• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Utveckling av en skopkonstruktion med lägre produktionskostnader / Development of a bucket design with lower production costs

Hamid Elamin, Hamed, Mohammad Taher, Handrin January 2015 (has links)
Detta examensarbete handlar om en skopkonstruktions utveckling, avsedd för en serieskopor men konstruktionen har enbart implementerats på en kabelskopa. Arbetet har utförtspå uppdrag av ett verkstadsföretag som utvecklar, tillverkar och säljer entreprenadutrustningtill grävmaskiner och hjullastare. Företagets vision är att komma ut på den svenskalågprismarknaden, men i dagsläget är produktionskostnaderna på skoporna för höga. Måletmed arbetet har varit att ta fram en konstruktionslösning som sänker företagets produktionskostnader.Efter ett möte med företaget tydliggjordes vilka behov som efterfrågades och dessa behovtolkades i form av kundkrav. Med en QFD-analys översattes kundkraven till produktegenskapersom krävs för en lyckad skopkonstruktion. Fokus har främst lagts på att förenklaskopans montering och anpassa dess konstruktion för robotsvetsning. Några faktorer harvarit att utforma självfixerande detaljer och beakta åtkomlighet för svetsning. Konceptengenererades genom intern och extern sökning, där metoder så som brainstorming och konkurrentanalyshar använts.Konceptvalet utfördes med Pughs beslutsmatris, där ett relativt optimalt koncept valdes förfortsatt utveckling. Vid utvecklingen har diverse verifieringsmetoder använts, som till exempelriskanalys, finita elementmetoden (FEM) och kostnadskalkyl för att kontrollera attdet valda konceptet uppfyller de uppsatta kraven för skopan. I verifieringsfasen identifieradesflera förbättringsmöjligheter som implementerades på det valda konceptet och dettagav ett bättre koncept än tidigare.Det slutliga konceptet har fått en sänkt produktionskostnad, med effektivare montering,minskad materialanvändning och svetsning samt en bättre prestanda än tidigare. / This thesis is about the development of a bucket design; intended for a range of excavatorbuckets consisting of four different types, but has only been implemented on the cablebucket. The work has been performed on behalf of a company that develops, produces andsells construction equipment for excavators and wheel loaders. At the present, the company'sexcavator buckets have high production costs, but the vision is to get into the low-costmarket. The goal of this work has been to develop a bucket design that reduces the company'sproduction costs.After a meeting with the company it became clear what needed to be achieved. The collectedneeds were interpreted in terms of customer requirements. A QFD was made, and thecustomer requirements were translated into product specifications for a successful bucketdesign. Particular focus has been put on simplifying the assembly of the bucket and adaptingits design for robot welding. Some essential factors have been to design interactingparts and to consider the accessibility for welding. The concepts were generated throughinternal and external searches, where methods as brainstorming and competitor analysiswere used.Concept selection was made by using Pugh's decision-matrix. A relatively optimal conceptwas selected for further development. During the development, various verification methodswere used, as for example risk analysis, finite element analysis (FEA) and cost estimate,to verify that the selected concept meets the set requirements for the excavator bucket.Several potential improvements were identified during the verifications phase and theseimprovements were implemented on the selected concept, which resulted in an even betterconcept than before.The final concept obtained a reduced production cost, with a more efficient assembly, reducedmaterial use and welding as well as a better performance than before.
2

Werkstoffeinflüsse auf den Spritzgussprozess von hochgefüllten Phenol-Formaldehydharz­-Formmassen

Scheffler, Thomas 11 January 2019 (has links)
Im Rahmen der vorliegenden Arbeit wurden verschiedene duroplastische Formmassen laboranalytisch hinsichtlich der rheologischen und thermischen Eigenschaften untersucht. Es wurde u.a. gezielt die absolute Materialfeuchte gesteigert, um den Einfluss dieser auf das Fließ­ Härtungsverhalten zu charakterisieren. Anschließend wurden die Materialien auf einer hochinstrumentierten Spritzgussmaschine mit einem Fließspiralenwerkzeug untersucht. Dabei konnte ein direkter Zusammenhang zwischen dem Rückfluss und dem Plastifizierdrehmoment in Abhängigkeit der Materialfeuchte und der Prozessparameter detektiert werden . Des Weiteren wurden über die Differenzdruckmessung im Fließspiralenwerkzeug die scheinbaren Viskositäten über den Fließweg ermittelt. Hierbei konnten unterschiedliche Aufschmelzeffekte über die Fließweglänge in Abhängigke it der duroplastischen Formmasse, der absoluten Materialfeuchte und der Prozessparameter detektiert werden . Durch Schererwärmung konnte die Formmassentemperatur teilweise die Werkzeugtemperatur übersteigen. Hinsichtlich der mechanischen Eigenschaften (Schlagzähigkeit, Biegefestigkeit) konnten keine signifikanten Einflussgrößen detektiert werden. Hinsichtlich des Tg konnten systematischen Unterschiede detektiert und begründet werden. Die beste Möglichkeit zur Ermittlung des Tg lieferte die TMA. Die thermischen Glasübergänge korrelieren mit den in der DSC ermittelten Aushärtegraden , wobei mit steigender Materialfeuchte ein geringer Aushärtegrad detektiert wird. / Within this paper, the rheologieal and thermie eharaeteristies of different thermosetting molding eompounds were investigated using lab analysis methods. Among others, the absolute moisture eontent was inereased purposefully to investigate its influenee on the flow-euring behavior. Subsequently, the materials were analyzed using a highly instrumented injeetion-molding maehine and a flow spiral tool. A direet link between the baekflow and the plastifieation torque dependent on the moisture eontent and proeess parameters was deteeted . Furthermore, a measurement of the differential pressure was eondueted within the flow spiral to deteet the apparent viseosity over the flow path. Within this proeess, different melting effeets over the flow eurve length depending on the molding eompound, the absolute moisture eontent and proeess parameters were deteeted. The shear heating lead to a material temperature inerease of the molding eompound, whieh was partly higher than the tool temperature . Coneerning the meehanieal eharaeteristies (impaet strength, flexural strength), no signifieant influeneing faetors eould be deteeted. In eontrast, systematie differenees of the glass transition temperature were deteeted and their eause eould be explained. The best way to determine the glass transition is the TMA. The glass transition temperatures eorrelate with the degree of eure determined with the DSC, whereas an inereasing moisture eontent is assoeiated with a lower degree of eure.

Page generated in 0.0444 seconds