• Refine Query
  • Source
  • Publication year
  • to
  • Language
  • 161
  • 10
  • 5
  • 1
  • 1
  • Tagged with
  • 178
  • 178
  • 145
  • 131
  • 131
  • 129
  • 129
  • 128
  • 125
  • 122
  • 119
  • 114
  • 113
  • 111
  • 109
  • About
  • The Global ETD Search service is a free service for researchers to find electronic theses and dissertations. This service is provided by the Networked Digital Library of Theses and Dissertations.
    Our metadata is collected from universities around the world. If you manage a university/consortium/country archive and want to be added, details can be found on the NDLTD website.
121

Příprava realizace bytového domu ve Dvoře Královém nad Labem / Preparation of realization apartment building in Dvůr Králové nad Labem

Možíš, Jan January 2016 (has links)
The subject of my diploma thesis is the construction-technological project of apartment house in Dvůr Králové nad Labem. Thesis is focused on the most optimal technological procedures of foundation construction on deep foundations and total external insulation by external thermal insulation composite system. Regulations are supplemented by inspectional and trial plans, appropriate machinery and equipment of assembly site. Included is also work safety, time schedule and budget of substruture. The most interesting thing of my thesis will be model of the noise load on the surrounding objects resulting from the construction of apartment house which will the proposed appropriate measures of noise control.
122

Příprava a organizace výstavby mostu na Silnici II/377 / Project planning and management of construction of the bridge on the road II / 377

Soukup, Ondřej January 2017 (has links)
The subject of this thesis the construction and technological preparation for the construction of the bridge ev.č. 377-007 across the Býkovka river in the municipality Rájec - Jestřebí, which is part of the reconstruction of a main road II / 377 Bořitov - Rájec. The thesis is elaborated a technical report on the structural and technological project, coordinating construction situation, the situation with wider relationships routes following the stages, time and financial plan – by objects, study the implementation of major technological stages of the building SO203 project site equipment, design of the main construction machines and mechanisms, the timetable of the main building structure, workers deployment plan, plan of machines usage, a plan for securing material resources for SO 203, technological regulation for the implementation of bored piles of, inspection and test plan for pilots, budget SO 203, sequence diagram construction, control and monitoring plan and calculation of bearing capacity of the bridge foundation piles.
123

Stavebně technologický projekt polyfunkčního objektu v Rosicích / Construction technology project of polyfunctional building in Rosice

Pelc, Miloš January 2017 (has links)
The thesis deals with construction technology project of polyfunctional building in Rosice. The parts of the thesis are the construction technology study, the assessment of transport realations, the proposition of mechanical composition and occupational health and safety (OHS/OH&S). The thesis also contains technological regulations for flat roof and white tank and control and test plans for them. There is also itemized budget with time schedule of structural work. Thesis also deals with comparison of damp proof membrane and waterproof concrete.
124

Výrobní areál LIWA v Pelhřimově - příprava realizace a řízení stavby / LIWA manufacturing facility in Pelhřimov - implementation of construction

Jůn, Michal January 2017 (has links)
The aim of the thesis is the process of building technological project LIWA manufacturing facility in Pelhřimov. It deals mainly a technological process for the realization of the main building. The thesis contains a technical report, technological specification, control and test plan. Other parts of the work are time and financial plan, machine and mechanic design, project about equipment of construction site and time schedule. The annexes are further addressed drawings of the building site equipment.
125

Vybrané části stavebně technologického projektu při modernizaci úseku dálnice D1 / Modernization of higway D1- Selected parts of the construction technology project

Kocman, Jan January 2017 (has links)
The diploma thesis is dealing with selected parts of construction technology project of modernization the oldest and the most busiest highway D1 – tract 21 near Velká Bíteš. This thesis leads to solve the problem of highway reconstruction during the unrestricted traffic . Project is divided into constituent phases. I have designed phase time-schedule, the most important machine schedule and the traffic leading scheme. There was chosen one particular tract and there were designed following documents: detailed time-schedule, material supply plan and structure process scheme. In addition the following documents have been designed: technological method of concrete highway layers, inspection and test plan, a situation of building equipment, technical report of the object, health and safety solution.
126

Stavebně technologický projekt laboratorně administrativního objektu / Construction Technology Project laboratory administrative building

Labudová, Martina January 2017 (has links)
This thesis deals construction technology project of laboratory administration building at the University Hospital Ostrava. Attention will be focused on the construction of the main building. The author focusses on the main technological stages of construction, time and financial planning. Selected construction processes are elaborated in terms of the execution of works, quality control and occupational health and safety. The thesis is supplemented by attachments.
127

Bytový dům Vídeňská -stavebně technologický projekt / Viennese apartment house -building technology project

Staněk, Martin January 2017 (has links)
This thesis is focused on selected parts of building technological project apartment house Videnska in Brno concretly for lap C1 and C2. The project contained technical report, coordinating situation with distinguished trafic routes, object time plan and financial plan, study of main technological lap, technical report of building equipment and drawing of building equipment for differents lap, the design of mechanical arrangement of machine, the work schedule for construction, plan for securing material resources for monolithic ceiling, technological prescript and control trail plan for monolithic cailing, budget and design of lifting mechanisms
128

Městský úřad Přelouč, příprava a organizace výstavby / Project planning and management of construction Municipal Authority Přelouč

Malina, Marcel January 2017 (has links)
The content of this master's thesis is architectural and technological project of new built administration building Přelouč city. This project contains technological instruction how to build supporting structures from reinforced concrete, suggestion of used machinery,time schedule, quality plan, detailed costing, building management, design of work site and plan of work safety.
129

Bytový komplex LIVE UP v Brně - příprava realizace stavby / LIVE UP apartment complex in Brno - planning of implementation of construction

Dejmalová, Hana January 2017 (has links)
The subject of the master´s thesis are selected parts construction technology project apartment house LIVE UP in Brno – Bohunice. It is a new building with one underground floor and six overground floors. Construction of the house is monolithic and upper floors are bearing masonry walls. The work includes technical reports, study the implementation of major construction phases, organization of the construction, technological regulation of flat single-roof, itemized budget with the statement of measurements, time schedule, inventory of machines.
130

Pavilon F Základní školy ve Šlapanicích – stavebně technologický projekt / Pavilion F of the Elementary School in Šlapanice – Building Construction Project

Barák, Libor January 2022 (has links)
Theme of the diploma thesis is an elaboration of a building construction project for Pavilion F of the Elementary School in Šlapanice. This thesis deals with the engineering report for the construction technology project, the study of the implementation of the main technological stages of the building, solving broader transport relations with the design of the building supply, object time and financial plan, time schedule of the main construction object, project of the site facilities, design of the main construction machines and mechanisms for selected technological processes, technological regulation for the execution of monolithic constructions, control plan and test plan for the execution of monolithic constructions, the balance of workers and the deployment of main construction machinery and a health and safety plan for selected construction processes. In this diploma thesis, there are also construction calculation according to technological economic indicators, itemized budget of selected technological processes and formwork drawings.

Page generated in 0.0432 seconds