• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 1
  • 1
  • Tagged with
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Processeffektivisering av kantpressar / Streamlining of a press brake operation

Loodin-Ek, Hanna, Schalin, Rebecka January 2018 (has links)
Studien undersöker processen i plåthallen vid kantpressarna på Systemair Sverige AB i kommunen Skinnskatteberg. Systemair Sverige AB är ett företag som tillverkar luftridåer, ventilationssystem och luftaggregat och är ledande på marknaden inom sitt område. Systemair Sverige AB anser att processen sker ineffektivt vid kantpress vilket ger oönskade och långa ställtider. Målbilden för studien var då att hitta relationer mellan artiklar som går igenom kantpressarnas flöde och därefter dela in verktygen för att få ner ställtiderna. Tillvägagångsättet är av analyserande karaktär och följer en PDCA (Plan, Do, Check, Act) struktur där ett antal frågor formulerades i början och som diskuteras i rapportens gång. Studien inleds med en grundlig nulägesanalys där verktyg inom Lean identifierades för att bemöta och hantera det uttalade problemet. Exempel på verktyg som användes är flödeskarta, produktionsflöde och produktfamiljer. Metoderna anpassades utefter studien och resulterade i en verktygsindelning. Utifrån verktygsindelningen har en procentuell indelning kunnat göras vilket ger upphov till nya flöden och som presenteras i rapporten. Projektgruppen har berört artiklar som behandlats av standardverktyg inom Prägling och Luftbock samt verktyg inom dessa områden utöver standard. För att få ner ställtiden så har en SMED-analys (Single-digit Minute Exchange of Die) utförts varav det har plockats ut en tidsstudie. Den längsta uppmätta ställtiden var på 43 minuter vilket projektgruppen tror går att reducera till 16 minuter genom verktygsindelningen. Då detta inte var i enlighet med SMED, där målet är att ställtiden ska vara under 10 minuter, så gavs indikationer på att fler faktorer spelade in varav en Ishikawa (rotorsaksanalys) upprättades. För att nå detta SMED-mål så gavs fortsatta rekommendationer varav ett är standardiserat arbetssätt. Slutligen presenterades tre förslag gällande effektiviseringen av kantpress, alla inom verktygsindelningen, och de frågeställningarna besvarades i slutsatsen. / The report studies the process by the press brakes at Systemair Sweden AB in the county of Skinnskatteberg. Systemair Sweden AB is a company that produce air curtains, residential ventilation, air conditioning devices and is leading within its own market of products. Systemair Sweden AB consider the press brake process to be inefficient which result in unwanted and long set up time. The intention of the report was to find the relations between products that are being processed in the press brake and thereafter sort each individual product stream by similarities in the equipment being used to reduce the set-up time. The approach of the report is of analyzing character and has a PDCA (Plan, Do, Check, Act) framework where a few questions are enunciated in the beginning of the report and discussed throughout the report. The report initiates in a thorough status analysis where tools within the theory of Lean is identified and used to handle the mentioned problem. Examples of tools being used is a production map, production flow and production families. The methods are adapted for this problem and report which resulted in a classification in equipment. A percental division was established by the classification which sourced new defined production flows and are presented in the report. The project group has focused on products produced with standard equipment in the two most used press types and a few products being processed by other equipment. To reduce the press brakes long set-up times a SMED analysis (Single-digit Minute Exchange of Die) has been implemented and a clock study. The longest set-up time in this study was in 43 minutes which the project group think can be reduced till 16 minutes by classifying equipment. According to SMED, a set-up time under 10 minutes is achievable, which is not the case here which indicated that there are more factors having to be in consideration. Therefore an Ishikawa (analysis of causes) was made in order to acknowledge these factors and recommendations was given to continue the work whereof one recommendation was standardized work methods. In the final of the report three suggestions are presented to streamline the press-brake process, all formed through classification of equipment, and lastly the questions from the beginning are answered.
2

Vliv drsnosti povrchu stěny na součinitel výtoku / Influence of the wall roughness on discharge coefficient of orifice

Jinek, Josef January 2015 (has links)
This thesis deals with the influence of the wall roughness on discharge coefficient of sharp-edged circular bottom orifice. It supposed to verify, summarize and extend knowledge of orifice discharge. Author of this thesis determine a discharge coefficient by measurement. Values of discharge coefficient were measured for roughness of the wall represented by different diameters of grains and these values were compared with available values published in specialized bibliography by different scientists. At the thesis end was made a summary evaluation.

Page generated in 0.052 seconds