Spelling suggestions: "subject:"time schedule"" "subject:"lime schedule""
101 |
Sportovní areál - stavebně technologická příprava / Sports complex - construction and technological preparationPetruška, Tomáš January 2012 (has links)
The diploma thesis solves the construction technology project of sports complex. The aim of the thesis is rational proposal of construction and resources. The thesis contains plant building site, technological instruction, budget, time schedule, control and trial plan, design and assessment of lifting mechanism and machinery used over construction, contract for work and safety report. Part of the thesis is specialization in sports surfaces.
|
102 |
Stavebně-technologický projekt výstavby výrobního objektu - areál Papírny Brno a.s. / Construction technology project of production facility of Brno papermill s.c.Pavlíček, Jan January 2013 (has links)
Master´s thesis named Construction technology project of production facility of Brno papermill s.c. is focused od technological preparation and realization of production facility itself. Main goal is to design time, financial, human and material sources. All these aspects were designed according to project documentation for construction permit.
|
103 |
Vybrané části stavebně technologického projektu železobetonového mostu v obci Mostkovice / Selected Parts of the Construction Technology Project of Reinforced Concrete Bridge in MostkoviceProcházka, Miroslav January 2013 (has links)
This thesis deals with selected Parts of the construction technology project of reinforced concrete bridge in Mostkovice. It is about a replacement of the existing masonry construction of new, reinforced-concrete frame founded on surface. Part of the work in addition to other are schedule and financial plan, budget and construction situation, site equipment, study of realization, plan of using the main mechanisms, health and safety at work and technological prescription.
|
104 |
Řadové rodinné domy ve Svitavách - stavebně technologický projekt / The terraced houses in Svitavy - the construction technology projectBajerová, Radka January 2013 (has links)
The subjects of the thesis are chosen parts of the building technological project for the preparation and realization of the terraced family houses in Svitavy. The solution includes The study of the main technological stages realization, Time schedule and financial plan, The project of the site facilities including design of the main hoisting mechanism. The realization of ceiling construction is described in detail by The technological prescription. The solution also includes a proposal of local and utility roads repairs on the streets Gorkého and U Studeného potoka.
|
105 |
Stavebně-technologický projekt pavilonu horského hotelu / Constructive - technological project of pavilion of mountain hotelSurý, Václav January 2013 (has links)
This master´s thesis solves the constructive - technological project of pavilion of mountain hotel. It is an extension of pool hall. The master´s thesis includes: nail shoring walls, jet grouting, excavation, reinforced concrete base pan. There are technological solutions, especially prescription nail walls and jet grouting. Solution also contains the site facilities, the schedule, the situation with the solution structure of transport routes, itemized budget, proposed mechanical assembly, safety and health at work.
|
106 |
Vybrané části stavebně technologického projektu bioplynové stanice v Herálci / Selected Parts of Building -Technological Project of Biogas Station in HeralecPíštěk, Kamil January 2013 (has links)
The master thesis with the name Selected Parts of Building -Technological Project of Biogas Station in Heralec solves preparation and realization of building. The aim of master thesis is to design of time, financial and material resources. The thesis contains budget, time schedule, building-site, technological standard, control and trial plan, assessment of lifting mechanism and study of realization of the main stages. The thesis is prepared on the basis of technical documents submitted by the designer. Part of the thesis is specialization.
|
107 |
Stavebně technologický projekt výstavby polyfunkčního domu v ulici Opuštěná, Brno / CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDING POLYFUNCTIONAL HOUSE IN OPUSTENA STREET, BRNODražilová, Michaela January 2013 (has links)
Project of master thesis solves brand new residential polyfunctional house with bike shop. The main object is a four-storyed, designed as a monolithic skeleton construction. The building is located in Opuštěná Street, Brno. The project is developed on the basis of project documentation and technical data, delivered by the designer in the behalf of investor requirements. Main goal of this project seeks to approach to real solution of the construction site. It is very important to compare also financial aspects, not only the technological. Last but not least, time requirements of construction plan and factual requirements of the customer. Constructive-technological project contains especially: technical report, site facilities, technologic regulation, schedule, financial budget, control and test plan, design of machinery, safety and health protection etc.
|
108 |
Výstavba objektu mateřské školy, Brno - Ivanovice, stavebně technologická příprava stavby. / The Development of the Building of the Kindergarten in Brno - Ivanovice, civil technological project.Pivcová, Tereza January 2014 (has links)
Subject of this master thesis is the structural and technological support for the construction of nursery school in Brno Ivanovice. The aim of master thesis is to design time, financial and material resources. The thesis contains technical report, time schedule, building-site, technological standard, control and quality inspection plan and study of realization of the main stages. Part of the thesis is trade’s specialization.
|
109 |
Stavebně technologický projekt polyfunkčního bytového domu / Construction technological project of polyfunktion house with block of flatsHromník, Lukáš January 2014 (has links)
Construction technological project of polyfunctional flat house SO 107, solves the realization of reinforced concrete monolithic ceiling construction the financial and time schedule, technological instruction of concreting, proposal of mechanization, the technical report of technology construction project. The proposal formwork system Multiflex.
|
110 |
Stavebně technologické řešení bytového domu Hubertus v Karlově Studánce / CONSTRUCTIVE - TECHNOLOGICAL PROJECT OF BUILDINGMrózek, Jakub January 2014 (has links)
In my master thesis I deal with construction and technological solutions of Residental House Hubertus in Karlova Studánka. Thesis mainly includes technical report of the construction technology project, coordination situation of building with relationships to the wider transportation routes, the implementation study of the main technological stages of the main building structure, technical report of building-site equipment with drawings of building-site equipment, design of the main building machines and mechanisms, project calculation budget, calculation of construction by the building structures, time schedule, technological prescription ceiling slab with inspection and test plan.
|
Page generated in 0.0676 seconds