Spelling suggestions: "subject:"time schedule"" "subject:"lime schedule""
151 |
Skladovací hala PFM Flexi - stavebně technologický projekt / PFM Flexi storage hall - construction technology projectChroustovský, David January 2018 (has links)
The aim of this diploma thesis is the design of an effective construction-technological project for the construction of reinforced concrete prefabricated storage halls by PFM-Flexi, s.r.o. The solution of the chosen problem is the design of the building site equipment, the verification of the transport routes of the key materials, the assembly schemes, the technological regulation and the control and test plan for the precast reinforced concrete frame, the BOZP plan, the comparison of the two versions of the installation in financial terms, the budget item and the schedule of the main building, timetable, calculation timetable and environmental aspects of the construction.
|
152 |
Příprava realizace bytového domu v Brně - Modřicích / Preparation for the construction of an apartment building in Brno - ModřiceRůžička, Radek January 2019 (has links)
The diploma thesis deals with the lower and upper rough building of a apartment building. It includes a technical report, broader transport routes, a study of the implementation of the main technological stages, a technical report of the construction site equipment, the design of the main building machines and mechanisms, a plan for providing material resources for a reinforced concrete ceiling, a technological regulation for the rough bottom and top structure, work and monolithic constructions, gross building budget, risk plan and their measures, statement of the dimension and network graph for finishing works, thermal technical assessment of external structures, drawing of site equipment, situation, original state of the land and ramp diagram. It also contains time and financial plan of the building, schedule of the main building, schedule of construction and disposal of construction site equipment and balance of machines and workers.
|
153 |
Administrativní budova Lomnického - stavebně technologická příprava stavby / Administrative building Lomnického - Building technology preparation of constructionHanzlík, Vlastimil January 2019 (has links)
This diploma thesis focuses on the construction and technological preparation of the office building in the Lomnického street. The aim of this work is to choose the appropriate construction process. The thesis contains a technical report of a construction and technological project, solutions of wider transport relations, time and financial object plan, itemized budget, design of a site equipment, design of the main building machines and mechanisms, time schedule, technological regulation, inspection and test plan, calculation of two options of the excavation of building pit and details to waterproofing of the substructure. In detail, the thesis is dedicated to secure the building pit enclosed by diaphragm walls.
|
154 |
Montovaná hala, areál firmy Bosh Diesel s r.o. - stavebně technologická příprava stavby. / Prepared hall of the company Bosh Diesel s.r.o. - civil technical project.Koláček, Ivo January 2019 (has links)
The masters thesis prepares the project of a prefabricated hall in the premises of Bosch Diesel s. r.o. The work completely elaborates the technical report, the coordination situation with the relations to the wider transport routes, the study of the main technological stages, the project of the building site, the design of the machines, the schedule of the main building, the material and human resources, the technological regulations, the control and test plan, safety and health protection during work, noise study, budget and building details.
|
155 |
Stavebně technologický projekt výjezdové základny zdravotnické záchranné služby v Zábřehu na Moravě / CONSTRUCTION AND TECHNOLOGICAL PROJECT OF THE BASE OF THE EMERGENCY MEDICAL SERVICE IN ZABREH NA MORAVETůma, František January 2019 (has links)
This diploma thesis deals with the construction project of the outbound base of the emergency medical service in Zabreh na Morave. More specifically, this thesis deals with the study of the development of the building, the technological regulation for the flat roof, and the subsequent chapters - design and assessment of the lifting mechanism, optimal design of the building site, timetable, itemized budget, control and test plan, etc. An interesting point is the simulation of the construction, where a 3D model and a video are created. The thesis is based on a borrowed documentation of the project.
|
156 |
Obytný areál Ponavia park v Brně, příprava a organizace stavby / Preparation and Organization of ConstructionHladký, Dominik January 2020 (has links)
This thesis deals with the construction process of the apartment house Ponavia Park located in Brno. The thesis solves the individual realization phases of the main building phase. Building site equipment is designed for the projected construction process in three different variations. A technical report is also included in the building site. Critical points within the transport of materials and machines are also verified. A financial plan for the whole building is made as an summarizing time schedule for the apartment building. The sources for the financial plan are the figures taken from the Czech building objects classifications (JKSO). The summarizing time schedule is made in MS Projekt software and it’s designed as a Gantt diagram. A design of the main building machines and mechanisms was also made for the projected construction process. All of the machines were assessed for their respective required function on the building site. Also included in this thesis is a construction method for the reinforced concrete structures. The construction method deals with the realization process of waterproof concrete, reinforcement binding, formwork of the vertical and horizontal structures and also the process of concrete curing. The construction method is followed up by quality control and test plans for reinforced concrete structures, and a construction site safety plan that is made in the form of predicted main safety risks at the building site. For the noise load on the surrounding buildings a noise study is made. The study examines the intensity of noise in the protected outdoor space. This study was made in the Hluk+ software. The thesis also includes an item budget for the apartment house that was made in Build Power S software.
|
157 |
Bytový dům Prostějov, stavebně technologická příprava stavby. / Residential Building, civil technical projekt.Pokorný, Jan January 2020 (has links)
In my diploma thesis, I focus on a building technology project of an apartment house in Prostějov. My work aims to design an optimal construction process. The thesis consists of a technical report, coordination drawing, project of the building site, building machines and mechanisms, time schedule and financial plan, description of technological process of the ventilated facade and of the monolithic reinforced concrete vertical structures including quality controls and testing plans. The process of making ventilated facade in comparison with the ETICS system is presented in more detail. Because the construction works take place in a city centre, the study of noise on the construction site is included as well.
|
158 |
Příprava realizace dostavby klinické hematologie FN Brno / Preparation of realization of completion of clinical hematology, University Hospital BrnoPrůcha, Aleš January 2020 (has links)
The aim of this diploma thesis is a solution of the extension of clinical hematology of the Faculty Hospital Brno. The thesis deals with the technological regulation for steel construction, coupled ceiling concrete slab with other topics including an inspection-check plan, a time schedule for carcass, time and financial schedule for structures and an item budget. In addition, this work includes the coordination site-layout of the construction with wider transport relations, mechanical assembly, the principles of the organization of site equipment and occupational safety and health risks. Finally this thesis contains several assessments for cranes, scheme of principles of fixing steel columns into structure, scheme of laying building envelope, LEED, site equipment financial assessment.
|
159 |
Stavebně technologický projekt pro Mezinárodní centrum klinického výzkumu Fakultní nemocnice u sv. Anny v Brně / Construction technology project of the International Clinical Research Center of St. Anne's University Hospital BrnoKozla, Dávid January 2020 (has links)
This diploma thesis solves the construction technology project of the International Clinical Research Center of the St. Anne’s University Hospital, Brno (ICRC), namely the first stage of the construction of the buildings "B1" and "C1". It tries to design an ideal technological process of construction with respect of local conditions. Technologically it focuses mainly on the issue of special foundation, namely protection of excavation pit with secant pile wall and pile foundation. There are processed technological regulations, time and financial plans, construction budget, control and test plan, plan of heavy equipment and safety or environmental requirements. Everything is supplemented by attachments and drawing documentation.
|
160 |
Omega Sport Olomouc - centrum sportu a zdraví, stavebně technologická příprava stavby. / Omega Sport Olomouc - Sport and Health Center, civil technological project.Bartoněk, Vratislav January 2014 (has links)
The master's thesis is elaborated on the basis of the project of the Sport and Health Center Olomouc. The project consists of two main buildings – the object of NH Hotel and the Sports Center Omega. The hotel also includes a conference center with three conference halls and covered parking. The object of Omega Sports Center is composed of sports halls for squash, badminton and tennis, along with changing rooms, wellness area and operational background of the object itself. The sports center also incorporates outdoor tennis courts and an underground tunnel connecting the Omega center and the NH Hotel. This thesis deals with the civil technological project of the building site and involves mainly the technical report of civil technological project, the study of realization of the main technological stages of the building object, the project of organization of construction, time schedule of aforementioned two main buildings, the technological standard with test and execution plans for the execution of underground construction by the impermeable concrete technology and for execution of variant solution of tennis hall roofing. Further, a comparison of the alternative roofing technology with current used roofing technology is performed, including the drawing documentation of new roofing alternative.
|
Page generated in 0.0726 seconds