nivel de servicio interno en el proceso de abastecimiento mediante el diseño de un sistema de control de inventarios y de la gestión de relación con los proveedores en una empresa del sector minero / Proposal to increase the level of internal service in the supply process through the design of an inventory control system and relationship management with suppliers in a company in the mining sector

Rioja Levano, Martin Reynaldo 13 July 2020 (has links)
La presente tesis se centra en analizar las herramientas de ingeniería industrial que permitan incrementar el nivel de servicio interno en el proceso de abastecimiento logístico en una empresa del sector minero y con el entorno económico de los últimos 10 años. La hipótesis plantea la implementación de un sistema de control de inventarios y de la gestión de relación con los proveedores. El trabajo está compuesto de cuatro capítulos. En el primero se analizó el marco teórico y los casos de éxito. En el segundo, se abordaron temas como: antecedentes y procesos generales y logísticos de la organización, definición del problema y sus causas, el impacto económico y el planteamiento del objetivo general y específico. Por su parte, el tercer capítulo se dividió en dos etapas: la primera correspondiente al diseño de la metodología y en la segunda etapa el desarrollo de la propuesta. Finalmente, en el cuarto capítulo, se incluyó el presupuesto de recursos, el análisis financiero de riesgos y la elaboración del flujo de caja respectivo; asimismo, se validó la propuesta por medio de la simulación con el software ProModel. Por lo expuesto, se concluye que, con la correcta elección del sistema de inventarios y una adecuada gestión de relación con los proveedores, se podrá incrementar el nivel de servicio interno en el proceso de abastecimiento logístico, con lo cual se logrará cumplir con un óptimo nivel de atención de repuestos de alta rotación, así como el cumplimiento en las entregas a tiempo para las compras con prioridad normal. / The present thesis focuses on analyzing industrial engineering tools that allow increasing the level of internal service in the logistics supply process in a company in the mining sector and with the economic environment of the last 10 years. he hypothesis raises the implementation of an inventory control system and supplier relationship management. The following work is made up of four chapters. In the first, the theoretical framework and success cases were analyzed. In the second, topics such as: background and general and logistical processes of the organization, definition of the problem and its causes, the economic impact and the approach of the general and specific objective were addressed. Consequently, the third chapter was divided into two stages: the first corresponding to the design of the methodology and the second to the development of the proposal. Nevertheless, in the fourth chapter, the resource budget, the financial risk analysis and the preparation of the respective cash flow were included; Likewise, the proposal was validated through simulation with the Promodel software. Based on the foregoing, it is concluded that, with the correct selection of the inventory system and proper relationship management with suppliers, the level of internal service in the logistics supply process may be increased, thereby achieving optimum compliance level of attention of high rotation spare parts, as well as the fulfillment in the deliveries in time for the purchases with a normal priority. / Trabajo de Suficiencia Profesional
29

MDCI: Model-Driven Continuous Integration

García Díaz, Vicente 29 June 2011 (has links)
El propósito de esta Tesis es llevar a cabo un proceso en el que se aplique la práctica de la integración continua en un desarrollo de software dirigido por modelos de forma eficiente, mediante el cual los desarrollos de software puedan beneficiarse conjuntamente de las mejoras y ventajas que proporcionan la aproximación de desarrollo de la ingeniería dirigida por modelos y la práctica de la integración continua. La aproximación de la ingeniería dirigida por modelos es el último salto natural de la ingeniería del software en cuanto a la búsqueda de métodos de desarrollo que elevan el nivel de abstracción hasta el punto en el que los expertos de un dominio de conocimiento, ajenos al mundo informático, son capaces de guiar y cambiar la lógica de los sistemas informáticos. La práctica de la integración continua es una recomendación de las principales metodologías de desarrollo, que tiene como objetivo la realización de integraciones automáticas del software en etapas tempranas del desarrollo, ofreciendo ventajas como la reducción del riesgo intrínseco que, dado su carácter temporal y único, tienen todos los proyectos. Con la unión de la ingeniería dirigida por modelos y de la práctica de la integración continua se busca ofrecer, a los equipos de desarrollo que trabajan utilizando algún tipo de iniciativa de la ingeniería dirigida por modelos, la posibilidad de integrar de forma continua y distribuida sus desarrollos. Al mismo tiempo, los clientes, verdaderos expertos del dominio de conocimiento en su ámbito de negocio, se benefician del aumento del nivel de abstracción de las técnicas de desarrollo para que ellos mismos, y de forma transparente, sean capaces de modificar su propio sistema informático sin la ayuda de personal técnico ajeno a su negocio, ahorrando así tiempo y costes. Para cumplir con el objetivo de esta Tesis doctoral se construye un prototipo que salva los impedimentos actuales que no permiten la unión entre estos dos nuevos activos de la ingeniería del software. Los principales problemas encontrados están relacionados con la selección de una iniciativa de desarrollo apropiada, los sistemas de control de versiones especialmente adaptados para trabajar con modelos, la generación incremental de artefactos a partir de modelos y la adaptación a las herramientas actuales de integración continua de forma optimizada. La separación del trabajo realizado en diferentes bloques permite ofrecer soluciones de forma tanto aislada como en conjunto, dando lugar a un trabajo iterativo e incremental de comienzo a fin. Para analizar las ventajas que ofrece la propuesta de este trabajo frente a otras posibilidades de desarrollo, se realiza una evaluación mediante la creación de diferentes casos de prueba en los que la medición de diferentes parámetros ofrecen una estimación numérica de las ventajas reales obtenidas. El análisis descriptivo, el contraste de hipótesis y las técnicas de regresión permiten una mejor interpretación de los resultados. Finalmente, se define el proceso, objetivo último de este trabajo, mediante la respuesta a diferentes preguntas planteadas, que facilitan su comprensión y entendimiento. / The purpose of this Thesis is to create a process in which the continuous integration practice can be applied to a model-driven software development in an e ective way, through which software developments can bene t jointly and simultaneously from the improvements and advantages provided by the model-driven engineering development approach and the continuous integration practice. The model-driven engineering approach is the last natural step of software engineering in the search for development approaches that raise the level of abstraction to the point that experts in a domain of knowledge, outside the computer world, are able to guide and change the logic of computer systems. The continuous integration practice is a recommendation of the most widely accepted development methodologies that aims to carry out automatic software integrations in early stages of development, o ering bene ts such as reducing the inherent risk that, given its unique nature, every project has. By merging the model-driven engineering and the continuous integration practice, the aim is to provide to development teams that work using some kind of model-driven engineering initiative, the possibility to integrate their developments in a continuous and distributed way. At the same time, customers, the real experts in the domain of knowledge in their eld of business, can bene t from the increased level of abstraction in developing techniques. Thus, they, in a transparent manner, are able to modify their own computer system without the help of external technical sta , so saving time and costs. To meet the objective of this Thesis, a prototype which saves all the current constraints that do not allow the union between these two new tools of software engineering is build. The main problems found were related to the selection of an appropriate development initiative, the version control systems specially adapted to working with models, the incremental generation of artifacts from models, and the optimized adaptation to existing continuous integration tools. The separation of work in di erent blocks can provide solutions, both in isolation or in conjunction, resulting in an iterative and incremental work from beginning to end. To analyze the bene ts of the proposal in this work compared to other development possibilities, an evaluation is performed by creating di erent test cases in which the measurement of di erent parameters can give a numerical estimate of the real bene ts obtained. The descriptive analysis, the hypothesis testing, and regression techniques allow a better interpretation of results. Finally, the process, the main objective of this work, is de ned by answering various questions posed to facilitate its comprehension and understanding.
30

Implementación de un controlador difuso de temperatura prototipo usando la inferencia difusa de Takagi Sugeno

Huamán Bustamante, Jesús Omar January 2007 (has links)
No description available.

Page generated in 0.0881 seconds