Bytový dům v Nymburku - stavebně technologický projekt / Appartment house in Nymburk - Construction Technology ProjectKočí, Lukáš January 2019 (has links)
The aim of the thesis is the solution of selected parts of the building-technological project for a building in Nymburk. The content of the diploma thesis is a technical report for a building technology project, a study of the realization of the main technological stages of the building, a technical report of the building site equipment, a design of a machine assembly, a technological regulation for the execution of masonry from concrete blocks and folded ceiling constructions, a control and test plan for the implementation of masonry from concrete blocks and execution of folded concrete ceilings, OSH plan on site. In the appendix of the thesis I elaborated drawings of construction site equipment, item budget of building, object budget according to THU, construction schedule, material resources plan and dimension of building machines.
|
82 |
Stavebně technologický projekt stanice Integrovaného záchranného systému / Construction-technological project of Integrated Rescue System StationŠmíd, Radim January 2019 (has links)
The subject of this diploma thesis is construction-technological project of the integrated rescue system station. The building is situated in the village of Týn nad Vltavou and will be used to perform the service of fire protection of the population. The thesis is focused on the design of the construction site equipment, the time and financial plan, the design of the main building machines and mechanisms, the technological specification, the control and test plan, and also the occupational safety and health protection.
|
83 |
Bytový dům, Brno ulice Bělohorská. Stavebně technologická příprava stavby. / Apartment building, Brno Bělohorsk street.Civil technical projectDivácký, Petr January 2019 (has links)
The subject of this diploma thesis is construction-technological preparation of a residential building in Julianov. It includes a technical report on building structures, a construction technology study, a technological prescription, a control and test plan, a site equipment design, a design of a machine set, an item budget, a timetable, and a design for the implementation of paved areas.
|
84 |
Příprava realizace železobetonové skladovací haly v Poličce / Preparation for realization of reinforced concrete storage hall in PoličkaZelinková, Marta January 2019 (has links)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls and halls of Ravensburger Karton s.r.o.. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
|
85 |
Stavebně technologický projekt rekonstrukce silničního mostu v obci Vlkoš / Construction-technological project for the reconstruction of the road bridge in the village VlkošOtrusina, Ondřej January 2019 (has links)
This masters dissertation deals with the preparation and realization of a road bridge recontruction in the Vlkoš village. The introduction of this thesis contains basic information about the structures of the construction. Execution of main technological stages is addressed in construction technological study. The thesis also includes a coordinational site-layout of the construction, design of site equipment, design of the main construction machines and mechanisms, time and financial schedule, construction workers deployment plan, plan of achines usage. In my thesis I deal mainly with the supporting construction of the bridge. For these stages i implemented technological directives in addition of Inspection and check plan. Safety and protection of health durink work is also addressed. I also worked out the technical report of the constuction sites facilities including the needed drawings.
|
86 |
Řízení stavební zakázky / Construction Order ManagementKadeřávková, Jitka January 2019 (has links)
This thesis is devoted to management of construction contract and the thesis is divided into two parts – theoretical and practical. The theoretical part is focused on familiarizing with some concepts of project management, cost control, time management and risk management. At the end of the theoretical part, there are described types of construction of a family house. Practical part involves applying these principles on the example of the particular construction work contract. It also describes and analyzes organization of construction contract and together with risk management meets the appointed target. The desired output of theses is processing of necessary documents for the management of specific construction contract by house raising.
|
87 |
Stavebně technologický projekt rekonstrukce objektu Rooseveltova v Brně / CONSTRUCTIONAL AND TECHNOLOGICAL PROJECT OF RECONSTRUCTION OF BUILDING ROOSEVELTOVA IN BRNOPavelka, Petr January 2019 (has links)
This diploma thesis deals with the constructional and technological project of reconstruction of building Rooseveltova in Brno. The basis for this work was the design documentation for the realization of this project. The technical reports provides all the basic information about the construction to this project. Demolition works and implementation of cast-in-place reinforced concrete floor are detailed processing in the technological regulations. Control and test plans, time and financial plans, drawings of building equipment, draft of machinery and plans of health and safety and fire prevention are also component of this project. Another annex of this thesis is budget and selected assembly details.
|
88 |
Řízení stavební zakázky ve stavebním podniku / Construction Order Management in the Construction CompanyVavřinka, Pavel January 2020 (has links)
The aim of diploma thesis is to describe and analyze organization of construction contract at the specific construction company. Introduction contains summary of theoretical knowledge, followed by construction order preparation on general level. The practical part contains application on specific construction contract.
|
89 |
Vybrané části stavebně technologického projektu administrativní budovy s halou v Brně / Selected Parts of Construction Technology Project of an Office Building with a Hall in BrnoBakyta, Marián January 2020 (has links)
This diploma thesis deals with selected parts of the construction technology project of an office building with a hall in Brno. The thesis contains a technical report, the coordination situation of the construction, the time and financial plan, the study of the main technological stages, the project of site equipment, the design of the main building machines and mechanisms, the time schedule, the budget, the technology prescription of flat single-roof, the quality control and test plan, the assessment of lifting mechanism selection and the design of rainwater capture for further use.
|
90 |
Vybrané části stavebně technologického projektu mateřské školy v Brně / Selected parts of the construction-technology plan - kindergarten in BrnoBartek, Petr January 2020 (has links)
This thesis deals with a construction-technology plan of two-story nursery school in Brno, district Bystrc. Thesis contains engineering report, financial and time schedule for structures, project of construction site, noise study, technological notes and inspection and test plans for cast-in-place reinforced concrete slabs and for prestressed concrete Spiroll floor slabs, formwork study, list of main machines used during construction, time schedule, needed quantity of workers and itemized budged for carcass, budged for whole building and comparison of cranes. Moreover, in appendices are drawings of approaches and processes during construction in its different phases.
|