Obvodní oddělení policie ČR v Brně - Bohunicích, příprava realizace stavby / District Police Department of the Czech Republic in Brno-Bohunice, Preparation for ConstructionDubecký, Tomáš January 2022 (has links)
The aim of the diploma thesis is to prepare the construction called the District Police Department of the Czech Republic in Brno, Bohunice. The diploma thesis contains a technical report on the construction technology project, which deals with architectural and construction design solutions, coordination situation and transport routes, where critical points are assessed time and financial plan of construction, where all construction objects are described with their time and financial schedule, a study of the implementation of the main construction stages, which addresses the various stages of construction. The diploma thesis contains a technical report, item budget, plan for the establishment and liquidation of buildings and drawings of construction site equipment for each stage, design of the main construction machinery for the construction. A detailed time plan of the main building, a plan of its supply of materials for the rough construction was prepared for the given construction. Furthermore, the work contains a technological regulation for a reinforced concrete monolithic staircase, which is related to the control and test plan for a reinforced concrete monolithic staircase. The next assignment deals with the item budget of the main building for the rough construction, the drawing of the formwork for the reinforced concrete monolithic staircase and the economic assessment and evaluation of construction cranes.
|
132 |
Príprava realizácie polyfunkčných domov v Bratislave / Preparation for the implementation of the multifunctional buildings in BratislavaJaníček, Peter January 2022 (has links)
This diploma thesis deals with the preparation of the implementation of multifunctional buildings in Bratislava. These are three detached multi-storey apartment buildings connected by a joint basement. The diploma thesis includes a technical report to the construction technological project, a study of the implementation of main technological phases, solving of broader relations of transport routes with the design of supply routes, a time schedule and a financial plan of the object, a detailed time plan for the rough substructure and rough superstructure, a building site equipment project, a machine assembly design and its assessment, a technological regulation for monolithic structures, a control plan and test plan for monolithic structures, a specification of the time period of the removal of the formwork of monolithic structures, an occupational safety and health plan and selected points of the LEED certification. The thesis also includes a plan for securing resources for the rough structure with added schedules of workers, machines and building materials, a cost estimation budget of selected technological processes, a noise study, and a financial analysis of the expected investment profit.
|
133 |
Obytný soubor Troubsko - stavebně technologický projekt / Residential complex Troubsko - construction technology planJurák, Ondřej January 2022 (has links)
The aim of the diploma thesis is to elaborate a selected part of the construction technology plan for the Residential complex Troubsko. Specifically, it is focused on a pair of mirror-image apartment buildings marked SO 12.11 and SO 12.12. The building is located in the area of a former pond, which was backfilled in the past. The foundation strips are therefore placed on vibrated gravel pillars. The structure of the building is proposed as a traditional masonry building, the horizontal load-bearing structures consists of the cast-in-place reinforced concrete floor and the roof structure is designed as a flat roof. The thesis consists in a technical report pertaining to the construction technology plan, evaluation of transport routes, technological regulation for the cast-in-place reinforced concrete floor above 1PP and a time schedule for rough construction. Also elaborated are construction site equipment including a drawing and text part, a control and test plan, itemized budget with bill of quantities for rough construction, design of machine sets and work safety solutions are elaborated.
|
134 |
Stavebně technologický projekt hotelu v Ostrožské Nové vsi / Construction technology preparation of hotel in Ostrožská Nová vesKhamzina, Mariia January 2022 (has links)
The subject of this diploma thesis is civil technical project of a new building of the hotel Aztec in Ostrožská Nová Ves. The building was designed as a 6-storey building and will be used for accommodation and recreation. Thesis contains engineering report, a detailed time schedule for the main building object, project of construction site, technological notes and inspection and test plans for particular steps of construction, proposal of suitable machines and mechanisms required for construction and wider relationships of transport routes to construction site. It also includes protection of health and safety at work taking into account environmental protection.
|
135 |
Bytové domy v Bučovicích, objekt X - stavebně technologický projekt / Apartment houses in Bučovice, building X – building technology projectKrkošková, Adéla January 2022 (has links)
The subject of diploma thesis is the elaboration a selected part of construction technological project of an apartment houses in Bučovice. The selected part iswith the apartment building SO 01.X, on which rough construction will be solved . The apartment building consists of three above ground floors and is partially basement. An important part of the thesis is an item budget of the rough construction and the time schedule. The diploma thesis also deals with construction site equipment design, a study of the implementation of the main technological stages, design of the machinery, solution of the transport routes, technological prescription for selection operation, the protection of health and safety at work and environmental requirements for the construction of the building SO 01.X.
|
136 |
Stavebně technologický projekt výrobní a skladovací haly / Construction-technological project of production and storage hallMarek, Jiří January 2022 (has links)
This diploma thesis deals with construction-technological project of production and storage hall in Hradec Králové. The thesis deals with complex of the implementation of the construction and focuses in more detail on the implementation of both foundation structures and assembly of the steel frame. The project includes a technical report on the construction technology project, a study of the implementation of the main technological stages of the main building, design and assessment of construction routes, construction equipment project, financial and construction schedule, machine design, schedule and budget of the main building, control and test plan for foundation structures, and occupational safety and health.
|
137 |
Realizace bytového domu v Brně - stavebně technologický projekt / Realization of a apartment building in Brno - construction technology projectPospíšil, Dominik January 2022 (has links)
Theme of the diploma thesis is technical report of the technological project for apartment building Hroznatova – Brno - Zidenice, which will be realized on Hroznatova street. For object I prepare technical report of the technological project, studies of realization main technological phases, solution of wider transport relations, objects time and financial plan, time schedule, project for site facilities with drawing of four main technological phases, design of the main construction machines and mechanisms, technological specification for realization of horizontal monolithic reinforced concrete ceiling construction, health and safety solutions for the solved construction, where I evaluate concreting ceilings, balance of workers and main machines, inspection and test plan for constructions from technological specification. As other assignment I make a itemized budget for Etics and ceiling construction, calculation according to THU and comparative truck crane with tower crane.
|
138 |
Stavebně technologický projekt výrobní a skladovací haly ve Vlkoši u Kyjova / Construction technological project of the production and storage hall in Vlkoš u KyjovaProkop, Petr January 2022 (has links)
The aim of this diploma thesis is to create a construction-technological project of the production and storage hall Ahorn CZ, s.r.o. As part of this work, technical report, study of the implementation of the main technological stages, project of the construction site equipment, time and financial plan of the construction, design of the main construction machines and mechanisms, item budget and time schedule were prepared. Further the thesis contains two technological regulations and two control and test plans.
|
139 |
Mateřská škola Kamechy - vybrané části stavebně technologického projektu / Kindergarten Kamechy - selected parts of the construction technology planStrádalová, Aneta January 2022 (has links)
The subject of this dimploma thesis is conctruction-technology project of preparation and realization of kindergarten Kamechy in the city district Brno – Bystrc. The thesis contains technical report, coordination situation with transport routes, time and financial schedules, study of main technological phases, project of construction site and technical report of construction site, time schedule of main building, list of main construction machines and mechanism, material resourses plan. Necessary part of this thesis is technological regulation and control and test plan of implementation monolithic ceilings above the 2nd floor. At the end design and assessment of cranes, noise study, evaluation of the object according to LEED certification and safety and health protection plan for selected technological processes were prepared.
|
140 |
Výstavba školy Rajhrad – stavebně technologická příprava / Construction of school Rajhrad – construction and technological preparationKijonka, Jakub January 2012 (has links)
Subject of this master thesis is the structural and technological background for the construction of high school in Rajhrad. This consists of time and finanical plans, technological instructions for the reinforced concrete monolithic skeleton, time schedule, item budget, construction site layout, machinery configuration , audit and evaluation plans, work place safety protocols, environmental plan of the construction site.
|