Bytové domy v Brně, Bystrci - příprava a organizace výstavby / The Block of Flats in Brno, Bystrc - Project Planning and ManagementŠarlejová, Petra January 2014 (has links)
This thesis deals with the project planning and management of the construction of two houses of flats in Brno – Bystrc, Šemberova street. The houses of flats are designed as a newly built five floors above ground and one basement floor. The supporting system is made from brick ceramic blocks, underground floor is made of concrete blocks. This thesis processes technological project of building as preparation and building site equipment, use of machines necessary for implementation of the construction, monitoring and test plan, technological steps for basement walls of shuttering blocks. Finally, in this thesis dealt with time and cost of construction of houses of flats.
|
162 |
Rekonstrukce a přístavba Městského muzea Česká Třebová - příprava realizace a řízení stavby / Reconstruction and exctension of the City Museum Česká TřebováStrnadová, Lenka January 2014 (has links)
Master thesis solves construction and technological project which deals with data processing, documentation and technological processes of building reconstruction and extension realization in Muzeum of Česká Třebová. The work contains technological building study, assessment of relationships to the wider transportation routes, time and financial plan, building-site organization project, design of the main building machines and mechanisms, technological prescriptions for excavation work and micropile injection, occupational safety and health protection management, project calculation budget.
|
163 |
Komunitní centrum v Českých Budějovicích - stavebně technologický projekt / The community center in the Czech Budejovice - Construction Technology ProjectVondrák, Tomáš January 2015 (has links)
The theme of the diploma thesis is the construction technology project construction of a community center in the Czech Budejovice. The work describes the study of the main stages of technological, financial and construction schedule, itemized budget and technological prescription for performance building envelope. A substantial part of the work is to perform a technological prescription ceiling cladding structure above 1.NP, which is supplemented by technical-economic balance for the implementation of this ceiling construction, along with formwork drawings describes the optimal design of monolithic ceiling structure above 1.NP. Suitable design of the implementation process of the ceiling structure is achieved by reducing the cost of implementation of nearly 10% and shorten the length of the lease formwork system of almost 34% compared to the original assumption.
|
164 |
Rekonstrukce areálu učiliště Dubňany. Stavebně technologická příprava stavby. / 1. Reconstruction of the vocational school Dubňany. Construction Technology PreparationDohnálek, Marek January 2015 (has links)
The subject of this technological preparation of construction is to find out scope of work needed for reconstruction of former miners school in Dubňany.In Czech Republic exits plenty of these abandoned places and this master thesis should serve as an example of reconstruction of some theirs parts.Within this project I would like to valorize the experience gained from excursion to foreign countries, where the passive and low-energetic buildings are common.Missing project documentation of some part of this facility was replaced by 3D modelling based on my own laser measurement.The main object SO 01 has been already rebuilt into passive apartment building but without building-technological study and proper project documentation.Due to missing foundations and confidential internal documentation of the construction company is impossible to compare the real material, human and financial resources with those mentioned within this thesis. The master thesis contains technical report for the building-technological project, coordination of the transport routes, chronological and financial plan, realisation of the main technological steps, equipment of the construction project , draft of machinery, time schedule of the main project, plan of getting the needful resources, technological regulations, control and probationary plans, disposal of asbestos reports, owning contract, two roof decks comparison from the point of view of thermal technology and specialization from the building field.
|
165 |
Stavebně technologický projekt pavilonu laboratoří technologií Akademie věd v Brně / Constructional and Technological Project of Laboratoty Pavilion for Technology of AS in BrnoCihelka, Karel January 2015 (has links)
The topic of this master thesis is dealing with selected parts of the constructional and technological project of laboratoty pavilion for technology of AS in Brno. Thesis is mainly focused for technological instructions of ground works, support of next building and solving of city center problems. Components of this thesis are evaluation plans and work place safety protocols. Next content of thesis are study of main technological phases, time and finanical plans, items budget, selected details, construction site equipment and design and verification of tower crain.
|
166 |
Stavebně technologický projekt rozšíření chráněné dílny v Třinci / Construction technological expansion project of sheltered workshop in TrinecGwóźdź, Dariusz January 2016 (has links)
The subject of graduation thesis is a building-technological study of production and warehousing hall and headquarters of Ergon protected workshops in Třinec. The work is prepared on the basis of the project documentation. This consists of 8 building objects( 2 main building objects and 6 engineering objects). Building object SO 01-assembly and warehousing hall will be used for installation of assembly lines for simple mounting of imported parts and for semi automatic painting line equipment. Building object SO 02- headquarters building will be used for social activities of employees (WC. showers, social room , cloak rooms) and office premises. The main aims of graduation thesis are : project of construction site equipment including of time and economical evaluation, time schedule and financial plan for objects, study of main phases of project realisation for objects SO 01 and SO 02, project of main building machines including their radius( reach), time schedule of building object SO 02, technological prescript for steel construction preparation of object SO 01 with control and check plan.
|
167 |
Administrativní budova ESKO-T, stavebně technologický projekt / Administrative building ESKO-T, construction technology projectVochyán, David January 2017 (has links)
The aim of this thesis is compile building and technological project of new office building of the company ESKO-T in Třebíč. This is a two-storey building, build technology cast-in-place longitudinal reinforced concrete frame with mono-pitched roof. Work is consist of a possible solution of steel, concrete and formwork of rental shop to building. Building and technological project, technological regulation for concreting, draft machine configuration, documentation broker transport relations, the crane card and concrete pump, control od worte quality, time schedule and building budget rough upper construction, environmental protection, occupational safety and health, object work schedule and price comparison concreting with hanging silo for concrete and concrete pump.
|
168 |
Stavebně technologický projekt výrobní haly v Uherském Hradišti / Construction technology project of production hall in Uherske HradisteRadmil, Aleš January 2017 (has links)
The subject of this diploma thesis is the solution of selected components of construction-technology project construction of the II. stage production hall of the company Schlote Automotive Czech Ltd. This work includes financial, temporal, technical and technological aspects of the construction process. For selected component is created technologic direction and inspection plan.
|
169 |
Stavebně technologický projekt přípravy a realizace Domova pro seniory Žacléř / Construction project for implementation of Retirement home ŽacléřBonaventura, Pavel January 2022 (has links)
The aim of this diploma thesis is to prepare the construction of a Home for the Elderly in Žacléř. The work deals with technical regulations for the dismantling of asbestos roofing, demolition work and monolithic structures. For these regulations, a time plan for the implementation of monolithic structures, a control and test plan for monolithic structures, an itemized budget and a time and financial plan - object-oriented will be prepared. Furthermore, this work contains the coordination situation of the construction with broader transport relations, the design of the assembly machine, the report for the construction site equipment with drawings of the construction site equipment for individual technological regulations and last but not least the health and safety plan and assessment of construction noise. As part of the diploma thesis, several appendices were prepared for this stage, such as crane assessment, details of monolithic stair arms, noise wall scheme, budget for construction site equipment, environmental plan, ceiling and wall formwork scheme and staff balance for selected stages.
|
170 |
Stavebně technologický projekt výstavby administrativní budovy s garážemi / Construction technological project of construction of an administrative building with garagesHrabovský, Lukáš January 2022 (has links)
The subject of this diploma thesis is the elaboration of a construction technological project for the construction of an administrative building with garages in Prague. The building is located in an enclosed area in the Prague-Veleslavín district. The main subject of this thesis is the elaboration of a technical report, a coordination situation of the construction with broader relations of transport routes, a time and financial plan of construction - object, a study of implementation of main technological stages of building, a project of the site equipment, a design of main construction machines and mechanisms, a time plan of main building, a plan of material resources, a technological regulation for the implementation of monolithic ceiling structures, a quality control and testing plan for monolithic ceiling structures. The diploma thesis also includes the calculation of construction according to THU, a occupational health and safety plan, concreting economics, a noise study, a selected points LEED certification and a budget with site equipment costs.
|