• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 161
  • 10
  • 5
  • 1
  • 1
  • Tagged with
  • 178
  • 178
  • 145
  • 131
  • 131
  • 129
  • 129
  • 128
  • 125
  • 122
  • 119
  • 114
  • 113
  • 111
  • 109
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
141

Bytové domy A a B v Nemocniční ulici v Uničově - stavebně technologická příprava stavby / Apartment buildings A and B in the Nemocniční street in Uničov - constructive-technological preparation of the construction

Faltynková, Pavla January 2012 (has links)
This thesis deals with constructive -technological solutions of construction of two residential buildings A and B in Uničov. The thesis includes preparation and construction site equipment, technological prescription for implementation of anhydrite floors, time schedule and financial plan of construction, project budget, monitoring and test plans, instructions for maintenance, fire problem solution and security plan for requirements of the EMS.
142

Stavebně technologický projekt přístavby objektu Nejvyššího soudu ČR v Brně / Construction technology project of extension of the Supreme Court building in Brno

Coník, Šimon Unknown Date (has links)
Theme of the diploma thesis is a construction technology project extension of the building of the Supreme Court of the Czech Republic in Brno. The content of the diploma thesis is the study of the main technological stages of the main building, solution of wider transport relations with a focus on building supply, objects schedule, time schedule of the main building. The work also includes the project of construction site equipment, design of the main construction machines and mechanisms, technological regulations for special foundations and rough construction, which are supplemented by control and test plans and a plan for securing material resources. As part of other assignments, As part of other assignments, I process occupational health and safety, ecology and environmental protection for selected construction processes, itemized budget for special foundation and rough construction
143

Skladovací hala č. 2 v Rousínově - stavebně technologický projekt / Storage hall No. 2 in Rousínov - construction-technological project

Gottvaldová, Denisa Unknown Date (has links)
The subject of my diploma thesis is a construction-technological solution for realization of a storage hall in Rousínov. The work deals with a time and financial plan for all buildings of the project Storage Hall, Rousínov. A technical report, a study of the implementation of the construction’s individual stages, a design and assessment of transport routes, a design of the construction site equipment and a design of the machinery were prepared for the building No. 2. An itemized budget with a statement of acreage and construction schedule was prepared. A technological regulation and a control and test plan were prepared for the implementation process of the wire-reinforced concrete industrial floor. Within the diploma thesis, a technological regulation for the implementation of a reinforced concrete retaining wall was prepared. Noise pollution caused by the construction site was examined and evaluated in a noise study. The environmental requirements for the storage hall building No. 2 were processed.
144

Výrobní hala v Černé Hoře - vybrané části stavebně technologického projektu / Production Hall in Černá Hora – Selected Parts of Construction-technological Project

Různar, Daniel Unknown Date (has links)
The topic of my master's thesis are selected parts of the construction technology project Production Hall in Černá Hora with administrative part. Thesis contains engineering report, construction budget, time schedule for the whole construction, deployment of mechanisms and staff, project of construction site, study of the implementation of the main technological stages, the most appropriate construction mechanisms, routes of mechanisms, ranges and travels of mechanisms, financial and time schedule of the main building, technological specification for established pilots and montages of prefabricated skeleton, control and test plan, implementation of pilots, proposals of design of movement mechanisms, comparison of cladding of ventilated facades, skeleton assembly procedure diagrams and noise study of the construction site.
145

Příprava realizace výrobní haly Tescan / Preparation of realization of production hall Tescan

Hlávka, Jan Unknown Date (has links)
The topic of this diploma thesis is the preparation of the realization of the production hall of the company Tescan. The thesis contains a technical report on the construction technology project, the coordination situation, the time and financial plan of the construction. Furthermore, the project addresses the design of construction site equipment and machinery for each stage, the schedule of the main building, the plan of its supply of materials for the rough construction and technological regulations for the substructure of the building, to which the inspection and test plan applies. The next assignment deals with the budget of the main building, health and safety plan and the issue of formwork needed for implementation. The specialization in the area deals with the design and assessment of industrial floors and solutions for securing a construction pit.
146

Příprava realizace Rezidence Bučovických teras / Preparation for the implementation of the Bučovice Terrace Residence

Loukota, Michal Unknown Date (has links)
The subject of the diploma thesis is the implementation of apartment buildings in Bučovice, specifically focusing on the apartment building "X". It deals with a construction technology project. Its content is a technical report on the construction technology project, traffic relations for the transport of materials and machines to the construction site, technical report on the construction site equipment, construction technology study, machine design, elaboration of technological regulation for monolithic ceiling construction and infiltration tank. The chapters on safety and health protection at work on the construction site, the LEED certification system and a noise study for earthworks are also elaborated. Several diagrams of the procedure of execution of individual constructions, time and financial plan, selected details are elaborated. The thesis contains 30 appendices.
147

Bytový komplex Kadetka, příprava realizace stavby / Apartment Complex Kadetka, Preparation for Building Realisation

Páleník, Tomáš Unknown Date (has links)
The subject of the diploma thesis is to elaborate a selected part of the construction technology project for Apartment complex Kadetka - preparation for building realisation. Specifically, this is an underground garage and object C. In the course of the creation of project, the objects A and B, incorporated in the project of the construction site equipment, were also taken into account. The content of the work is a technical report to the construction technology project, evaluation of transport routes, time and financial plan, individual realization phases of the main building phase, design of the main building machine and mechanisms, time schedule for rough construction, plan for securing material resources, elaboration of technology regulations for underground monolithic reinforced concrete structures and check and test plan. The thesis also includes an item budget for the apartment house made with Build Power S software.
148

Výukový pavilon 2. LF Univerzity Karlovy v Praze – stavebně technologický projekt / Educational pavilion of the 2nd medical faculty of Charles university in Prague – vonstruction technology project

Paštika, Martin Unknown Date (has links)
The subject of this diploma thesis is technological preparation of educational pavilion 2.LF UK in Prague 5. The diploma thesis contains study of the main technological phases of the object, project of the site equipment, useful machines, time schedule, budget, technological prescription for reinforced concrete construction, project of the formwork for floor slab, control plan. The basis for technological preparation in this diploma thesis is design documentation.
149

Realizace bytového domu v Brně - stavebně technologický projekt / Implementation of Apartment House in Brno - Building Contruction Project

Pospíšil, Dominik Unknown Date (has links)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
150

Stavebně technologický projekt objektu knihovny / The library building technological project

Brandtner, Michal January 2018 (has links)
The subject of this final thesis is the building technological project of the library on the street of Kravi hora in the Brno. The final thesis includes a technical report, a coordination situation, a situation of the construction with wider relations with transport route links, a time schedule and financial plan of the construction, a site equipment project, a design of the main machines and mechanisms, a time schedule of the main building object, a supply plan and a plan for transport routes, a technological regulation for cast-in-place floor structure, a control and test plan, a health and safety plan at work on a construction site binding for a carcass, an itemized budget for carcass, a comparison of the solutions for realization of the cast-in-place floor structure and the technological regulation for technology of capture of rainwater for further use.

Page generated in 0.0452 seconds