• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 2
  • 1
  • Tagged with
  • 3
  • 2
  • 2
  • 2
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • 1
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
1

Multi-use arena i Sollentuna

Engdahl, Christer January 2011 (has links)
A place that mixes different kind of uses of space. Two main theatres inside and a lot of smaller rooms for different venues. A methaphor the tide have strong impact of shaping the building
2

Deep Green, en jämförande analys / Deep Green, a comparative analysis

Ahlin Wigardt, Oliver January 2016 (has links)
Marin energi har stor potential att på ett relativt miljövänligt sätt utvinna energi ur bl.a. vind, vågor och strömmar. Prototyper och kraftverk för att skörda energi ur tidvattenströmmar har de senaste 10 åren blivit mer populärt, inte minst för att uppnå de miljökraven som ställts internationellt. Minesto är ett företag som utvecklar ett tidvattenkraftverk som heter Deep Green, som har ett väldigt unikt utförande, och har analyserats och jämförts mot två andra relevanta konkurrerande tidvattenkraftverk, DeltaStream och Seagen S. Studien har fokuserats på de vanligaste utförandena och variation vad gäller transmission, fundament, installation, strategi för att utföra underhåll och reparationer, reglering och elnätsanslutningar, för att sedan på ett mer strukturerat sätt förklara och beskriva de tre kraftverken. Deep Green är en så kallad tidvattensdrake. Tidvattensdraken består av en vinge med gondol och turbin som är monterad i havsbotten med ett tjuder. När tidvattnet förs över vingen börjar Deep Green att färdas framåt, på grund av den lyftkraft som bildas över vingen, i en bana formad som en åtta. Kraftverket uppnår sin märkeffekt på 0,5MW vid tidvattenströmmar på 1,4 m/s. DeltaStream och Seagen S är båda tidvattenkraftverk med horisontal axiala monterade turbiner, dvs. samma princip som vindkraftverk men tillämpad under vatten. DeltaStream och Seagen S producerar vid märkeffekt 1,2MW respektive 1,2MW - 2,0MW vid strömhastighet på 3,1 m/s respektive 2,5 m/s. Den jämförande analysen påvisar att Deep Green har störst potential och var bäst på 8 av 18 punkter. Analysen sammanställdes och rangordnades genom poängen 1-3, med avseende på egenskaper i förhållande till varandra då kraftverket med bäst egenskap under en rad fick 3 poäng och den minst bra får 1 poäng. Saknas uppgift ges ett poäng och likadana/liknande egenskaper ger 2 eller 1 poäng beroende på egenskap. Denna sammanställning gav Deep Green 42 poäng, Seagen S 36 poäng och DeltaStream 34 poäng. / Marine Energy has a great potential to extract energy in a relatively environmentally stable order from e.g. wind, waves and streams. Prototypes and power plants to extract energy from tidal streams have gotten quite popular the last 10 years, none the less because of the international environmental agreements. Minesto is a business that’s developing a tidal power plant called Deep Green that has a very unique design, and has been analysed and compared with two other relevant competitive tidal power plants, DeltaStream and Seagen S. This study has focused on the most common designs and variation by transmission, foundation, installation, strategy for maintenance and repairs, control and grid connections, to in a more structured way explain and introduce the three tidal power plants. Deep Green is a so called tidal kite. The tidal kite consists of a wing with nacelle and a turbine, and the unit is mounted to the seabed with a tether. Deep Green starts to move forward when the tide flows over the wing, due to the lift force, in a 8 shaped trajectory. The power plant reaches its max power extraction of 0,5 MW in tides from 1,4 m/s. DeltaStream and Seagen S are both tidal power plants with horizontally mounted turbines, by the same principle as wind power plants but design for underwater use. DeltaStream and Seagen S are producing 1,2 MW and 1,2MW – 2,0MW in tides from 3,1 m/s and 2,5 m/s, respectively. The comparing analysis shows that Deep Green has the greatest potential and was the best in 8 out of 18 points The analysis was compiled and was ranked through the points 1-3, with respect to characteristics relative to each other where the power plant with the best characteristic in one row got 3 points and the least good characteristic got 1 point. Is any information missing is 1 point given and equivalent properties get 2 or 1 point depending on the property. This compilation gave Deep Green 42 points, Seagen S 36 points and DeltaStream 34 points.
3

Study of NEOM city renewable energy mix and balance problem

Alkeaid, Majed Mohammed G January 2018 (has links)
It is important for NEOM management in the contemporary world to put in place NEOM projects using the available resources. The region in which the NEOM project is spacious and vast with conditions suited to generate energy from solar and wind. The NEOM projectis expected to be set up in the very resourceful state of Saudi Arabia. The purpose of the study is to assist in setting up a sustainable city through the exploitation of solar and wind energy. The aim of the study was to assist in the generation of more than 10 GW renewable energy to replace approximately 80,000 barrels of fossil energy. The problem of coming up with renewable and sustainable energy from the unexploited sources is addressed. The renewable city is expected to be a technological hub based on Green Energy with 100% renewable energy, which is correspond to 72:4GW. Freiburg and Masdar as renewable cities are used as case studies in the research. NEOM power generation capacity is capable to cover Saudi Arabia power generation capacity (approximately 71GW), which is more than enough for a city. The study reveals that the total power generation from wind farms, tidal farms, solar stations, and solar power tower stations are 9:1373GW, 4:76GW, 57:398GW and 1:11GW respectively. Saudi Arabia has plans to set up 16 nuclear plants (17 GW each) for energy purposes (total of 272 GW), which will be part of Saudi Arabia national grid and will be more than enough to cover NEOM electricity demand in case NEOM does not reach demand capacity. In case NEOM energy does not meet the demand, electricity generation from 16 Nuclearpower plants generating 17GW each, and 6 Natural underground batteries with a capacity of 120MW each are recommended. The study results can be applied in NEOM Institute of Science and Technology for further research on renewable energy. The findings can also be used for research extension of HVDC transmission lines between NEOM and Saudi Arabia main grid, Egypt, and Jordan. / Det är viktigt för NEOM projektets ledning att planera och införa projektet med hjälp av förnybara energiresurser på plats. Regionen är rymligt och stort och är en lämplig plats för att kunna generera tillräcklig med energi från sol och vind för energiförsörjning av området. Syftet med studien är att studera en pågående planering och byggnation av en hållbar stad med upp till 10 GW förnybar energi som motsvarar cirka 80 000 fat fossil bränsle. Problem och utmaningar för att försörja en hel stad med förnybara energiresurser kommer att diskuteras. Den förnybara staden förväntas vara ett föredöme för 100% förnybar energi, vilket i kapacitetssammanhang motsvarar 72:4GW, vilket är mer tillräckligt än behovet för NEOM staden. Freiburg och Masdar städer används som fallstudier i examensarbetet. NEOMs kraftproduktionskapacitet kan täcka behovet av hela landet som uppgår till 71GW. Studien visar att den totala kraftproduktionskapaciteten från olika förnybara energiresurser såsom vindkraftparker, tidvattenanläggningar, solcellkraftverk och soltornskraftverk med en kapacitet av 9:1373GW,4:76GW, 57:398GW och 1:11GW respektive kan uppgå till 72:4GW. Saudiarabien har planer på att skaffa 16 kärnkraftverk (17GW vardera) med en total kapacitet på 272GW som kommer att ingå i Saudiarabiens nationella satsningar för framtidens elproduktion och det kan täcka elbehovet om NEOM inte når efterfrågekapaciteten. Utöver ovan har studien föreslagit 6 underjordiska batterier med en kapacitet på 120MW per batteri. Studieresultaten kan användas för kompetensuppbyggnad och vidare forskning om förnybara energiresurser för NEOM Institute of Science and Technology. Resultaten kan också användas för teknikutveckling och forskning inom HVDC- överföringsledningar mellan NEOM, Saudiarabiens huvudnät, Egypten och Jordanien.

Page generated in 0.039 seconds